Back to kitchen remodel contractors
Secured Builder
- Based in
- Santa Rosa
- On San Francisco permits
- Jun 2018 to Jun 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 7 days from filing to permit and 45 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2018 | Completed final sign-off Jul 2018 | 376 Utah St | 6000 sq ft interior remodel to e building located at 376 utah in sf scope includes additon of walls to create robotics workshop, open office related to robotic production, conference room, upgrade to rear exit door, mirnor upgrades to staff breakroom kitchenette. restrooms existing and meet accessibDetails
6000 sq ft interior remodel to e building located at 376 utah in sf scope includes additon of walls to create robotics workshop, open office related to robotic production, conference room, upgrade to rear exit door, mirnor upgrades to staff breakroom kitchenette. restrooms existing and meet accessib | $50,000 |