Back to kitchen remodel contractors
Sears Home Improvemt Prod,
- Based in
- Sacramento
- On San Francisco permits
- Jan 2000 to Aug 2019
- Last 24 months
- 0 permits filed
2,303 permits since 2000: 1,382 completed, 357 never finaled, 564 expired or cancelled.
Of the 357 never-finaled permits, 23 are 5 to 10 years old, 334 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
312 kitchen remodel permits: 134 completed, 65 never finaled, 113 expired or cancelled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
Showing the 100 most recent of 312.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2018 | Never finaled issued Aug 2018, no final | 510 Lisbon St | kitchen replace and reface cabinets, new counter tops, sink, faucet and disposal. add 8 new outlets. upgrade 9 outlets gfci.Details
kitchen replace and reface cabinets, new counter tops, sink, faucet and disposal. add 8 new outlets. upgrade 9 outlets gfci. | $13,352 |
| Jun 8, 2018 | Completed final sign-off Jul 2018 | 455 Delano Av | kitchen reface cabinets: replace countertops, sink , faucet, upgrade and add new electrical outlets.no structural changes.Details
kitchen reface cabinets: replace countertops, sink , faucet, upgrade and add new electrical outlets.no structural changes. | $6,925 |
| Oct 27, 2017 | Completed final sign-off Jan 2018 | 151 Sears St | replace kitchen sink, faucet, counter tops. upgrade electrical. no structural changes. kitchen remodel.Details
replace kitchen sink, faucet, counter tops. upgrade electrical. no structural changes. kitchen remodel. | $3,250 |
| Jun 13, 2017 | Completed final sign-off May 2018 | 1701 Baker St | kitchen: new counter tops, sink, faucet, upgrade outlets.no structural changes, no cabinet work replace. 145sf. no cabinet work or changes.Details
kitchen: new counter tops, sink, faucet, upgrade outlets.no structural changes, no cabinet work replace. 145sf. no cabinet work or changes. | $7,887 |
| May 2, 2017 | Never finaled issued May 2017, no final | 1177 California St | kitchen: replace sink, cabinets, counter tops , faucet. no structural changes.Details
kitchen: replace sink, cabinets, counter tops , faucet. no structural changes. | $10,003 |
| Apr 28, 2017 | Never finaled issued Apr 2017, no final | 778 Girard St | replace (2) windows in kitchen not visible, no structural changes, max u factor 0.32 vinylDetails
replace (2) windows in kitchen not visible, no structural changes, max u factor 0.32 vinyl | $7,723 |
| Mar 8, 2017 | Completed final sign-off Sep 2017 | 255 Valdez Av | kitchen remodel, no structural layout changes, new counter tops, counter tops, cabinets, sink, faucet, circuits, outlets, waste line, extend gas line, 120 sq. ft.Details
kitchen remodel, no structural layout changes, new counter tops, counter tops, cabinets, sink, faucet, circuits, outlets, waste line, extend gas line, 120 sq. ft. | $24,100 |
| Nov 29, 2016 | Expired or cancelled cancelled Mar 2019 | 1391 Francisco St | kitchen: reface cabinets, new sinks, faucet and electrical upgrades. no structural chnges 100sf.Details
kitchen: reface cabinets, new sinks, faucet and electrical upgrades. no structural chnges 100sf. | $27,066 |
| Sep 13, 2016 | Expired or cancelled cancelled Jul 2017 | 1543 Revere Av | kitchen - replace cabinets, sink, faucets, dishwasher, garbage disposal, replace two outlets. no structural changes 150 sq.ft.Details
kitchen - replace cabinets, sink, faucets, dishwasher, garbage disposal, replace two outlets. no structural changes 150 sq.ft. | $21,616 |
| Jun 23, 2016 | Completed final sign-off Dec 2016 | 111 Chestnut St | kitchen remodel: repalce counter top, sink, faucet, disposal, including outlets,. no structural changes. no cabinet changes.Details
kitchen remodel: repalce counter top, sink, faucet, disposal, including outlets,. no structural changes. no cabinet changes. | $9,774 |
