Back to kitchen remodel contractors
Shaun Gelling Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2003 to Aug 2014
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2006 | Completed final sign-off Nov 2006 | 2130 Leavenworth St | replace of new kitchen cabinets. bring electrical to code. replace countertop.Details
replace of new kitchen cabinets. bring electrical to code. replace countertop. | $12,000 |
| Oct 27, 2005 | Completed final sign-off Mar 2006 | 1390 Hayes St | remodel kitchen & bathroom w/new finishes & fixtures convert existing study to laundry rm no structural alterations-no work outside of existing footprintDetails
remodel kitchen & bathroom w/new finishes & fixtures convert existing study to laundry rm no structural alterations-no work outside of existing footprint | $55,000 |
| Jan 14, 2005 | Completed final sign-off Apr 2005 | 585 Mangels Av | kitchen to be demoed. new elec & upgrade plumb to copper plumb remaining in existing locations. sheeDetails
kitchen to be demoed. new elec & upgrade plumb to copper plumb remaining in existing locations. shee | $15,000 |