Shao Fat Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2007 to Apr 2019
- Last 24 months
- 0 permits filed
50 permits since 2000: 43 completed, 6 never finaled, 1 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 32 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 11, 2018 | Completed final sign-off Oct 2018 | 643 Oak St | repair the handrail of the rear stairs, less than 50% of 3/f. to comply with nov201847122 and add to (e) pa201704063410.Details
repair the handrail of the rear stairs, less than 50% of 3/f. to comply with nov201847122 and add to (e) pa201704063410. | $380 |
| Jan 9, 2018 | Never finaled issued Feb 2018, no final | 422 Geary St | comply w/ complaint #201629342 - change ownership of (e) restaurant , new counter , remove & patch opening between (e) dining & (e) stair. basement floor area will be separate use . all work under separate permit.Details
comply w/ complaint #201629342 - change ownership of (e) restaurant , new counter , remove & patch opening between (e) dining & (e) stair. basement floor area will be separate use . all work under separate permit. | $1,000 |
| Oct 16, 2015 | Completed final sign-off May 2016 | 160 Boutwell St | remodel (e) kitchen/bathroom. re-built interior stair from 2nd floor down to ground floor & re-wire electrical lighting & install 3'x3' skylight. legalize 2 bedrooms, 1 bath room & laundry room at ground floor.Details
remodel (e) kitchen/bathroom. re-built interior stair from 2nd floor down to ground floor & re-wire electrical lighting & install 3'x3' skylight. legalize 2 bedrooms, 1 bath room & laundry room at ground floor. | $52,000 |
| Dec 17, 2013 | Completed final sign-off Dec 2013 | 724 Foerster St | repair the stair less than 50% , replace nine steps & one landing. not visible from street.Details
repair the stair less than 50% , replace nine steps & one landing. not visible from street. | $3,500 |
| Jun 13, 2013 | Completed final sign-off Jul 2013 | 778 30th Av | repair rear wood stairs, less than 50%, replace 2 threads, 2 posts, 1 stringer.Details
repair rear wood stairs, less than 50%, replace 2 threads, 2 posts, 1 stringer. | $400 |
| May 15, 2012 | Completed final sign-off May 2012 | 3226 Ortega St | comply with nov# 200565020-replace the front gate lock, trim down the front, wood fence to 3ft & take away plastic roof above the front stairsDetails
comply with nov# 200565020-replace the front gate lock, trim down the front, wood fence to 3ft & take away plastic roof above the front stairs | $800 |
| Oct 3, 2007 | Completed final sign-off Aug 2008 | 1414 38th Av | new two level rear deck with stairs. convert part of first floor storage into bedroom, family room and powder room.Details
new two level rear deck with stairs. convert part of first floor storage into bedroom, family room and powder room. | $40,000 |