Seth Bernstein
- Based in
- San Francisco
- On San Francisco permits
- Sep 2002 to Dec 2023
- Last 24 months
- 0 permits filed
181 permits since 2000: 142 completed, 1 in progress, 28 never finaled, 10 expired or cancelled.
Of the 28 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
29 stairs permits: 26 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 14, 2023 | Completed final sign-off Jul 2024 | 666 Rhode Island St | exploratory work to discover where water is coming from. trace for a leak. left side adj. to stairs. patch up (in kind) after exploratory work.Details
exploratory work to discover where water is coming from. trace for a leak. left side adj. to stairs. patch up (in kind) after exploratory work. | $1,000 |
| Apr 26, 2022 | Completed final sign-off Jun 2024 | 239 Chattanooga St | proposed revision to bpa 2021-0317-6777 (adu) to repair & replace 35' of foundation, beam & posts @ basement level & related dryrot & alter the length of proposed front stairsDetails
proposed revision to bpa 2021-0317-6777 (adu) to repair & replace 35' of foundation, beam & posts @ basement level & related dryrot & alter the length of proposed front stairs | $5,000 |
| Mar 17, 2021 | Completed final sign-off Jun 2024 | 239 Chattanooga St | new adu in existing basement. new rear deck and stairs to replace existing in new configuration. new front basement steps to replace existing. entry hall to adu and rear-yard at basement level. laundry off entry hall. required approvals: variance applicationDetails
new adu in existing basement. new rear deck and stairs to replace existing in new configuration. new front basement steps to replace existing. entry hall to adu and rear-yard at basement level. laundry off entry hall. required approvals: variance application | $250,000 |
| Feb 25, 2021 | Completed final sign-off Oct 2024 | 2105 20th St | replace (e) exterior stair, brought up to current standards. replace lowest flight of stair in-kind per dbi- pre-app meeting. extend (e) stair one level to provide access to private roof deck for unit #1. construct firewall to support reconstructed stair. increase roof deck footprint to 455 gross sfDetails
replace (e) exterior stair, brought up to current standards. replace lowest flight of stair in-kind per dbi- pre-app meeting. extend (e) stair one level to provide access to private roof deck for unit #1. construct firewall to support reconstructed stair. increase roof deck footprint to 455 gross sf | $35,000 |
| Nov 20, 2020 | Completed final sign-off Oct 2024 | 2105 20th St | reconfig unit 1 to contain 3 bed-2.5 baths, laundry, remod kitch, mod interior stair access to unit 1. remove (e) mezz. unit 2-replace (e) spiral stair, enclose laundry for dedicated access. unit 3-add w/d.Details
reconfig unit 1 to contain 3 bed-2.5 baths, laundry, remod kitch, mod interior stair access to unit 1. remove (e) mezz. unit 2-replace (e) spiral stair, enclose laundry for dedicated access. unit 3-add w/d. | $300,000 |
| Nov 17, 2020 | Completed final sign-off May 2022 | 4042 20th St | replace front stairs in kind. remodel kitchen. remodel bathrooms on 2nd & 3rd fl. add bathroom on 3rd fl. remove fireplace. replace windows (not visible from street). increase openiing between living & dining room. relocate laundry. adu at gnd fl under pa 202006128494.Details
replace front stairs in kind. remodel kitchen. remodel bathrooms on 2nd & 3rd fl. add bathroom on 3rd fl. remove fireplace. replace windows (not visible from street). increase openiing between living & dining room. relocate laundry. adu at gnd fl under pa 202006128494. | $50,000 |
| Jun 12, 2020 | Completed final sign-off May 2022 | 4042 20th St | add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters.Details
add adu per ordinance 95-17 at ground level with one bedroom and one bathroom. replace windows at front and back, add entry door. eliminate interior stair. add 6' metal fence and gate at property line 80% open. rebuild existing front stairs. relocate gas and electric meters. | $80,000 |
