Back to kitchen remodel contractors
Shek Chung Ma
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Dec 2017
- Last 24 months
- 0 permits filed
37 permits since 2000: 28 completed, 3 never finaled, 6 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 16, 2016 | Completed final sign-off Jul 2020 | 2423 28th Av | renovation and remodel of 2 storey sfd. removal and addition of partitions. structural work, new electrical and hvac. new bathrooms and kitchen (remodel). enclosure of space on ground floor below bedroom.new windows in(e) openings around house in fiberglass wood windows visible by street per plans.Details
renovation and remodel of 2 storey sfd. removal and addition of partitions. structural work, new electrical and hvac. new bathrooms and kitchen (remodel). enclosure of space on ground floor below bedroom.new windows in(e) openings around house in fiberglass wood windows visible by street per plans. | $190,000 |
| Jun 22, 2015 | Completed final sign-off Aug 2015 | 1638 Grant Av | kitchen: install new cabinet, new counter, new sink, new stove, new flooring. bathroom: install new toilet, new vanity, new fauset, and new tile.Details
kitchen: install new cabinet, new counter, new sink, new stove, new flooring. bathroom: install new toilet, new vanity, new fauset, and new tile. | $16,000 |
| May 17, 2013 | Completed final sign-off Apr 2015 | 417 Grant Av | corrections to comply with notice of violation. improvent of extg office space, renovate extg restroom, staff's lounge and kitchen, close hightwell.Details
corrections to comply with notice of violation. improvent of extg office space, renovate extg restroom, staff's lounge and kitchen, close hightwell. | $15,000 |
| Mar 4, 2013 | Completed final sign-off Jul 2013 | 22 Wetmore St | remove & replace bathroom - bathtub, tile walls, tub enclosure, toilet, vanity & flooring, remove & replace lightwell covering & siding, remove & repair kitchen counter, repair wall damage, sub floor & framings under lightwell, bathroom & kitchen. re-lay carpet & floor coverings inside apt.Details
remove & replace bathroom - bathtub, tile walls, tub enclosure, toilet, vanity & flooring, remove & replace lightwell covering & siding, remove & repair kitchen counter, repair wall damage, sub floor & framings under lightwell, bathroom & kitchen. re-lay carpet & floor coverings inside apt. | $40,000 |
| Jul 1, 2005 | Completed final sign-off Jan 2006 | 2200 Sacramento St | remodling 1 kitchen & remodling 1 bathroom. kitchen: remove all cabinet & install new cabinet. bathrDetails
remodling 1 kitchen & remodling 1 bathroom. kitchen: remove all cabinet & install new cabinet. bathr | $15,000 |
| Jul 23, 2002 | Completed final sign-off Dec 2002 | 2341 Francisco St | replace kitchen cabinet,sink,stove,dishwasher.replace bathtub in unit 2341.Details
replace kitchen cabinet,sink,stove,dishwasher.replace bathtub in unit 2341. | $6,000 |
| Mar 28, 2002 | Completed final sign-off Dec 2002 | 2612 Jackson St | kitchen updated, bathroom updated, recessed lighting for ceilingDetails
kitchen updated, bathroom updated, recessed lighting for ceiling | $30,000 |