Back to kitchen remodel contractors
Southface Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Jan 2021 to Jan 2021
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 never finaled. Typically 142 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2021 | Never finaled issued Jun 2021, no final | 12 Longview Ct | 3rd floor: (n) 385 sq ft wd deck over roof w/ new multi panel glazed doors & glass railing. abandon (e) gas fireplace flue. remodel kitchen & 2 bathrooms. construct (n) closets. (n) windows & doors at 3rd floor. (n) 163 sq ft family room, washer/dryer, & sink on 1st floor. install (n) natural gasDetails
3rd floor: (n) 385 sq ft wd deck over roof w/ new multi panel glazed doors & glass railing. abandon (e) gas fireplace flue. remodel kitchen & 2 bathrooms. construct (n) closets. (n) windows & doors at 3rd floor. (n) 163 sq ft family room, washer/dryer, & sink on 1st floor. install (n) natural gas | $287,000 |