Back to bathroom remodel contractors
Smart Building Inc.
- Based in
- Concord
- On San Francisco permits
- May 2006 to Jun 2026
- Last 24 months
- 16 permits filed
37 permits since 2000: 33 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 8 completed, 1 in progress. Typically 0 days from filing to permit and 60 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2026 | In progress issued Feb 2026 | 172 06th St | #314:replace-70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen.#214:replace 70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen&bathroomDetails
#314:replace-70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen.#214:replace 70 sf of drywall in kitchen,new kitchen cabinets and countertop,following existing layout,like for like.new light fixture in kitchen&bathroom | $20,000 |
| Jan 28, 2026 | Completed final sign-off Mar 2026 | 1150 Grant Av | unit# 12 install new upper (approx 6 lf) & lower (approx 4 lf)kitchen cabinets &countertop. following (e) layout like for like. no plumbing alteratoin. install new tile surround & flooring for bathroom shower like for like includes appropriate waterproofing. install new exhaust & hood per cenc1500-gDetails
unit# 12 install new upper (approx 6 lf) & lower (approx 4 lf)kitchen cabinets &countertop. following (e) layout like for like. no plumbing alteratoin. install new tile surround & flooring for bathroom shower like for like includes appropriate waterproofing. install new exhaust & hood per cenc1500-g | $12,500 |
| Jun 3, 2025 | Completed final sign-off Jun 2025 | 921 Howard St | 1202: comply with nov 202535469 and 202533497. install 10 lf of new cabinets (lower) + 26 sf of new countertop. following (e) layout. no plumbing alterations. replace exhaustfan in bathroom, includes relocating (e) wiring. replace drywall at areas where removed. no exterior work.Details
1202: comply with nov 202535469 and 202533497. install 10 lf of new cabinets (lower) + 26 sf of new countertop. following (e) layout. no plumbing alterations. replace exhaustfan in bathroom, includes relocating (e) wiring. replace drywall at areas where removed. no exterior work. | $25,000 |
| Feb 3, 2025 | Completed final sign-off Apr 2025 | 2500 Arelious Walker Dr | unit #213 to satisfy nov 202430796.: replace approximately 1,500 sf of drywall. install 48 sf of kitchen cabinets w/ new countertop, no plumbing alterations. following (e) layout. remove & replace (e) exhaust fan hall bath. replace approximately 800 sf of drywall in common hall areas.Details
unit #213 to satisfy nov 202430796.: replace approximately 1,500 sf of drywall. install 48 sf of kitchen cabinets w/ new countertop, no plumbing alterations. following (e) layout. remove & replace (e) exhaust fan hall bath. replace approximately 800 sf of drywall in common hall areas. | $45,000 |
| Dec 31, 2024 | Completed final sign-off Jan 2025 | 141 Eddy St | replace existing tub in 1st floor common bathroom w/ new american standard tub. following existing layout - includes replacement of existing shower valve and tile surround. replace existing exhaust fan and relocate existing electrical for new timer switch installation.Details
replace existing tub in 1st floor common bathroom w/ new american standard tub. following existing layout - includes replacement of existing shower valve and tile surround. replace existing exhaust fan and relocate existing electrical for new timer switch installation. | $56,400 |
| Sep 21, 2023 | Completed final sign-off Mar 2026 | 2598 Lombard St | response to nov 202308925. tenant improvement, bathroom fixtures, can lights. replacement of 2 exterior doors. bathroom remodel.Details
response to nov 202308925. tenant improvement, bathroom fixtures, can lights. replacement of 2 exterior doors. bathroom remodel. | $15,000 |
| Oct 14, 2022 | Completed final sign-off Dec 2022 | 318 Frederick St | unit 6 - 1st flr: convert closet into powder room 1/2 bath (18sf), raise partition wall. new door, sink, toilet, vanity (see plumbing). non structural electrical work.Details
unit 6 - 1st flr: convert closet into powder room 1/2 bath (18sf), raise partition wall. new door, sink, toilet, vanity (see plumbing). non structural electrical work. | $4,950 |
| Jun 2, 2009 | Completed final sign-off Sep 2009 | 141 Pierce St | remodel bathroom, new tile, new shower pan, new vanity. remodel guest bath, new tile. no structural. in kind.Details
remodel bathroom, new tile, new shower pan, new vanity. remodel guest bath, new tile. no structural. in kind. | $20,000 |
| May 31, 2006 | Completed final sign-off Feb 2007 | 4097 17th St | finish unfinished portion of bott0m floor, remodel 1 bathroom for 1 guest bedroom at 1 diamond entranceDetails
finish unfinished portion of bott0m floor, remodel 1 bathroom for 1 guest bedroom at 1 diamond entrance | $45,000 |