| May 6, 2016 | Completed final sign-off Feb 2017 | 2678 43rd Av | kitchen remodel: new cabinets, countertops, sinks, faucet, g/d, dishwasher, new outlests, ckts, lighting. no structural changes.Details
kitchen remodel: new cabinets, countertops, sinks, faucet, g/d, dishwasher, new outlests, ckts, lighting. no structural changes. | $27,040 |
| Apr 11, 2016 | Completed final sign-off Mar 2017 | 431 Alvarado St | replace 10 windows not vislable from street, hallway, laundry room, kitchen; no structural changes. max u-factor 0.32.Details
replace 10 windows not vislable from street, hallway, laundry room, kitchen; no structural changes. max u-factor 0.32. | $11,427 |
| Dec 10, 2015 | Completed final sign-off May 2017 | 649 16th Av | kitchen: replace cabinets, counter tops, sink faucet, upgrade 1 outlet and add 1 outlet. no structural changes.Details
kitchen: replace cabinets, counter tops, sink faucet, upgrade 1 outlet and add 1 outlet. no structural changes. | $14,276 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 1355 14th Av | kitchen: replace cabinets, counter tops, sink faucet, extend gas line, 8 new outlets, lights, subpanel, and g/d.Details
kitchen: replace cabinets, counter tops, sink faucet, extend gas line, 8 new outlets, lights, subpanel, and g/d. | $21,077 |
| Dec 1, 2015 | Completed final sign-off Apr 2016 | 236 05th Av | kitchen reface cabinets, replace counter tops, sink and faucet.add new outlets, lights and ckts. no structural changes. no walls iwndows and doors to be moved.Details
kitchen reface cabinets, replace counter tops, sink and faucet.add new outlets, lights and ckts. no structural changes. no walls iwndows and doors to be moved. | $20,935 |
| Aug 13, 2015 | Completed final sign-off May 2016 | 4167 Cesar Chavez St | kitchen cabinets, counter tops, sink, facucets (3) outlets, (2) circuits, dishwasher, garbage disposal 120 sq ftDetails
kitchen cabinets, counter tops, sink, facucets (3) outlets, (2) circuits, dishwasher, garbage disposal 120 sq ft | $18,137 |
| Aug 10, 2015 | Completed final sign-off Jul 2016 | 3053 25th St | kitchen new cabinets, countertops, sink, facuet, hood duct, lights, switches, outlets, circuits and waste line for dishwsher/garbage disposal 1100 sq ft. no structural changes, no structural changes, no wall, window or door changesDetails
kitchen new cabinets, countertops, sink, facuet, hood duct, lights, switches, outlets, circuits and waste line for dishwsher/garbage disposal 1100 sq ft. no structural changes, no structural changes, no wall, window or door changes | $29,648 |
| Jul 27, 2015 | Never finaled issued Jul 2015, no final | 1582 Dolores St | kitchen: replace counters, top sink, faucet, add 1 outlet - replace 3 others, replace , no cabinet work, no structural changes.Details
kitchen: replace counters, top sink, faucet, add 1 outlet - replace 3 others, replace , no cabinet work, no structural changes. | $4,405 |
| Jun 9, 2015 | Expired or cancelled expired Feb 2019 | 44 Ashton Av | replace kitchen counter top, sink & faucet, replace hood/fan, 3 new outlets, 2 upgraded outlets, refrigerator water line. no change to walls & layout. no structural work.Details
replace kitchen counter top, sink & faucet, replace hood/fan, 3 new outlets, 2 upgraded outlets, refrigerator water line. no change to walls & layout. no structural work. | $18,977 |
| Dec 22, 2014 | Completed final sign-off Jan 2019 | 17 Chula Ln | kitchen, counter tops, reface cabinets, sink and faucet hook up, no structural changes. n/a ordinance #155-13Details
kitchen, counter tops, reface cabinets, sink and faucet hook up, no structural changes. n/a ordinance #155-13 | $15,791 |
| Dec 22, 2014 | Never finaled issued Dec 2014, no final | 1945 Washington St | reface cabinets and drywall repairs at kitchen, no structural changes. n/a ordinance #155-13Details
reface cabinets and drywall repairs at kitchen, no structural changes. n/a ordinance #155-13 | $19,550 |
