Back to kitchen remodel contractors
Sf Contractor
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Mar 2022
- Last 24 months
- 0 permits filed
108 permits since 2000: 71 completed, 20 never finaled, 17 expired or cancelled.
Of the 20 never-finaled permits, 5 are 5 to 10 years old, 15 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
46 kitchen remodel permits: 35 completed, 8 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 1177 California St | unit #1608: install new kitchen cabinets / countertops in (e) layout. elec to include new compliant lighting switches / receptacles to code. repair (e) flooring. new appliances & fixtures. no structural.Details
unit #1608: install new kitchen cabinets / countertops in (e) layout. elec to include new compliant lighting switches / receptacles to code. repair (e) flooring. new appliances & fixtures. no structural. | $33,000 |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 1177 California St | kitchen & bath remodel including cabinets, countertops, tile & trim. update plumbing & electrical to code. install lvp flooring over sound proofing. no structural work. kitchen 8x10. bath 5x9.Details
kitchen & bath remodel including cabinets, countertops, tile & trim. update plumbing & electrical to code. install lvp flooring over sound proofing. no structural work. kitchen 8x10. bath 5x9. | $44,000 |
| Mar 25, 2019 | Completed final sign-off Aug 2019 | 1177 California St | kitchen remodel, new cabinets, countertops, trim, and finishes. new sink, appliances, led lighting fixtures. no change in layout. no structural work.Details
kitchen remodel, new cabinets, countertops, trim, and finishes. new sink, appliances, led lighting fixtures. no change in layout. no structural work. | $22,500 |
| Apr 9, 2018 | Completed final sign-off Aug 2019 | 1177 California St | kitchen/bath remodel including cabinets, counter tops, tile, trim & finishes. update plumbing & electrical to code, no change in layout, no structural work.Details
kitchen/bath remodel including cabinets, counter tops, tile, trim & finishes. update plumbing & electrical to code, no change in layout, no structural work. | $44,000 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 1177 California St | condo remodel to include new tub, 1 tub replaced with shower pan, add washer dryer, 3 bath vanities, reface kitchen cabinets, new countertops, fixtures, trim finishes, no structural workDetails
condo remodel to include new tub, 1 tub replaced with shower pan, add washer dryer, 3 bath vanities, reface kitchen cabinets, new countertops, fixtures, trim finishes, no structural work | $48,500 |
| Oct 19, 2017 | Completed final sign-off Jun 2021 | 1177 California St | unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work.Details
unit 630: remodel to include water isolation valves, bath/kitchen cabinets, countertops, fixtures, appliances, replace but with shower pan, update plubming/electrical, install led lighting, new floor finishes, no structural work. | $43,000 |
| Jun 27, 2017 | Never finaled issued Jun 2017, no final | 1177 California St | kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work.Details
kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work. | $46,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2022 | 1177 California St | kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work.Details
kitchen & bath remodel, cabinets, counter tops, tile, trim, update plumbing & electrical to code. no change in layout, no structural work. | $44,000 |
| Jun 23, 2017 | Expired or cancelled cancelled Jan 2026 | 1177 California St | kitchen and bath remodel, replace bath tub with shower pan. new cabinets, countertops, appliances, trim & tile. new flooring and paint. update plumbing and electrical to code. no structural. no change in layout.Details
kitchen and bath remodel, replace bath tub with shower pan. new cabinets, countertops, appliances, trim & tile. new flooring and paint. update plumbing and electrical to code. no structural. no change in layout. | $50,000 |
| May 8, 2017 | Completed final sign-off Jul 2022 | 1177 California St | remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes.Details
remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes. | $50,000 |
| May 8, 2017 | Never finaled issued May 2017, no final | 1177 California St | remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes.Details
remodel kitchen & bathroom. update plumbing & electrical to code. no structural work. new floor finishes. | $48,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | unit # 501 -condo kitchen remodel: includes isolatjion valves, new cabinets, counter tops, appliances, and fixtures. no structural work, upgrade electrical/ plumbing to code.Details
