Back to bathroom remodel contractors
Shanta Carpentry & Constr
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2020
- Last 24 months
- 0 permits filed
246 permits since 2000: 182 completed, 10 never finaled, 54 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 20 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2019 | Completed final sign-off Dec 2019 | 324 Hill St | dry rot repair around shower in upper rear bathroom. repair in kind. no structural workDetails
dry rot repair around shower in upper rear bathroom. repair in kind. no structural work | $12,500 |
| Jan 15, 2019 | Completed final sign-off Jan 2020 | 5529 Diamond Heights Bl | repair 2 side by side bathroom on main upper level, new vanity bathtub and shower tiles in each. repair in kind. no structural changes.Details
repair 2 side by side bathroom on main upper level, new vanity bathtub and shower tiles in each. repair in kind. no structural changes. | $38,500 |
| Dec 14, 2018 | Completed final sign-off May 2019 | 2998 Jackson St | unit # 3: dry rot repair in bathroom. demo all walls shower surround & toilet and replace with new. remodel bathroom. no structural changes/ repair/replace in kind.Details
unit # 3: dry rot repair in bathroom. demo all walls shower surround & toilet and replace with new. remodel bathroom. no structural changes/ repair/replace in kind. | $32,500 |
| Aug 6, 2018 | Completed final sign-off Jan 2019 | 1940 Vallejo St | apt 6: bathroom repair due to plumbing leak problem removed (remodel).Details
apt 6: bathroom repair due to plumbing leak problem removed (remodel). | $18,750 |
| Feb 20, 2018 | Completed final sign-off Jul 2018 | 474 10th Av | bathroom remodel (7'x7'), replace tub, sink & new tile around tub, repair plaster ceiling in hallway.Details
bathroom remodel (7'x7'), replace tub, sink & new tile around tub, repair plaster ceiling in hallway. | $25,000 |
| Jun 13, 2017 | Completed final sign-off Jul 2017 | 1618 Castro St | dry rot repair in lightwell outside, upper bathroom window, 16 sq. ft., no structural changes/repair in-kindDetails
dry rot repair in lightwell outside, upper bathroom window, 16 sq. ft., no structural changes/repair in-kind | $1,200 |
| Nov 30, 2016 | Completed final sign-off Jun 2017 | 422 28th St | dry rot repair in 1st floor bathroom. remove and replace fixtures after repair to floor & walls are complete. no structural changes. repair in kind.Details
dry rot repair in 1st floor bathroom. remove and replace fixtures after repair to floor & walls are complete. no structural changes. repair in kind. | $6,000 |
| Mar 11, 2015 | Completed final sign-off Jun 2015 | 2929 24th St | ti to add 2 new treatment rooms, curtain walls only. widen bathroom door, passage way at end of new hallwayDetails
ti to add 2 new treatment rooms, curtain walls only. widen bathroom door, passage way at end of new hallway | $40,000 |
| Jul 24, 2014 | Completed final sign-off Feb 2015 | 1045 York St | rear building: relocate kitchen cabinets, counter tops, stairs, insulation, sheetrock etc (relocate kitchen from 2nd floor to 1st floor. new stairs (interior) from 2nd floor to 1st floor. relocate 1st floor (existing bathroom) door from one side to another. no structural changes/repair in kind.Details
rear building: relocate kitchen cabinets, counter tops, stairs, insulation, sheetrock etc (relocate kitchen from 2nd floor to 1st floor. new stairs (interior) from 2nd floor to 1st floor. relocate 1st floor (existing bathroom) door from one side to another. no structural changes/repair in kind. | $25,800 |
| Oct 30, 2013 | Completed final sign-off Aug 2014 | 340 Colon Av | improve ground floor basement to creat 1 bedroom, 1 bath, 1 personal office and 1 family room. change forced air heating system to in floor hydronic heating system. approximate 2.0' excavation of ground floor to create required ceiling height.Details
