Back to kitchen remodel contractors
Shane Dalton
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Dec 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 14 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2022 | Completed final sign-off Apr 2022 | 1402 15th St | at middle level unit cosmetic kitchen remodel, new cabinets & countertops, new sink, (e) drop ceiling @ hallway, add lighting and sound, one hour fire rating, retile (1) bathroom & (1/2) bathroom. all lighting high efficacyDetails
at middle level unit cosmetic kitchen remodel, new cabinets & countertops, new sink, (e) drop ceiling @ hallway, add lighting and sound, one hour fire rating, retile (1) bathroom & (1/2) bathroom. all lighting high efficacy | $6,000 |
| May 21, 2012 | Completed final sign-off Nov 2012 | 3088 24th St | tenant improvement to new restaurant - replace existing hood, add kitchen equipment and sink in existing kitchenDetails
tenant improvement to new restaurant - replace existing hood, add kitchen equipment and sink in existing kitchen | $30,000 |