unit # 501 -condo kitchen remodel: includes isolatjion valves, new cabinets, counter tops, appliances, and fixtures. no structural work, upgrade electrical/ plumbing to code. | $45,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | condo remodel to include bath/kitchen cabinets, countertops, appliances, and fixtures. update plumbing and elctrical to code, install led lighting. install water isolation valves. no structural work.Details
condo remodel to include bath/kitchen cabinets, countertops, appliances, and fixtures. update plumbing and elctrical to code, install led lighting. install water isolation valves. no structural work. | $65,000 |
| Jan 4, 2017 | Completed final sign-off Jun 2017 | 1177 California St | apt 1704: condo remodel - new kitchen, counter tops/sink, replace doors/drawfront on existing cabinets, upgrade lighting, fixtures, trim, add cabinet,upgrade cook top/fridge. no structural work, new engineered floor in main room & bedroom.Details
apt 1704: condo remodel - new kitchen, counter tops/sink, replace doors/drawfront on existing cabinets, upgrade lighting, fixtures, trim, add cabinet,upgrade cook top/fridge. no structural work, new engineered floor in main room & bedroom. | $48,000 |
| Oct 3, 2016 | Completed final sign-off Jun 2017 | 1177 California St | replace kitchen cabinets & bath vanity in same layout. new coutertops, sinks/faucets/tub/shower trim/appliances/fixtures, electric upgrade to code, new led fixtures,gfic & arc fault.no structural work, new engineered floor,new tile in kitchen/bath/dressing room.paint & finishes, water isolation valvDetails
replace kitchen cabinets & bath vanity in same layout. new coutertops, sinks/faucets/tub/shower trim/appliances/fixtures, electric upgrade to code, new led fixtures,gfic & arc fault.no structural work, new engineered floor,new tile in kitchen/bath/dressing room.paint & finishes, water isolation valv | $49,000 |
| Oct 3, 2016 | Never finaled issued Oct 2016, no final | 1470 29th Av | bathroom remodel, new kitchen cabinets in same layout, new water main/furnace/main electric panel, replace shower pan & retile. new countertops, fixtures, appliances, add led lighting in kitchen & bath. update plumbing & electrical in work areas to code, repair & paint, refinish floors.Details
bathroom remodel, new kitchen cabinets in same layout, new water main/furnace/main electric panel, replace shower pan & retile. new countertops, fixtures, appliances, add led lighting in kitchen & bath. update plumbing & electrical in work areas to code, repair & paint, refinish floors. | $58,000 |
| Jul 11, 2016 | Completed final sign-off Oct 2016 | 1177 California St | new kitchen appliances in same layout, new kitchen flrng tile over sound proofing. convert tub bath to shower. new tile shower enclosure and tile floor over sound proofing in bath area. new shower valve. reduce hallway closet fixtures with elfa unit. no structural work. electric to code,Details
new kitchen appliances in same layout, new kitchen flrng tile over sound proofing. convert tub bath to shower. new tile shower enclosure and tile floor over sound proofing in bath area. new shower valve. reduce hallway closet fixtures with elfa unit. no structural work. electric to code, | $12,000 |
| May 26, 2016 | Completed final sign-off Oct 2016 | 1177 California St | install water isolation valves in kitchen & bath areas - replace kitchen & bath cabinets, appliances, countertops, sink, faucets; electrical to code, new compliant lighting; replace tub w/shower enclosure; new bath fixtures, tile; engineered wood flooring over sound pad, install quiet rock on commonDetails
install water isolation valves in kitchen & bath areas - replace kitchen & bath cabinets, appliances, countertops, sink, faucets; electrical to code, new compliant lighting; replace tub w/shower enclosure; new bath fixtures, tile; engineered wood flooring over sound pad, install quiet rock on common | $65,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 1177 California St | unite #423: replace bathtub/waste and bath enclosure tile, new floor tile at toilet area, new vanity sink, new kitchen/bath faucets, shower head. new engineered flooring in remainder of unit, replace some appliances, electrical to code, new led lighting, paint, new closet and doors. no structural.Details
