Back to bathroom remodel contractors
Singha Construction Inc
- Based in
- Alameda
- On San Francisco permits
- Jun 2015 to Sep 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 12 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 expired or cancelled. Typically 250 days from filing to permit and 476 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2019 | Expired or cancelled expired Oct 2025 | 760 14th St | revision to pa 2017-1120-4452 to each adu add 2nd bathroom, enlarge living rooms, kitchens & both bedrooms; remove (e) structural columns & reconfigure bathrooms; enlarge glazing at rear & side elevations; move laundry closets, lower slab approx 1'6".Details
revision to pa 2017-1120-4452 to each adu add 2nd bathroom, enlarge living rooms, kitchens & both bedrooms; remove (e) structural columns & reconfigure bathrooms; enlarge glazing at rear & side elevations; move laundry closets, lower slab approx 1'6". | $15,000 |
| May 8, 2018 | Completed final sign-off Jun 2018 | 1200 Gough St | unit 4c: partial remodel of bathroom. instlal new shower valve, install new recessed led lights (2), relocate gfci receptacle, install new gfci receptacle and install new tile in tub enclose. no work on (e) tub, tub drain, and toilet.Details
unit 4c: partial remodel of bathroom. instlal new shower valve, install new recessed led lights (2), relocate gfci receptacle, install new gfci receptacle and install new tile in tub enclose. no work on (e) tub, tub drain, and toilet. | $12,000 |
| Dec 22, 2017 | Completed final sign-off Apr 2021 | 324 Peralta Av | horizontal/vertical addition distance 5'-10" convert basement to habitable living area with engava (family) room/sleeping room, bathrm, add new top floor w/ deck, 4 bedrm, 3 baths, provide full structural upgrage to current bldg codes.Details
horizontal/vertical addition distance 5'-10" convert basement to habitable living area with engava (family) room/sleeping room, bathrm, add new top floor w/ deck, 4 bedrm, 3 baths, provide full structural upgrage to current bldg codes. | $275,000 |
| Nov 20, 2017 | Expired or cancelled expired Sep 2024 | 760 14th St | add (2) accessory dwelling unit (adu) per ord #162-16. each adu to contain (2) bedrooms, (1) bath, kitchen & living roomDetails
add (2) accessory dwelling unit (adu) per ord #162-16. each adu to contain (2) bedrooms, (1) bath, kitchen & living room | $225,000 |