Simply Better Remodels
- Based in
- Livermore
- On San Francisco permits
- Sep 2013 to Apr 2017
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 25, 2013 | Completed final sign-off Jul 2014 | 655 28th Av | revise original permit #201309096340 to replace studs and header of same size kitchen sindk wall and replace all siding in stair well area on opposite side of kitchen. reinstall windows after fix framing. replace studs and header in kitchen sink wall.Details
revise original permit #201309096340 to replace studs and header of same size kitchen sindk wall and replace all siding in stair well area on opposite side of kitchen. reinstall windows after fix framing. replace studs and header in kitchen sink wall. | $8,000 |