Shearman Construction Llc
- Based in
- Oakland
- On San Francisco permits
- May 2026 to Aug 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 21 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2026 | Completed final sign-off Sep 2026 | 4162 17th St | demo (1) existing fire floor backyard window and wall section. install (1) new exterior door in modified opening. construct new landing and stairs to existing grade with concrete landing at the base. all work restricted to rear yard. no street-facing modifications.Details
demo (1) existing fire floor backyard window and wall section. install (1) new exterior door in modified opening. construct new landing and stairs to existing grade with concrete landing at the base. all work restricted to rear yard. no street-facing modifications. | $12,000 |