| Dec 1, 2014 | Never finaled issued Dec 2014, no final | 1954 33rd Av | replace kitchen counter tops; upgtade electrical, sink & faucet, no structural changesDetails
replace kitchen counter tops; upgtade electrical, sink & faucet, no structural changes | $12,324 |
| Mar 24, 2014 | Never finaled issued Mar 2014, no final | 619 Dartmouth St | kitchen reface cabinets, new counter tops, sink faucet, 2 circuits, #6 upgrade outlets, no structural changes.Details
kitchen reface cabinets, new counter tops, sink faucet, 2 circuits, #6 upgrade outlets, no structural changes. | $12,802 |
| Oct 1, 2013 | Completed final sign-off Jan 2014 | 257 Central Av | replace kitchen cabinets counter tops sink faucet, garbage disposal dishwasher, new outlet up grade 4 others, 1 circuit, 4 lights, no structural changesDetails
replace kitchen cabinets counter tops sink faucet, garbage disposal dishwasher, new outlet up grade 4 others, 1 circuit, 4 lights, no structural changes | $17,680 |
| Sep 18, 2013 | Never finaled issued Sep 2013, no final | 1266 Naples St | kitchen cabinet reface new countertops, sink, faucet, 19 can lights, 6 new outlets, upgrade 6 other outlets, 4 circuits, 200 amp service upgradeDetails
kitchen cabinet reface new countertops, sink, faucet, 19 can lights, 6 new outlets, upgrade 6 other outlets, 4 circuits, 200 amp service upgrade | $41,192 |
| Sep 6, 2013 | Completed final sign-off Jan 2014 | 88 King St | ikitchen - reface cabinets, replace counter tops, sink & faucet, appliances. no structural changes.Details
ikitchen - reface cabinets, replace counter tops, sink & faucet, appliances. no structural changes. | $15,756 |
| Aug 29, 2013 | Completed final sign-off Dec 2013 | 950 Duncan St | kitchen remodel - reface cabinets, replace counter tops, sink & faucet, replace 4 outlets, add 2 outlets drop waste line for garbage disposal, no structural changes , no doors, windows or wall changes, no structural workDetails
kitchen remodel - reface cabinets, replace counter tops, sink & faucet, replace 4 outlets, add 2 outlets drop waste line for garbage disposal, no structural changes , no doors, windows or wall changes, no structural work | $22,020 |
| Aug 26, 2013 | Never finaled issued Aug 2013, no final | 35 Zampa Ln | kitchen remodel - reface cabinets, replace counter tops, sink, faucet, 2 circuits, 2 new outlets, 5 outlet upgrade in kind replacement no structural changesDetails
kitchen remodel - reface cabinets, replace counter tops, sink, faucet, 2 circuits, 2 new outlets, 5 outlet upgrade in kind replacement no structural changes | $12,314 |
| Aug 23, 2013 | Completed final sign-off Dec 2013 | 740 Great Hy | replace counter tops sink and faucet in kitchen, master bath and hallway bath no structural workDetails
replace counter tops sink and faucet in kitchen, master bath and hallway bath no structural work | $2,500 |
| Aug 16, 2013 | Completed final sign-off Oct 2013 | 650 Chestnut St | kitchen remodel in kind no structural changes counter tops sink faucet ; drywall repairDetails
kitchen remodel in kind no structural changes counter tops sink faucet ; drywall repair | $8,133 |
| Aug 15, 2013 | Completed final sign-off Feb 2014 | 3436 Quintara St | kitchen remodel in kind. no structural changes. cabinet reface, counter tops sink, faucet, and 12 outlets, 11 lights, 3 circuits, 125 amp service upgrade.Details
kitchen remodel in kind. no structural changes. cabinet reface, counter tops sink, faucet, and 12 outlets, 11 lights, 3 circuits, 125 amp service upgrade. | $48,588 |
| Aug 12, 2013 | Completed final sign-off Feb 2014 | 532 Dwight St | kitchen remodel in kind, no structural changes, reface cabinets, replace counter tops, sink, faucet, 9 outlet hood.Details
kitchen remodel in kind, no structural changes, reface cabinets, replace counter tops, sink, faucet, 9 outlet hood. | $24,361 |