| May 23, 2018 | Completed final sign-off Feb 2019 | 150 Woodland Av | revision to app#201704174142 (already issued) reduction in scope of work: remove spiral stairs and simplify structural of parking space back retaining wall.Details
revision to app#201704174142 (already issued) reduction in scope of work: remove spiral stairs and simplify structural of parking space back retaining wall. | |
| Oct 3, 2017 | Completed final sign-off Aug 2019 | 55 Potrero Av | comply with nov 201796352 remove one set of interior stair & extend another one.Details
comply with nov 201796352 remove one set of interior stair & extend another one. | $5,000 |
| Apr 17, 2017 | Completed final sign-off Jan 2019 | 150 Woodland Av | convert (e) ground floor storage room & garage into new bedroom, bathroom & den with adj. deck. shorten (e) lower floor deck & insert a new spiral stair access to it. new terrace to support stair. excavate level area for parking 1 car @ (e) drive way.Details
convert (e) ground floor storage room & garage into new bedroom, bathroom & den with adj. deck. shorten (e) lower floor deck & insert a new spiral stair access to it. new terrace to support stair. excavate level area for parking 1 car @ (e) drive way. | $95,000 |
| Feb 19, 2016 | Completed final sign-off Mar 2017 | 561 Spruce St | interior remodel of s.f.d. converting non-habitable space on 1st fl. remodel extg bathroom, bedroom, & family room on 1st fl. enclose extg laundry. add nw gym. remodel 2nd fl. extg kchn, 2 extg bathrooms & e powder room. reconfigure closets into 2 extg bedrooms. replace extg stair with nw stair.Details
interior remodel of s.f.d. converting non-habitable space on 1st fl. remodel extg bathroom, bedroom, & family room on 1st fl. enclose extg laundry. add nw gym. remodel 2nd fl. extg kchn, 2 extg bathrooms & e powder room. reconfigure closets into 2 extg bedrooms. replace extg stair with nw stair. | $376,616 |
| Apr 10, 2015 | Never finaled issued Apr 2015, no final | 147 Cortland Av | repair rear stairs less than 50%. repair in kind. paint house.Details
repair rear stairs less than 50%. repair in kind. paint house. | $5,000 |
| Mar 10, 2014 | Completed final sign-off Mar 2014 | 3929 26th St | replace flexible ducting with 26 gauge rigid in the garage & provide dimensional uniformity at the bottom landing for the rear exterior stairs. to comply with physical inspection report #cc7383Details
replace flexible ducting with 26 gauge rigid in the garage & provide dimensional uniformity at the bottom landing for the rear exterior stairs. to comply with physical inspection report #cc7383 | $1,000 |
| Nov 4, 2013 | Completed final sign-off Feb 2016 | 2266 Cecilia Av | remodel 2nd fl kitchen & bath, reconfigure e stair, add 1/2 bath. remodel 3rd fl master bath, closet and study. new non ouccupied and non combustible roof garden. replace windows in kind with dual glazed insulated windows. windows at front elevation along cecilia ave to be wood frames,others aluminuDetails
remodel 2nd fl kitchen & bath, reconfigure e stair, add 1/2 bath. remodel 3rd fl master bath, closet and study. new non ouccupied and non combustible roof garden. replace windows in kind with dual glazed insulated windows. windows at front elevation along cecilia ave to be wood frames,others aluminu | $40,000 |
| Jun 12, 2013 | Completed final sign-off Jul 2013 | 1575 22nd Av | repair in kind front porch & stairsDetails
repair in kind front porch & stairs | $12,000 |
| Dec 26, 2012 | Expired or cancelled expired Feb 2022 | 1575 22nd Av | internal alterations to (e) residence including (n) internal stair & relocation of (e) partitions. one (e) window to be replaced.Details
internal alterations to (e) residence including (n) internal stair & relocation of (e) partitions. one (e) window to be replaced. | $60,000 |
