Sherrod Cutom Builders
- Based in
- Rodeo
- On San Francisco permits
- Jun 2009 to Nov 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 21 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2009 | Completed final sign-off Jul 2009 | 1347 Divisadero St | comply with his nov# 200906462, dated 05/19/09. see attach.repair (e) dry rotted staircase less than 50%. replace (e) 2 x 6 joists to become 2 x 8 (p.t) @ 16" o.c. modify (e) guardrail to 2 x 6 redwood spaced less than 4" clear same configuration of stair as (e). install new handrail 34" & 38" high.Details
comply with his nov# 200906462, dated 05/19/09. see attach.repair (e) dry rotted staircase less than 50%. replace (e) 2 x 6 joists to become 2 x 8 (p.t) @ 16" o.c. modify (e) guardrail to 2 x 6 redwood spaced less than 4" clear same configuration of stair as (e). install new handrail 34" & 38" high. | $3,800 |