Back to kitchen remodel contractors
Silver Lining Design Build Co
- Based in
- San Francisco
- On San Francisco permits
- Jul 2019 to Jul 2026
- Last 24 months
- 4 permits filed
6 permits since 2000: 1 completed, 4 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 404 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2019 | Completed final sign-off Aug 2020 | 38 Lusk St | replace (e) kitchen and 2 baths in kind. replace (e) spiral stairs with new staircase. minor non structural wall to increase upstairs bath sizeDetails
replace (e) kitchen and 2 baths in kind. replace (e) spiral stairs with new staircase. minor non structural wall to increase upstairs bath size | $35,000 |