| May 17, 2012 | Completed final sign-off Jun 2012 | 1725 Hyde St | repair back stairs rot, less than 50%. maintain access to stairs as second required egreess during and after construction.Details
repair back stairs rot, less than 50%. maintain access to stairs as second required egreess during and after construction. | $8,000 |
| Jan 10, 2012 | Completed final sign-off Jul 2012 | 33 Rosemont Pl | comply with nov# 201161528. add wood deck 2'-0" x 6'-6" @ 3rd floor behind (e) stair.Details
comply with nov# 201161528. add wood deck 2'-0" x 6'-6" @ 3rd floor behind (e) stair. | $1,500 |
| Oct 12, 2011 | Completed final sign-off Dec 2011 | 3056 Webster St | repair back deck and stairs in kind, less than 50% repair.Details
repair back deck and stairs in kind, less than 50% repair. | $7,500 |
| Jan 18, 2011 | Completed final sign-off Jan 2011 | 118 Jersey St | repair back stairs in kind. replace 3 posts, 8 treads & 2 handrails less than 50%. no change to wall, windows & doors.Details
repair back stairs in kind. replace 3 posts, 8 treads & 2 handrails less than 50%. no change to wall, windows & doors. | $3,500 |
| Dec 9, 2009 | Completed final sign-off Jan 2010 | 1458 07th Av | repair front stair wall -n kind with wood siding. dry rot repair less than 50%Details
repair front stair wall -n kind with wood siding. dry rot repair less than 50% | $4,500 |
| Nov 17, 2009 | Completed final sign-off Jul 2010 | 274 Precita Av | revision to application 200907172910. relcoate walla to enlarge media room, reconfigure stairs in media room. other details not changed shall follow approved plans of appl. 2004-0424-7033 & 2009-0717-2910.Details
revision to application 200907172910. relcoate walla to enlarge media room, reconfigure stairs in media room. other details not changed shall follow approved plans of appl. 2004-0424-7033 & 2009-0717-2910. | |
| Aug 21, 2009 | Completed final sign-off Sep 2009 | 2166 Pacific Av | repair rot in landing at front stairDetails
repair rot in landing at front stair | $2,500 |
| Jul 17, 2009 | Completed final sign-off Jul 2010 | 274 Precita Av | revision to pa# 2009.04.24.7033. remove (e) exterior stairs to create new closet and add a bathroom. (n) media rm, (n) closet, relocate laundry. relocate interior stairs btn 1st and 2nd floors. new roof deck on 2nd fl.Details
revision to pa# 2009.04.24.7033. remove (e) exterior stairs to create new closet and add a bathroom. (n) media rm, (n) closet, relocate laundry. relocate interior stairs btn 1st and 2nd floors. new roof deck on 2nd fl. | $15,000 |
| May 19, 2009 | Completed final sign-off Jun 2009 | 707 Capp St | repair back deck in kind. less than 50% of stair treads, joists, post & handrails.Details
repair back deck in kind. less than 50% of stair treads, joists, post & handrails. | $7,500 |
| Jul 11, 2006 | Completed final sign-off Feb 2007 | 285 Hermann St | repair & replace interior guardrails, 36 inch high,4 inch sphera max. between rails at main set of stairs (per inspector request).Details
repair & replace interior guardrails, 36 inch high,4 inch sphera max. between rails at main set of stairs (per inspector request). | $3,000 |
| Mar 16, 2004 | Completed final sign-off Apr 2004 | 2676 Pine St | repair rot in back stairs, replace 7 treads & one landing. 15 percent of toal to abate nov 200446577Details
repair rot in back stairs, replace 7 treads & one landing. 15 percent of toal to abate nov 200446577 | $6,000 |
| Jun 20, 2003 | Never finaled issued Jun 2003, no final | 3917 18th St | repair in innd front stairs repair in kind, less than 50%Details
repair in innd front stairs repair in kind, less than 50% | $5,000 |
| Sep 4, 2002 | Completed final sign-off May 2003 | 430 Roosevelt Wy | remove rot in front stairs & garage. replace with same.Details
remove rot in front stairs & garage. replace with same. | $35,000 |