unite #423: replace bathtub/waste and bath enclosure tile, new floor tile at toilet area, new vanity sink, new kitchen/bath faucets, shower head. new engineered flooring in remainder of unit, replace some appliances, electrical to code, new led lighting, paint, new closet and doors. no structural. | $28,000 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 601 Van Ness Av | unit 947 - replace kitchen & bath cabinets; no structural work. comply with cec150.0(k)3 & 5Details
unit 947 - replace kitchen & bath cabinets; no structural work. comply with cec150.0(k)3 & 5 | $42,000 |
| Jun 29, 2015 | Completed final sign-off Feb 2016 | 300 03rd St | unit 822 - replace kitchen & bath cabinets, no structural work. to comply with cec150.0(k)3 & 5Details
unit 822 - replace kitchen & bath cabinets, no structural work. to comply with cec150.0(k)3 & 5 | $26,000 |
| Jun 29, 2015 | Never finaled issued Jun 2015, no final | 1177 California St | unit 823 - replace kitchen & balth cabinets, countertop, fixtures, apploances, and floor finisehs. comply with cec150.0(k)5Details
unit 823 - replace kitchen & balth cabinets, countertop, fixtures, apploances, and floor finisehs. comply with cec150.0(k)5 | $28,000 |
| May 26, 2015 | Completed final sign-off Feb 2017 | 1177 California St | remodel existing 884 sq ft 2 story condo. replace flooring, remodek kitchen, baths, alter approx 30 lin ft of non structural walls, remove existing closet and fireplaceDetails
remodel existing 884 sq ft 2 story condo. replace flooring, remodek kitchen, baths, alter approx 30 lin ft of non structural walls, remove existing closet and fireplace | $61,880 |
| Oct 23, 2014 | Completed final sign-off Jul 2015 | 1177 California St | replace kitchen cabinets, appliances, bath vanity, tub/enclosure, countertops, faucets & fixtures in existing layout. update plumbing and electrical to current code, new light fixture in kitchen/bath. new floor surface in bath, new floating hardwood in remainder.Details
replace kitchen cabinets, appliances, bath vanity, tub/enclosure, countertops, faucets & fixtures in existing layout. update plumbing and electrical to current code, new light fixture in kitchen/bath. new floor surface in bath, new floating hardwood in remainder. | $25,000 |
| Aug 4, 2014 | Completed final sign-off Mar 2015 | 1177 California St | #204- replace kitchen cabinets, appliances, countertops, sink & faucet, update electrical to code, new compliant led lighting 7 fixtures. no structural work - use existing layout for new cabinets. to comply with cec 150.0(k) 3Details
#204- replace kitchen cabinets, appliances, countertops, sink & faucet, update electrical to code, new compliant led lighting 7 fixtures. no structural work - use existing layout for new cabinets. to comply with cec 150.0(k) 3 | $40,000 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 1177 California St | installation of isolation valves on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lightingDetails
installation of isolation valves on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lighting | $25,000 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 1177 California St | installation of isolation valurs on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lightingDetails
installation of isolation valurs on hot & cold supply lines @kitchen &bath demo (e) tub surround.tub replace with new shower pan & wall tile new countertop,shower valve,faucets,fixtures,replace kitchen cabinets,appliances& counterrtops in same layout,update electrical to code new trim new lighting | $25,000 |
| Jan 6, 2014 | Completed final sign-off Aug 2014 | 1177 California St | bathroom & kitchen remodel. no windows.Details
bathroom & kitchen remodel. no windows. | $30,000 |
| Oct 29, 2012 | Completed final sign-off Apr 2013 | 1177 California St | removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen.Details
removal of bathroom door and adjacent closet. expansion of bathroom to include a new bidet. relocation of bathroom pocket foor. relocation of vanity. provide exhaust fan. remodel of existing kitchen. | $25,000 |
| Jul 26, 2012 | Completed final sign-off Mar 2013 | 1177 California St | replace kitchen cabinets, 3 vanities, fixtures, appliances, finishes and countertops in (e) layout, update electrical & plumbing to code & add isolation valves, replace leaking shower enclosure, new tile finishes. no structural work, hardwood over sound pad on lower floor, carpet in balance, paintDetails
replace kitchen cabinets, 3 vanities, fixtures, appliances, finishes and countertops in (e) layout, update electrical & plumbing to code & add isolation valves, replace leaking shower enclosure, new tile finishes. no structural work, hardwood over sound pad on lower floor, carpet in balance, paint | $47,500 |
