Sierra National Construction/Abc
- Based in
- Carmichael
- On San Francisco permits
- May 2010 to Jun 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 259 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2010 | Completed final sign-off Jan 2011 | 1257 06th Av | remove lath and plaster, door, some floor surfaces, cabinets,plmg fixtures, paint, trim. all new wiring electrical permit by electrical contractor. replace plaster with drywall, insulation, roof patch, install 5/8" type x gb at blindwalls, stairs and ceiling. all in unit 1257 6th ave.Details
remove lath and plaster, door, some floor surfaces, cabinets,plmg fixtures, paint, trim. all new wiring electrical permit by electrical contractor. replace plaster with drywall, insulation, roof patch, install 5/8" type x gb at blindwalls, stairs and ceiling. all in unit 1257 6th ave. | $300,000 |