Sgv Group Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2014 to Sep 2026
- Last 24 months
- 6 permits filed
61 permits since 2000: 54 completed, 2 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 in progress, 1 expired or cancelled. Typically 18 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2025 | In progress issued May 2026 | 5530 Mission St | per unit legalization ord# 43-14. legalize one (3 bedroom) unit. remove & install exterior doors & windows. remove (e) kitchen & install new kitchen. fire rated assemblies. egress & eero path improvements. fire sprinkler & alarm upgrades as necessary. one parking space to be removed.Details
per unit legalization ord# 43-14. legalize one (3 bedroom) unit. remove & install exterior doors & windows. remove (e) kitchen & install new kitchen. fire rated assemblies. egress & eero path improvements. fire sprinkler & alarm upgrades as necessary. one parking space to be removed. | $100,000 |
| Apr 30, 2025 | Completed final sign-off Nov 2025 | 456 Diamond St | infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of workDetails
infill (e) lightwell (3rd fl only) new door and windows (rear only) new skylight, extension of rear deck (side only) at 2nd fl. repairs in kind to front stair, remodeled kitchen and bathroom. new powder room, new electrical and plumbing in areas of work | $104,162 |
| Oct 13, 2021 | Completed final sign-off Sep 2022 | 64 Agua Wy | interior remodel of existing single family home. new rear deck & stairs to garden. two new bathrooms and 2 new bedrooms downstairs. kitchen remoel on upper floor.Details
interior remodel of existing single family home. new rear deck & stairs to garden. two new bathrooms and 2 new bedrooms downstairs. kitchen remoel on upper floor. | $250,000 |
| Jan 22, 2016 | Expired or cancelled expired Sep 2021 | 1791 48th Av | remove and replace drywall patches to install electrical light fixtures and repct. repair water damaged floors. replace kitchen cabinets and fixtures (sink, hood, dishwasher, range). repair water damaged drywall.Details
remove and replace drywall patches to install electrical light fixtures and repct. repair water damaged floors. replace kitchen cabinets and fixtures (sink, hood, dishwasher, range). repair water damaged drywall. | $9,000 |