| Apr 20, 2012 | Completed final sign-off Apr 2013 | 2111 Hyde St | no structural work or changes in existing floor plan, new kitchen cabinets, countertops, appliances, fixtures & finishes. new vanities, counter top, fixtures, tile & finishes in 2 baths, install water supply isolation valves, update electrical to code, new leo lightings in kitchen & bath. repair &Details
no structural work or changes in existing floor plan, new kitchen cabinets, countertops, appliances, fixtures & finishes. new vanities, counter top, fixtures, tile & finishes in 2 baths, install water supply isolation valves, update electrical to code, new leo lightings in kitchen & bath. repair & | $68,500 |
| Jan 18, 2012 | Expired or cancelled expired Mar 2013 | 1080 Chestnut St | demo existing bath tub & surround, install isolation valves, new shower pan at fub location, new shower surround/door,shower valve/trinm,repl vanity faucet, sink, toilet in both master bath and powder rm, new counter tops, and appliances in kitchen using existing layout and cabinets, new flr finisheDetails
demo existing bath tub & surround, install isolation valves, new shower pan at fub location, new shower surround/door,shower valve/trinm,repl vanity faucet, sink, toilet in both master bath and powder rm, new counter tops, and appliances in kitchen using existing layout and cabinets, new flr finishe | $42,000 |
| Jan 18, 2012 | Completed final sign-off Sep 2012 | 1177 California St | replace kitchen cabinets and bath vanity, new counter tops, new faucets and sinks, new backsplash, install new kitchen appliances in existing layout, electrical and plumbing under sep permit to upgrade to current code. no structural work. kitchn/bath tile replDetails
replace kitchen cabinets and bath vanity, new counter tops, new faucets and sinks, new backsplash, install new kitchen appliances in existing layout, electrical and plumbing under sep permit to upgrade to current code. no structural work. kitchn/bath tile repl | $17,500 |
| May 9, 2011 | Never finaled issued May 2011, no final | 1177 California St | demo (e) bath tub and surround, install isolation values and supplies, replace with shower pan, new wall tile, shower door. replace vanity and faucet. new tile @ bath floor. replace kitchen cabinets, countertops, appliances. new faucet, new back splash. replace (e) carpet with engineered woodDetails
demo (e) bath tub and surround, install isolation values and supplies, replace with shower pan, new wall tile, shower door. replace vanity and faucet. new tile @ bath floor. replace kitchen cabinets, countertops, appliances. new faucet, new back splash. replace (e) carpet with engineered wood | $29,500 |
| Apr 11, 2011 | Completed final sign-off May 2011 | 1177 California St | demo of approx 20 lin ft wall, kitchen pass through, cabinets with fix and finishes. install new bath, kitchen sinkDetails
demo of approx 20 lin ft wall, kitchen pass through, cabinets with fix and finishes. install new bath, kitchen sink | $35,000 |
| Feb 18, 2011 | Completed final sign-off Nov 2011 | 218 Monticello St | replace bath vanity, sink, faucet, tub, tub surround, dlooring in existing layout. replace kitchen cabinets, appliances, sink, faucet. plumbing repairs, upgrade to code. laundry sink in basement and shower valve. new floor finishes in kitchn and bath. gen repairs,int paintingDetails
replace bath vanity, sink, faucet, tub, tub surround, dlooring in existing layout. replace kitchen cabinets, appliances, sink, faucet. plumbing repairs, upgrade to code. laundry sink in basement and shower valve. new floor finishes in kitchn and bath. gen repairs,int painting | $30,000 |
| Feb 18, 2011 | Completed final sign-off Oct 2011 | 1 Daniel Burnham Ct | remodel in existing floor plan. replace kitchen cabinets, countertops, appliances, sink, faucet. replace vanity and sinks, faucets, shower valve in dressing and bath areas. new tile in bath, tub, surround floor plus kitchen floor. upgrade elec to code. replace lighting fix, add gfis new finishes,Details
remodel in existing floor plan. replace kitchen cabinets, countertops, appliances, sink, faucet. replace vanity and sinks, faucets, shower valve in dressing and bath areas. new tile in bath, tub, surround floor plus kitchen floor. upgrade elec to code. replace lighting fix, add gfis new finishes, | $48,000 |