| Jul 24, 2013 | Completed final sign-off Nov 2013 | 97 Silverview Dr | kitchen remodel in kind, replace cabinets, hood, counter tops, 3 circuits, 9 outlets, sink faucet.Details
kitchen remodel in kind, replace cabinets, hood, counter tops, 3 circuits, 9 outlets, sink faucet. | $17,686 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 863 27th Av | replace 1 window in kitchen, not visible from the street. no structural changes, max u factor is 0.40Details
replace 1 window in kitchen, not visible from the street. no structural changes, max u factor is 0.40 | $918 |
| Jul 8, 2013 | Never finaled issued Jul 2013, no final | 530 Burrows St | revision to 201304083950 add an island counter & top to existing permit kitchen remodel permit. no structural changesDetails
revision to 201304083950 add an island counter & top to existing permit kitchen remodel permit. no structural changes | $1,500 |
| May 31, 2013 | Never finaled issued May 2013, no final | 114 Galewood Cr | kitchen remodel in kind. no structural changes, lighting to comply with cec 150(k)Details
kitchen remodel in kind. no structural changes, lighting to comply with cec 150(k) | $22,004 |
| May 14, 2013 | Never finaled issued May 2013, no final | 631 O'farrell St | kitchen remodel cabinets, counter tops, sink/faucet, 4 outlets, 2 lights, no structural changes, in kind replace.Details
kitchen remodel cabinets, counter tops, sink/faucet, 4 outlets, 2 lights, no structural changes, in kind replace. | $12,000 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 1284 Chestnut St | remodel kitchen in kind, replace cabinets, counter tops, sink & faucet. no lighting change.Details
remodel kitchen in kind, replace cabinets, counter tops, sink & faucet. no lighting change. | $24,800 |
| Apr 8, 2013 | Never finaled issued Apr 2013, no final | 530 Burrows St | remodel kitchen in kind, reface cabinets, replace counter tops, sink & faucet.Details
remodel kitchen in kind, reface cabinets, replace counter tops, sink & faucet. | $3,635 |
| Apr 1, 2013 | Never finaled issued Apr 2013, no final | 201 Harrison St | kitchen remodel - reface cabinets, counter tops, sink & faucet, 5 outlets & hoodDetails
kitchen remodel - reface cabinets, counter tops, sink & faucet, 5 outlets & hood | $4,762 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 66 Apollo St | kitchen remodel in kind, cabinets, counter tops, sink, faucet, outlets & circuits, no structural changes.Details
kitchen remodel in kind, cabinets, counter tops, sink, faucet, outlets & circuits, no structural changes. | $7,108 |
| Mar 18, 2013 | Never finaled issued Mar 2013, no final | 601 Van Ness Av | kitchen remodel in kind, no structural changes, cabinets, counter tops, sink faucet, outlets, range hood. no windows, doors or wall changes.Details
kitchen remodel in kind, no structural changes, cabinets, counter tops, sink faucet, outlets, range hood. no windows, doors or wall changes. | $12,619 |
| Dec 21, 2012 | Completed final sign-off Apr 2013 | 100 Pierce St | kitchen remodel- cabinets, counter tops, no structural changes, no window door or wall changes, sink faucet , can lights.Details
kitchen remodel- cabinets, counter tops, no structural changes, no window door or wall changes, sink faucet , can lights. | $39,000 |
| Oct 10, 2012 | Completed final sign-off Jan 2013 | 201 Montana St | replace 1 window in kitchen max u factor .40 not visible from street no strutural changesDetails
replace 1 window in kitchen max u factor .40 not visible from street no strutural changes | $5,949 |
| Sep 5, 2012 | Completed final sign-off Oct 2012 | 3620 Market St | kitchen cabinets refacing, install new counter top, rep existing outlets, install new faucet.Details
kitchen cabinets refacing, install new counter top, rep existing outlets, install new faucet. | $5,675 |
