Block 3276, lot 033
45 Upland Dr
- City’s use
- Single Family Residential
- Built
- 1928
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,568 sq ft
- Lot
- 2,925 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 45 Upland Dr | Metzler Brothers General Contractors Inc | chipout stucco around existing window & replace window. fill in framing, install new marvin ultimate casement window. patch stucco drywall.Details
chipout stucco around existing window & replace window. fill in framing, install new marvin ultimate casement window. patch stucco drywall. | $4,800 |
| Jan 6, 2026 | Completed final sign-off Apr 2026 | 45 Upland Dr | Metzler Brothers General Contractors Inc | bathroom remodel. replace fixtures in same location. convert bathtub to shower. replace floors and shower tilesDetails
bathroom remodel. replace fixtures in same location. convert bathtub to shower. replace floors and shower tiles | $45,000 |
| May 10, 2023 | Never finaled issued May 2023, no final | 45 Upland Dr | Redwood Roofing Co | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Aug 18, 2017 | Never finaled issued Aug 2017, no final | 45 Upland Dr | street spaceDetails
street space | ||
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 45 Upland Dr | A -1 Roof Management & Construction, Inc | reroofDetails
reroof | $7,000 |
| Aug 29, 2006 | Completed final sign-off Oct 2006 | 45 Upland Dr | Dissmeyer Corp, Dba Acme Roofing Co | reroofingDetails
reroofing | $16,168 |
| Jul 25, 2005 | Completed final sign-off Sep 2005 | 45 Upland Dr | Shanta Carpentry & Constr | dry rot repair on east side at kitchen in window area-80 square feet-repair in kind, no structural cDetails
dry rot repair on east side at kitchen in window area-80 square feet-repair in kind, no structural c | $2,800 |
| Jul 18, 2005 | Completed final sign-off Sep 2005 | 45 Upland Dr | Shanta Carpentry & Constr | minor kitchen refurbish to north half of kitchen. sink cabinets & island penninsula cabinet to matcDetails
minor kitchen refurbish to north half of kitchen. sink cabinets & island penninsula cabinet to matc | $8,500 |
| Mar 31, 2003 | Completed final sign-off Jun 2003 | 45 Upland Dr | Shanta Carpentry & Constr | additional cost replated to installing 18 windows, 1 door & additional 800 sq ft of stucco on rearDetails
additional cost replated to installing 18 windows, 1 door & additional 800 sq ft of stucco on rear | $23,000 |
| Jan 28, 2003 | Completed final sign-off Jun 2003 | 45 Upland Dr | Shanta Carpentry & Constr | replacement of 800 sq ft of stucco at rear of bldg.repair in kind. instructural changes.Details
replacement of 800 sq ft of stucco at rear of bldg.repair in kind. instructural changes. | $6,000 |
| Jul 30, 2001 | Completed final sign-off Sep 2001 | 45 Upland Dr | Shanta Carpentry & Constr | additional cost related to permit#12298886. repair in kind no structural changes.Details
additional cost related to permit#12298886. repair in kind no structural changes. | $1,400 |
| Dec 29, 2000 | Completed final sign-off Sep 2001 | 45 Upland Dr | Shanta Carpentry & Constr | re: appl#200008147754 increase cost of dryrot repair at rear & replace rear deck, no struct changeDetails
re: appl#200008147754 increase cost of dryrot repair at rear & replace rear deck, no struct change | $7,800 |
| Sep 19, 2000 | Completed final sign-off Oct 2001 | 45 Upland Dr | Shanta Carpentry & Constr | replace exist pier & post system with new concrete walls & stairs. no structural chg to exterior envDetails
replace exist pier & post system with new concrete walls & stairs. no structural chg to exterior env | $28,000 |
| Aug 14, 2000 | Completed final sign-off Sep 2001 | 45 Upland Dr | Shanta Carpentry & Constr | cap 120 linear feet of foundationb at rear, dry rot repair of additional 500 sq ft at rear repair iDetails
cap 120 linear feet of foundationb at rear, dry rot repair of additional 500 sq ft at rear repair i | $4,500 |
| Jul 31, 2000 | Completed final sign-off Sep 2001 | 45 Upland Dr | Shanta Carpentry & Constr | dry rot reapir, ext.wall, approx. 400 sq ft. repair in kindDetails
dry rot reapir, ext.wall, approx. 400 sq ft. repair in kind | $5,500 |
| Jul 11, 2000 | Completed final sign-off Sep 2001 | 45 Upland Dr | Shanta Carpentry & Constr | bathroom remodel on kitchen floor (upper) level, remodel in kindDetails
bathroom remodel on kitchen floor (upper) level, remodel in kind | $9,500 |
| Mar 15, 2000 | Completed final sign-off Apr 2000 | 45 Upland Dr | legalize (e) rooms @ ground floorDetails
legalize (e) rooms @ ground floor | $2,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.