Siena Pacific, Inc.
- Based in
- San Rafael
- On San Francisco permits
- Feb 2000 to Aug 2026
- Last 24 months
- 7 permits filed
42 permits since 2000: 18 completed, 5 in progress, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 1 completed, 1 in progress, 2 never finaled. Typically 164 days from filing to permit and 1636 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2024 | In progress issued Sep 2025 | 4365 23rd St | create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit.Details
create new adu in basement ord. 162-16 ab1114. infill (e) lightwell. relocate (e) stair from street level to upper floor to connect to main house. create new stair from street level to new basement adu. earth shoring is required under a separate permit. | $985,714 |
| Nov 5, 2021 | Never finaled issued Jan 2023, no final | 3045 Pacific Av | addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e).Details
addition of roof deck & retractable skylight, new reconfigured patio @ (e) rear yard, minoe excavation/foundation replacement @ mud rm. new sliding door 1/f rear, new window @ front & rear, replace (e) window & swing door @ living rm east facade w/sliding door, new interior stair to replace (e). | $700,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2026 | 65 Borica St | demo/relocate (e) interior stair to basement, partial excavation +/- 2' -5-1/2" (e) basement floor to meet minimum ceiling height of 8'-0". basement to include new mechnical room, new laundry, open storageDetails
demo/relocate (e) interior stair to basement, partial excavation +/- 2' -5-1/2" (e) basement floor to meet minimum ceiling height of 8'-0". basement to include new mechnical room, new laundry, open storage | $205,000 |
| Oct 6, 2005 | Never finaled issued Oct 2005, no final | 64 Russell St | rplace existing interior stair from 1st floor to garage, replace in kindDetails
rplace existing interior stair from 1st floor to garage, replace in kind | $3,000 |