| Aug 23, 2011 | Completed final sign-off Oct 2011 | 460 Ellington Av | retrofit 4 windows in kitchen in kind, not visible from the street, no structural changes, max u factor .40, no change to walls and doorsDetails
retrofit 4 windows in kitchen in kind, not visible from the street, no structural changes, max u factor .40, no change to walls and doors | $4,239 |
| Jul 25, 2011 | Completed final sign-off Sep 2011 | 475 03rd Av | replace 4 windows in kitchen, not visable from the street, no sturctural changes, max u-factor .40.Details
replace 4 windows in kitchen, not visable from the street, no sturctural changes, max u-factor .40. | $4,314 |
| Nov 18, 2010 | Expired or cancelled cancelled Jan 2026 | 366 Allison St | kitchen remodel: reface cabinets, new sink, new countertop, add 2 gfci, new hood & terminate exhaust 3' min. from pl and opening. kitchen remodel at least 50% high efficacy lighting by wattage.Details
kitchen remodel: reface cabinets, new sink, new countertop, add 2 gfci, new hood & terminate exhaust 3' min. from pl and opening. kitchen remodel at least 50% high efficacy lighting by wattage. | $8,964 |
| Nov 18, 2010 | Expired or cancelled cancelled Jan 2026 | 156 Clara St | kitchen remodel: new cabinets, new countertop, new sink, add 2 gfci. at least 50% high efficacy lighting by wattage.Details
kitchen remodel: new cabinets, new countertop, new sink, add 2 gfci. at least 50% high efficacy lighting by wattage. | $4,887 |
| Aug 9, 2010 | Completed final sign-off Nov 2010 | 1263 Bowdoin St | kitchen remodel in kind. no structural changes. cabinets, counter tops, drywall repair.Details
kitchen remodel in kind. no structural changes. cabinets, counter tops, drywall repair. | $8,700 |
| Aug 3, 2010 | Never finaled issued Aug 2010, no final | 146 Ashton Av | kitchen remodel cabinets, counter tops, no structural changesDetails
kitchen remodel cabinets, counter tops, no structural changes | $13,500 |
| Jun 18, 2010 | Completed final sign-off Mar 2011 | 1 Josiah Av | kitchen remodel in kind, countertop & cabinets, no structural changes, new lighting comply with cec 150(k)Details
kitchen remodel in kind, countertop & cabinets, no structural changes, new lighting comply with cec 150(k) | $10,000 |
| Jun 18, 2010 | Never finaled issued Jun 2010, no final | 543 33rd Av | replace kitchen counter top. no structural changes.Details
replace kitchen counter top. no structural changes. | $6,100 |
| Jun 11, 2010 | Expired or cancelled expired Dec 2013 | 1546 48th Av | replace kitchen counter top sink and faucet, no structural changesDetails
replace kitchen counter top sink and faucet, no structural changes | $5,865 |
| May 28, 2010 | Completed final sign-off Sep 2010 | 1719 Palou Av | kitchen remodel in kind no structural changes, cabinets & conter topsDetails
kitchen remodel in kind no structural changes, cabinets & conter tops | $6,500 |
| May 14, 2010 | Never finaled issued May 2010, no final | 186 Ashton Av | kitchen remodel in kind cabinets, counter tops, no structural changes, no new lightingDetails
kitchen remodel in kind cabinets, counter tops, no structural changes, no new lighting | $13,000 |
| May 14, 2010 | Never finaled issued May 2010, no final | 1211 Broderick St | kitchen remodel in kind, no structural changes, cabinets & counter tops only, no new lightingDetails
kitchen remodel in kind, no structural changes, cabinets & counter tops only, no new lighting | $5,200 |
| Apr 28, 2010 | Expired or cancelled expired Mar 2012 | 101 Crescent Wy | replace kitchen counter top in kind granite, no structural changes also bathroom counter tops unit #2405Details
replace kitchen counter top in kind granite, no structural changes also bathroom counter tops unit #2405 | $4,500 |
| Apr 23, 2010 | Expired or cancelled expired Feb 2022 | 2790 19th Av | repl kitchen counter top no structural changes, unit #11, no new lightingDetails