| Dec 8, 2010 | Completed final sign-off May 2011 | 1177 California St | replace 2 bath vanities/countertops, install isolation valves, new angle stops on supply line, install 2 new medicine cabinet. in kitchen, install new countertops/sink/faucet/back splash over existing cabinets. install new microhood, update electrical to meet code. prep/paint. provide high efficencyDetails
replace 2 bath vanities/countertops, install isolation valves, new angle stops on supply line, install 2 new medicine cabinet. in kitchen, install new countertops/sink/faucet/back splash over existing cabinets. install new microhood, update electrical to meet code. prep/paint. provide high efficency | $5,000 |
| May 13, 2010 | Completed final sign-off May 2011 | 1177 California St | unit# 914. new vanities,sink,toilets in 2 bathrooms and powder rm. replace master bath tub w/shower pan.replace pocket doors at kitchen w/ open drway. new balanced shower/tub valves. new wall and fl finishes. replace (e) doors in (e) frames. replace kitch. cabs,sink,appliances.no struc.framing workDetails
unit# 914. new vanities,sink,toilets in 2 bathrooms and powder rm. replace master bath tub w/shower pan.replace pocket doors at kitchen w/ open drway. new balanced shower/tub valves. new wall and fl finishes. replace (e) doors in (e) frames. replace kitch. cabs,sink,appliances.no struc.framing work | $80,000 |
| Nov 20, 2009 | Completed final sign-off Feb 2010 | 1755 Filbert St | remove & replace kitchen counterstops, sink, add circuits for replacement, washer/dryer. replace failed (fogged) glass panels in (e) windows in kind. install gfci where required in kitchen.Details
remove & replace kitchen counterstops, sink, add circuits for replacement, washer/dryer. replace failed (fogged) glass panels in (e) windows in kind. install gfci where required in kitchen. | $6,800 |
| Jun 9, 2009 | Completed final sign-off Jul 2010 | 2111 Hyde St | bathromm and kitchen remodeling on 5th fl. includes non structural wall removal. replace 4 exterior windows to match originals, one window in light well, interior lighting and switching, and radiant heat in bath room.Details
bathromm and kitchen remodeling on 5th fl. includes non structural wall removal. replace 4 exterior windows to match originals, one window in light well, interior lighting and switching, and radiant heat in bath room. | $140,000 |
| Apr 22, 2009 | Completed final sign-off Feb 2010 | 1177 California St | minor kitchen remodel-new dishwasher, sink, microhood, cabinets & counter tops. maintain (e) layout. replace refrigerator, add ice maker line. update electric circuitry to meet code requirements, add under cabinet lighting. new floor coverDetails
minor kitchen remodel-new dishwasher, sink, microhood, cabinets & counter tops. maintain (e) layout. replace refrigerator, add ice maker line. update electric circuitry to meet code requirements, add under cabinet lighting. new floor cover | $9,000 |
| Sep 24, 2008 | Completed final sign-off Mar 2009 | 1177 California St | work @ unit# 633 only. new kitchen cabinets / appliances in existing footprint. replace shower overtub with shower. shower pan on separate permit. replace existing sink / lavy in kitchen / bath. no changes to mechanical or fire rated walls. connect to existing waste / supplies.Details
work @ unit# 633 only. new kitchen cabinets / appliances in existing footprint. replace shower overtub with shower. shower pan on separate permit. replace existing sink / lavy in kitchen / bath. no changes to mechanical or fire rated walls. connect to existing waste / supplies. | $17,200 |
| Apr 16, 2008 | Completed final sign-off Apr 2008 | 855 Folsom St | replace kitchen cabinets. utilize existing electric/plumbing. replace dishwasher and add air gap to modular counter unit. no doors, windows and stairs under this permit. no new lighting.Details
replace kitchen cabinets. utilize existing electric/plumbing. replace dishwasher and add air gap to modular counter unit. no doors, windows and stairs under this permit. no new lighting. | $5,500 |
| Dec 23, 2005 | Never finaled issued Dec 2005, no final | 534 Divisadero St | remodel (e) kitchen: replace cabinets, appliances & finishes, inclusive of flooring repair interior doors, trim, plimbing & electrical done under seperate permits.Details
remodel (e) kitchen: replace cabinets, appliances & finishes, inclusive of flooring repair interior doors, trim, plimbing & electrical done under seperate permits. | $3,500 |
| Jun 20, 2001 | Expired or cancelled expired Jun 2002 | 1 Daniel Burnham Ct | demo kitchen wall to provide low wall, install new dropped ceiling. new wood floor thoughout.Details
demo kitchen wall to provide low wall, install new dropped ceiling. new wood floor thoughout. | $40,000 |