Singha Construction Inc
- Based in
- Alameda
- On San Francisco permits
- Jun 2015 to Sep 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 12 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 319 days from filing to permit and 902 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2017 | Completed final sign-off Apr 2021 | 324 Peralta Av | horizontal/vertical addition distance 5'-10" convert basement to habitable living area with engava (family) room/sleeping room, bathrm, add new top floor w/ deck, 4 bedrm, 3 baths, provide full structural upgrage to current bldg codes.Details
horizontal/vertical addition distance 5'-10" convert basement to habitable living area with engava (family) room/sleeping room, bathrm, add new top floor w/ deck, 4 bedrm, 3 baths, provide full structural upgrage to current bldg codes. | $275,000 |