Back to kitchen remodel contractors
Sf Town Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to Sep 2026
- Last 24 months
- 10 permits filed
55 permits since 2000: 41 completed, 6 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 11 completed, 1 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 377 Marina Bl | bath rooms remodel- 1 primary 2 guest (no location change) kitchen cabinet doors upgrade, remove and replace door in kind. install new countertop.Details
bath rooms remodel- 1 primary 2 guest (no location change) kitchen cabinet doors upgrade, remove and replace door in kind. install new countertop. | $110,000 |
| Aug 2, 2023 | Completed final sign-off Aug 2024 | 4221 Cesar Chavez St | #1: scope of work includes the remodel of interior unit #1 at (e) 2nd fl & relocation of mechanical equipment in the (e) garage at first fl. reconfiguration of laundry room and office. remodel of (e) bathroom, replacement of countertops at kitchen. no exterior work.Details
#1: scope of work includes the remodel of interior unit #1 at (e) 2nd fl & relocation of mechanical equipment in the (e) garage at first fl. reconfiguration of laundry room and office. remodel of (e) bathroom, replacement of countertops at kitchen. no exterior work. | $50,000 |
| Dec 30, 2022 | Completed final sign-off May 2024 | 70 Terrace Dr | convert existing free-standing garage to an adu studio unit including adding new bathroom,kitchen,closet,living room & platform. per ordinance 95-17.Details
convert existing free-standing garage to an adu studio unit including adding new bathroom,kitchen,closet,living room & platform. per ordinance 95-17. | $70,000 |
| Nov 5, 2021 | Completed final sign-off Feb 2022 | 2315 Lawton St | add new bathroom with standing shower. relocate kitchen layout, add water boiler and install hydrolic heating floor for 2nd floor front area from garage, add recessed lights in the kitchen.Details
add new bathroom with standing shower. relocate kitchen layout, add water boiler and install hydrolic heating floor for 2nd floor front area from garage, add recessed lights in the kitchen. | $55,000 |
| Aug 16, 2021 | Completed final sign-off Jan 2022 | 1895 Pacific Av | #203: bathroom remodel: demo bathtub, new standing shower. nw floor & wall tile, new toilet & sink install into extg location. new rescessed light- kitchen, lr & bathroom. nw stackabel laundry area. demo kitchen. install new kitchen cabinets and countertop.Details
#203: bathroom remodel: demo bathtub, new standing shower. nw floor & wall tile, new toilet & sink install into extg location. new rescessed light- kitchen, lr & bathroom. nw stackabel laundry area. demo kitchen. install new kitchen cabinets and countertop. | $40,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 1918 Mason St | remodel (e) kitchen cabinets & kitchen floor. install new kitchen cabinets & vinyl floor. add 2 recessed can lights, kitchen hood. all plumbing into the (e) location. remove pantry door & isntall new pocket door, paint.Details
remodel (e) kitchen cabinets & kitchen floor. install new kitchen cabinets & vinyl floor. add 2 recessed can lights, kitchen hood. all plumbing into the (e) location. remove pantry door & isntall new pocket door, paint. | $45,000 |
| Jun 26, 2020 | Expired or cancelled cancelled Jan 2026 | 2196 Hayes St | remove and replace existing kitchen cabinets & island with new in-kind. install new toilet and vanity into existing location in the powder room. install new wet bar in the family room.Details
remove and replace existing kitchen cabinets & island with new in-kind. install new toilet and vanity into existing location in the powder room. install new wet bar in the family room. | $60,000 |
| Mar 9, 2020 | Completed final sign-off Aug 2020 | 3525 Lawton St | convert e storage and laundry w in garage at 1st fl to new master suite to include master bdrm, bath, closet, laundry rm. new doors windows at 1st fl rear facade only. no changes to street facing facade. new kitchen cabinets, appliances, and island. widen e opening between kitchen and living rm.Details
convert e storage and laundry w in garage at 1st fl to new master suite to include master bdrm, bath, closet, laundry rm. new doors windows at 1st fl rear facade only. no changes to street facing facade. new kitchen cabinets, appliances, and island. widen e opening between kitchen and living rm. | $75,000 |
| Oct 25, 2019 | Completed final sign-off Mar 2020 | 1300 26th Av | dwelling unit interior remodel incl demo and new partition walls & kitchen remodel. no structural work. (unit 204)Details
dwelling unit interior remodel incl demo and new partition walls & kitchen remodel. no structural work. (unit 204) | $50,000 |
| Mar 14, 2018 | Completed final sign-off Sep 2019 | 55 Conrad St | convert unconditioned space on 1st flr to living space with a bedroom, bath & laundry. reconfigure stairs, remodel (e) kitchen & bath @ 2nd flr. add roof deck. reconfigure (e) ext. entry.Details
convert unconditioned space on 1st flr to living space with a bedroom, bath & laundry. reconfigure stairs, remodel (e) kitchen & bath @ 2nd flr. add roof deck. reconfigure (e) ext. entry. | $200,000 |
| Oct 12, 2017 | Completed final sign-off Jan 2018 | 2999 California St | replace kitchen cabinets and 1 bath remodelDetails
replace kitchen cabinets and 1 bath remodel | $17,000 |
| Aug 26, 2016 | Completed final sign-off Aug 2017 | 39 Molimo Dr | interior remodel to baths and kitchen. replae e furnace water heater and all exterior windows. replace/add new lights. remove some interior walls. new full bath, bedroom and computer room at gr flDetails
interior remodel to baths and kitchen. replae e furnace water heater and all exterior windows. replace/add new lights. remove some interior walls. new full bath, bedroom and computer room at gr fl | $60,000 |
| Jul 1, 2016 | Completed final sign-off Jul 2016 | 1531 Mission St | revision to app#201506128919. change front approach sink cabinet with knee space to side/parrallel approach in kitchen. n/a for maherDetails
revision to app#201506128919. change front approach sink cabinet with knee space to side/parrallel approach in kitchen. n/a for maher |