repl kitchen counter top no structural changes, unit #11, no new lighting | $7,986 |
| Mar 18, 2010 | Never finaled issued Mar 2010, no final | 2655 24th Av | reface kitchen cabinets replace counter tops; no structural changesDetails
reface kitchen cabinets replace counter tops; no structural changes | $6,000 |
| Mar 16, 2010 | Completed final sign-off Aug 2010 | 2425 22nd Av | kitchen remodel in kind no structural changes cabinets and counter top only.Details
kitchen remodel in kind no structural changes cabinets and counter top only. | $12,000 |
| Mar 4, 2010 | Completed final sign-off Mar 2010 | 2425 22nd Av | retrofit (1) window into existing opening in kitchen not visible from the street. no structural changes . u-factor .40 max.Details
retrofit (1) window into existing opening in kitchen not visible from the street. no structural changes . u-factor .40 max. | $1,500 |
| Feb 11, 2010 | Completed final sign-off Jun 2010 | 601 Van Ness Av | unit 949 - replace kitchen counter top only. no structural changes.Details
unit 949 - replace kitchen counter top only. no structural changes. | $2,000 |
| Feb 11, 2010 | Completed final sign-off Jun 2010 | 45 Delmar St | replace counter tops in kitchen only. no structural changes.Details
replace counter tops in kitchen only. no structural changes. | $4,000 |
| Jan 27, 2010 | Completed final sign-off Mar 2010 | 236 Montana St | replace kitchen counter top in kind. no structural changesDetails
replace kitchen counter top in kind. no structural changes | $7,000 |
| Nov 5, 2009 | Never finaled issued Nov 2009, no final | 883 Greenwich St | replace kitchen counter top only, no structural changes, no new lighting & no exhaust.Details
replace kitchen counter top only, no structural changes, no new lighting & no exhaust. | $4,500 |
| Oct 13, 2009 | Expired or cancelled expired Jul 2012 | 631 Andover St | reface kitchen cabinets, replace counter top, no structural changes no other workDetails
reface kitchen cabinets, replace counter top, no structural changes no other work | $6,050 |
| Sep 18, 2009 | Completed final sign-off Feb 2010 | 1660 18th Av | kitchen cabinet re face and counter top replacement, no structural changes, no lightingDetails
kitchen cabinet re face and counter top replacement, no structural changes, no lighting | $7,875 |
| Aug 10, 2009 | Completed final sign-off Oct 2009 | 2059 Bush St | replace kitchen countertop in-kind, no sturctural changes.Details
replace kitchen countertop in-kind, no sturctural changes. | $4,500 |
| Jul 28, 2009 | Completed final sign-off Nov 2009 | 616 Noriega St | replace kitchen cabinets & replace counter tops in kind. no structural work. no plumbing or electrical work. no lighting work involved.Details
replace kitchen cabinets & replace counter tops in kind. no structural work. no plumbing or electrical work. no lighting work involved. | $11,500 |
| Jul 28, 2009 | Completed final sign-off Feb 2010 | 1 Daniel Burnham Ct | work @ unit# 704 only. replace cabinets & replace counter tops. no structural work. plumbing & electrical permit to be pulled by others. 50% of kitchen light watt be in fluorescent.Details
work @ unit# 704 only. replace cabinets & replace counter tops. no structural work. plumbing & electrical permit to be pulled by others. 50% of kitchen light watt be in fluorescent. | $5,920 |
| Jul 23, 2009 | Completed final sign-off Aug 2009 | 616 Noriega St | replace kitchen window. not visable from the street. no structural changes. u factor 0.67 max.Details
replace kitchen window. not visable from the street. no structural changes. u factor 0.67 max. | $2,040 |
| Jul 21, 2009 | Completed final sign-off Nov 2009 | 422 Bayview Cr | kitchen remodel in-kind -cabients & countertops only, min 50% of kitchen light watt be in high efficency lights. no structural changes, plumb & electrical to be done by others.Details