improve ground floor basement to creat 1 bedroom, 1 bath, 1 personal office and 1 family room. change forced air heating system to in floor hydronic heating system. approximate 2.0' excavation of ground floor to create required ceiling height. | $280,000 |
| Jul 2, 2013 | Completed final sign-off Jul 2015 | 1045 York St | rear building-repair dry rot in upstairs bathroom wall behind sink & staircase belowDetails
rear building-repair dry rot in upstairs bathroom wall behind sink & staircase below | $4,500 |
| Nov 26, 2007 | Completed final sign-off Apr 2008 | 363 Corbett Av | dryrot repair on upper rear (south) & right (west) upper level near flat room. approx 300 sq. ft. repair & remodel lower bathroom. repair in kind. no structural changes.Details
dryrot repair on upper rear (south) & right (west) upper level near flat room. approx 300 sq. ft. repair & remodel lower bathroom. repair in kind. no structural changes. | $6,500 |
| Aug 30, 2006 | Completed final sign-off Dec 2006 | 257 Henry St | repair rear shower stall in rear bathroom-no structural changes-repair in kind.Details
repair rear shower stall in rear bathroom-no structural changes-repair in kind. | $3,000 |
| Aug 10, 2006 | Completed final sign-off Sep 2007 | 308 Diamond St | 1 kithcne & 3 bath room remodel of (e) no structural changes repair in kind.Details
1 kithcne & 3 bath room remodel of (e) no structural changes repair in kind. | $45,000 |
| Sep 9, 2004 | Completed final sign-off Feb 2005 | 75 Swiss Av | bath/hall installation on lower level per plansDetails
bath/hall installation on lower level per plans | $28,000 |
| Jul 21, 2003 | Expired or cancelled expired Apr 2004 | 910 Clayton St | dryrot repair in shower of upper level bathroom. repair in kind, no structuralDetails
dryrot repair in shower of upper level bathroom. repair in kind, no structural | $3,500 |
| Dec 26, 2001 | Completed final sign-off Sep 2002 | 50 Alma St | kitchen remodel and master bath & childrens bath remodel on upper lever. no structural changes/repaiDetails
kitchen remodel and master bath & childrens bath remodel on upper lever. no structural changes/repai | $60,500 |
| Nov 21, 2001 | Expired or cancelled expired Sep 2002 | 50 Alma St | upgrade 2001/08/06/5409.add bath, den & exercise room at rear of basement. turn stairs & redo post&bDetails
upgrade 2001/08/06/5409.add bath, den & exercise room at rear of basement. turn stairs & redo post&b | $7,600 |
| May 9, 2001 | Completed final sign-off Nov 2001 | 2310 Leavenworth St | remodel 1 kitchen &2bath in unit 3 & 1 kitchen &2 baths in unit 4.no structural change/in kind.Details
remodel 1 kitchen &2bath in unit 3 & 1 kitchen &2 baths in unit 4.no structural change/in kind. | $80,000 |
| Nov 8, 2000 | Completed final sign-off Mar 2001 | 218 Bocana St | remodel 2 bathrooms on bedroom level 3rd level no structura; changes repair in kindDetails
remodel 2 bathrooms on bedroom level 3rd level no structura; changes repair in kind | $45,000 |
| Aug 14, 2000 | Expired or cancelled expired Aug 2001 | 2409 Scott St | bathroom and kitchen remodeling, electrical and plumbing fixturesDetails
bathroom and kitchen remodeling, electrical and plumbing fixtures | $28,000 |
| Jul 11, 2000 | Completed final sign-off Sep 2001 | 45 Upland Dr | bathroom remodel on kitchen floor (upper) level, remodel in kindDetails
bathroom remodel on kitchen floor (upper) level, remodel in kind | $9,500 |
| Jun 27, 2000 | Completed final sign-off Feb 2001 | 2194 26th Av | shower stall repair in bathroom on lower level, repair in kind no structural changesDetails
shower stall repair in bathroom on lower level, repair in kind no structural changes | $8,500 |