Smarter Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Feb 2026
- Last 24 months
- 2 permits filed
34 permits since 2000: 25 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 199 days from filing to permit and 900 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2023 | Completed final sign-off Nov 2026 | 239 11th Av | horizontal addition -new deck at rear. interior remodel ref pa202310178814.Details
horizontal addition -new deck at rear. interior remodel ref pa202310178814. | $12,000 |
| Oct 17, 2023 | Completed final sign-off Nov 2026 | 239 11th Av | 1st flr: add 1 bedroom, den, 1 full bath. media room and interior staris connect to 2nd flr. 2nd flr: redmodel kitchen and bathroom. 3rd flr: remodel kitechn & bathroom, add 1 full bath. new deck under separate permit. replace windows at front with wood witu ogee lugs.Details
1st flr: add 1 bedroom, den, 1 full bath. media room and interior staris connect to 2nd flr. 2nd flr: redmodel kitchen and bathroom. 3rd flr: remodel kitechn & bathroom, add 1 full bath. new deck under separate permit. replace windows at front with wood witu ogee lugs. | $208,000 |
| Aug 7, 2019 | Never finaled issued Feb 2020, no final | 2034 24th Av | proposed new deck and stairs to connect 2nd fl to rear yare. replaced e window with new dbl pane patio door at 2nd flDetails
proposed new deck and stairs to connect 2nd fl to rear yare. replaced e window with new dbl pane patio door at 2nd fl | $2,000 |