Sebastian White Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2023 to Dec 2024
- Last 24 months
- 1 permit filed
7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 217 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2023 | Completed final sign-off May 2024 | 1067 Kansas St | pour concrete foundation for entry stair finishes; add structural framing for additional support; revision to 2023-0922-7210Details
pour concrete foundation for entry stair finishes; add structural framing for additional support; revision to 2023-0922-7210 | |
| Oct 11, 2023 | Completed final sign-off May 2024 | 1067 Kansas St | revision to permit# 202309227210: repair stair framing - less than 50% (front stairs)Details
revision to permit# 202309227210: repair stair framing - less than 50% (front stairs) | |
| Sep 22, 2023 | Completed final sign-off May 2024 | 1067 Kansas St | rev to pa# 2023-0901-5846. new stair guardrail. stair guardrail to comply with cbc 1015.Details
rev to pa# 2023-0901-5846. new stair guardrail. stair guardrail to comply with cbc 1015. | |
| Sep 1, 2023 | Completed final sign-off May 2024 | 1067 Kansas St | resurface entry stair treads and risers. change from stucco to blue stone surface and add metal handrail. no structural changes. replace in kind.Details
resurface entry stair treads and risers. change from stucco to blue stone surface and add metal handrail. no structural changes. replace in kind. | $12,000 |
| Mar 9, 2023 | Completed final sign-off Sep 2023 | 1067 Kansas St | 1 bathroom remodel: install ditra heat flloring kit new tile and new glass enclosure and shower pan , new fixture and new glass enclosure. 1 kitchen remodel: new floors and cabinets and dndew lights same in kind entry stairs same in kind no change. no alteration of wall, window or door.Details
1 bathroom remodel: install ditra heat flloring kit new tile and new glass enclosure and shower pan , new fixture and new glass enclosure. 1 kitchen remodel: new floors and cabinets and dndew lights same in kind entry stairs same in kind no change. no alteration of wall, window or door. | $17,000 |