kitchen remodel in-kind -cabients & countertops only, min 50% of kitchen light watt be in high efficency lights. no structural changes, plumb & electrical to be done by others. | $11,500 |
| Jul 9, 2009 | Completed final sign-off Aug 2009 | 106 Wool St | replace kitchen countertop in-kind corian, no structural changes.Details
replace kitchen countertop in-kind corian, no structural changes. | $5,350 |
| Jun 29, 2009 | Completed final sign-off Nov 2009 | 4608 California St | job location: unit 4610 california street only: replace counter top in kitchen, no structural changes. work in unit 4610 onlyDetails
job location: unit 4610 california street only: replace counter top in kitchen, no structural changes. work in unit 4610 only | $4,715 |
| Jun 19, 2009 | Completed final sign-off Aug 2009 | 1125 Key Av | small kitchen remodel in kind cabinets and countertopsDetails
small kitchen remodel in kind cabinets and countertops | $4,100 |
| May 1, 2009 | Completed final sign-off Oct 2009 | 118 Goethe St | replace place kitchen counter top in kind no structural changes.Details
replace place kitchen counter top in kind no structural changes. | $5,750 |
| Apr 28, 2009 | Expired or cancelled expired Apr 2013 | 2462 47th Av | replace kitchen counter top in kind. no structural changes.Details
replace kitchen counter top in kind. no structural changes. | $3,542 |
| Apr 22, 2009 | Expired or cancelled cancelled Mar 2016 | 1270 York St | kitchen remodel. cabinets & counter tops only. no structural changes.Details
kitchen remodel. cabinets & counter tops only. no structural changes. | $9,239 |
| Apr 13, 2009 | Completed final sign-off Oct 2009 | 376 Bayview Cr | replace kitchen cabinets, replace counter top no structural change/ no changes to partical/kitchen sink)Details
replace kitchen cabinets, replace counter top no structural change/ no changes to partical/kitchen sink) | $8,685 |
| Mar 31, 2009 | Completed final sign-off May 2009 | 414 San Miguel St | replace kitchen counter top reinstall existing sink + faucet no structural changes.Details
replace kitchen counter top reinstall existing sink + faucet no structural changes. | $4,000 |
| Mar 26, 2009 | Never finaled issued Mar 2009, no final | 120 Scott St | work to be done in unit#120. replace kitchen counter top reface cabinets. no structural changes in kind. changes plumbing & electrical work to be preformed by others under separate permits.Details
work to be done in unit#120. replace kitchen counter top reface cabinets. no structural changes in kind. changes plumbing & electrical work to be preformed by others under separate permits. | $10,500 |
| Mar 20, 2009 | Completed final sign-off Jul 2009 | 2 Teddy Av | kitchen remodel in kind no structural changes cabinets & countertop.Details
kitchen remodel in kind no structural changes cabinets & countertop. | $17,200 |
| Mar 10, 2009 | Never finaled issued Mar 2009, no final | 930 Pine St | work to be done in unit#110 only. kitchen remodel in kind countertop & cabinets only no structural changes.Details
work to be done in unit#110 only. kitchen remodel in kind countertop & cabinets only no structural changes. | $8,600 |
| Feb 17, 2009 | Never finaled issued Feb 2009, no final | 166 Saturn St | work to be done in unit a: kitchen remodel, in kind,no structural changes. cabinets or counter tops only.Details
work to be done in unit a: kitchen remodel, in kind,no structural changes. cabinets or counter tops only. | $11,000 |
| Feb 2, 2009 | Completed final sign-off Jun 2009 | 1616 16th Av | kitchen remodel in kind no structural changes. counter tops & cabinets only. electrical + plumbing to be done by other.Details
kitchen remodel in kind no structural changes. counter tops & cabinets only. electrical + plumbing to be done by other. | $15,248 |
| Jan 29, 2009 | Completed final sign-off Apr 2009 | 1591 Jackson St | reface cabinets, replace countertops in kitchen. no structural changes.Details
