Back to kitchen remodel contractors
Serra Homes
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Jan 2017
- Last 24 months
- 0 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 147 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 4, 2017 | Completed final sign-off May 2017 | 3426 16th St | alterations to 1st floor kitchen, new appliances, fixtures, counters, and cabinets, drop ceiling in kitchen and dining room. remove concrete block wall.Details
alterations to 1st floor kitchen, new appliances, fixtures, counters, and cabinets, drop ceiling in kitchen and dining room. remove concrete block wall. | $25,041 |
| Mar 31, 2016 | Completed final sign-off May 2017 | 3426 16th St | replace (e) framing @ kitchen on first floor & utility room @ 2nd floor. (n) windows, doors, & siding. & local reinforcing walls at rear per plan.Details
replace (e) framing @ kitchen on first floor & utility room @ 2nd floor. (n) windows, doors, & siding. & local reinforcing walls at rear per plan. | $12,000 |