Sj Builders
- Based in
- Sausalito
- On San Francisco permits
- Sep 2023 to Feb 2026
- Last 24 months
- 8 permits filed
21 permits since 2000: 11 completed, 10 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
8 kitchen remodel permits: 3 completed, 5 in progress. Typically 0 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 10, 2026 | In progress issued Feb 2026 | 1943 Jackson St | in kind kitchen remodel and in kind 2 bathroom remodels like for like, upgrade plumbing and electrical. kitchen approx. 90 sq ft. each bathroom approx. 30 sq ft.Details
in kind kitchen remodel and in kind 2 bathroom remodels like for like, upgrade plumbing and electrical. kitchen approx. 90 sq ft. each bathroom approx. 30 sq ft. | $30,000 |
| Dec 23, 2024 | Completed final sign-off Dec 2024 | 825 Masonic Av | rev to pa# 2024-0614-4548; kitchen cabinet replacement, kitchen counter replacement built in cabinet in living room reduce scope no tile workDetails
rev to pa# 2024-0614-4548; kitchen cabinet replacement, kitchen counter replacement built in cabinet in living room reduce scope no tile work | $30,000 |
| Dec 12, 2024 | In progress issued Dec 2024 | 635 Ashbury St | unit 4, open wall for electrical and plumbing, patch walls when plumbing/electrical is complete. install 4" vent in exterior wall. replace kitchen countops. re-install sink/faucet. paint unit. all work like for like. use 5/8" type x gyp bd.Details
unit 4, open wall for electrical and plumbing, patch walls when plumbing/electrical is complete. install 4" vent in exterior wall. replace kitchen countops. re-install sink/faucet. paint unit. all work like for like. use 5/8" type x gyp bd. | $20,000 |
| Dec 12, 2024 | In progress issued Dec 2024 | 1221 Greenwich St | unit #5: like for like kitchen cabinet replacement. like for like countertop replacement.Details
unit #5: like for like kitchen cabinet replacement. like for like countertop replacement. | $10,000 |
| Jul 19, 2024 | In progress issued Jul 2024 | 2087 41st Av | like for like kitchen remodel. like for like bathroom remodel (2 total). like for like knob and tube replacement (cut lath/plaster) patch and paint. sheer wall installation garage/sheetrock installation garage insualtion install garage/all exterior walls.Details
like for like kitchen remodel. like for like bathroom remodel (2 total). like for like knob and tube replacement (cut lath/plaster) patch and paint. sheer wall installation garage/sheetrock installation garage insualtion install garage/all exterior walls. | $60,000 |
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 825 Masonic Av | unit 2: kitchen cabinet replacement, kitchen counter top replacement, bathroom tile installation (floor). no other work in bathroom. new built in cabinet in living room.Details
unit 2: kitchen cabinet replacement, kitchen counter top replacement, bathroom tile installation (floor). no other work in bathroom. new built in cabinet in living room. | $10,000 |
| Apr 2, 2024 | Completed final sign-off Dec 2024 | 1221 Greenwich St | unit 6. move electrical panel from bedroom to common area (kitchen area). upgrade panle from 30 amp to 40 amp. install 1 supplimental 500 watts electric wall heater. replace one window in bedroom, back of bldg, not street visible. less than 10% of heat per cenc 170.2(c)4e exception 3Details
unit 6. move electrical panel from bedroom to common area (kitchen area). upgrade panle from 30 amp to 40 amp. install 1 supplimental 500 watts electric wall heater. replace one window in bedroom, back of bldg, not street visible. less than 10% of heat per cenc 170.2(c)4e exception 3 | $10,000 |
| Apr 1, 2024 | In progress filed Apr 2024, not yet issued | 1221 Greenwich St | move panel from bedroom closet to common area (kitchen area). upgrade panel from 30 amp to 40 amp. install 1 wall heater in bedroom. replace one window in bedroom.Details
move panel from bedroom closet to common area (kitchen area). upgrade panel from 30 amp to 40 amp. install 1 wall heater in bedroom. replace one window in bedroom. | $10,000 |