Back to kitchen remodel contractors
Sky River Builder Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Dec 2025
- Last 24 months
- 7 permits filed
11 permits since 2000: 4 completed, 6 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 3 in progress. Typically 95 days from filing to permit and 228 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | In progress issued Feb 2026 | 80 Valdez Av | kitchen remodel. all work in-kind. no structural work.Details
kitchen remodel. all work in-kind. no structural work. | $8,000 |
| Jan 24, 2025 | In progress issued Apr 2025 | 2689 23rd Av | revision 201509308493, ref 202212627597- to abate nov 202287963 and 2022003143enf for work to include partial 2nd fl kitchen and bathroom remodel, replace tub to shower at ground floor- straighten ground floor adu entry. replace selective windows at both 2nd and 3rd floor (facing street)Details
revision 201509308493, ref 202212627597- to abate nov 202287963 and 2022003143enf for work to include partial 2nd fl kitchen and bathroom remodel, replace tub to shower at ground floor- straighten ground floor adu entry. replace selective windows at both 2nd and 3rd floor (facing street) | |
| Dec 2, 2024 | Completed final sign-off Mar 2025 | 755 20th Av | replace swing door with pocket door at (e) 1/4 bath. renovate (e) shower into full bathtub. add (n) full bathroom at master room. relocate (e) stove and fridge at (e) kitchen. work to be completed in both 755 and 757 20th ave.Details
replace swing door with pocket door at (e) 1/4 bath. renovate (e) shower into full bathtub. add (n) full bathroom at master room. relocate (e) stove and fridge at (e) kitchen. work to be completed in both 755 and 757 20th ave. | $50,000 |
| Nov 22, 2024 | Completed final sign-off Nov 2025 | 780 24th Av | 2nd/f: relocate kitchen, add a bathroom & laundry, remove exterior stair, add a rear deck w/stairs. 3rd/f: add 2 bathrooms, remodel & rearrage bathroom. no work at garage levelDetails
2nd/f: relocate kitchen, add a bathroom & laundry, remove exterior stair, add a rear deck w/stairs. 3rd/f: add 2 bathrooms, remodel & rearrage bathroom. no work at garage level | $80,000 |
| May 15, 2023 | In progress issued Mar 2024 | 175 05th Av | fl 1: add adu per state law. add 1 bedroom, kitchen, great room and 2 full baths.Details
fl 1: add adu per state law. add 1 bedroom, kitchen, great room and 2 full baths. | $55,000 |