Skyblue Builders Inc
- Based in
- San Bruno
- On San Francisco permits
- Dec 2018 to Jul 2026
- Last 24 months
- 4 permits filed
41 permits since 2000: 34 completed, 2 in progress, 5 never finaled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2024 | Completed final sign-off Apr 2025 | 1619 Gough St | remove/dispose of approx 2950 sqft of siding/trims fr lightwell(facing south), west wall (rear of bldg)& north wall, not vis fr street. instl rockwool comfortbatt insulation. instl in-kind bevel case siding/trims. repl 7 csemt/7 sh windows. repl 15 winds/3doors. dryrot stairs <50%. all work in-kindDetails
remove/dispose of approx 2950 sqft of siding/trims fr lightwell(facing south), west wall (rear of bldg)& north wall, not vis fr street. instl rockwool comfortbatt insulation. instl in-kind bevel case siding/trims. repl 7 csemt/7 sh windows. repl 15 winds/3doors. dryrot stairs <50%. all work in-kind | $152,434 |