reface cabinets, replace countertops in kitchen. no structural changes. | $9,100 |
| Jan 9, 2009 | Completed final sign-off May 2009 | 1200 Gough St | work @ unit# 13d only. kitchen remodel. replace cabinets & counter tops. in kind. no structural changes. no new lighting.Details
work @ unit# 13d only. kitchen remodel. replace cabinets & counter tops. in kind. no structural changes. no new lighting. | $19,489 |
| Oct 24, 2008 | Expired or cancelled expired Aug 2010 | 760 Delano Av | replace kitchen counter top in kind. no structural work. plumb & elect work to be done by other.Details
replace kitchen counter top in kind. no structural work. plumb & elect work to be done by other. | $3,500 |
| Oct 14, 2008 | Expired or cancelled expired May 2013 | 445 Gates St | replace ocutnertop in kind in kitchen. no structural work.Details
replace ocutnertop in kind in kitchen. no structural work. | $7,500 |
| Oct 8, 2008 | Completed final sign-off Nov 2008 | 118 Hancock St | replace kitchen counter top in kind. no structural changes. no other work by sears.Details
replace kitchen counter top in kind. no structural changes. no other work by sears. | $4,441 |
| Sep 9, 2008 | Never finaled issued Sep 2008, no final | 160 Gardenside Dr | kitchen remodel in kind no structural changes. reface cabinet new counter tops. electrical & plumbing permit to be pulled by others.Details
kitchen remodel in kind no structural changes. reface cabinet new counter tops. electrical & plumbing permit to be pulled by others. | $21,229 |
| Sep 3, 2008 | Completed final sign-off Mar 2009 | 11 Lobos St | kitchen remodel in kind. no structural changes. cabinets & counter tops only. all electrical, plumbing work to be done by others.Details
kitchen remodel in kind. no structural changes. cabinets & counter tops only. all electrical, plumbing work to be done by others. | $22,050 |
| Sep 3, 2008 | Expired or cancelled expired Feb 2012 | 10 Ralston St | kitchen remodel in kind. no structural changes. cabinets & counter tops only. any plumbing work tobe done by others. no electrical work.Details
kitchen remodel in kind. no structural changes. cabinets & counter tops only. any plumbing work tobe done by others. no electrical work. | $19,486 |
| Aug 1, 2008 | Completed final sign-off Oct 2008 | 1333 Visitacion Av | reface cabinets replace counters tops. no structural changes. 50% of wattage of kitchen lighting to be fluorescant.Details
reface cabinets replace counters tops. no structural changes. 50% of wattage of kitchen lighting to be fluorescant. | $10,623 |
| Aug 1, 2008 | Expired or cancelled expired Apr 2013 | 750 Great Hy | reface cabinets replace counter top in kitchen. no structural changes. 50% of wattage of lighting to be fluorescent.Details
reface cabinets replace counter top in kitchen. no structural changes. 50% of wattage of lighting to be fluorescent. | $7,251 |
| Aug 1, 2008 | Completed final sign-off Feb 2009 | 557 Ivy St | work to done unit#559. kitchen remodel in kind no structural changes cabinets counter top & sink & faucet 50% of wattage of lighting to be fluorescent.Details
work to done unit#559. kitchen remodel in kind no structural changes cabinets counter top & sink & faucet 50% of wattage of lighting to be fluorescent. | $15,783 |
| Jul 24, 2008 | Completed final sign-off Aug 2008 | 183 Victoria St | retrofit 2 windows into exsting openings. not visable from the street. no structural changes. u factor .67 max. kitchen windows.Details
retrofit 2 windows into exsting openings. not visable from the street. no structural changes. u factor .67 max. kitchen windows. | $2,216 |
| May 22, 2008 | Completed final sign-off Aug 2008 | 1326 Thomas Av | replace kitchen counter top in kind. no structural changes.Details
replace kitchen counter top in kind. no structural changes. | $4,471 |
| Apr 28, 2008 | Never finaled issued Apr 2008, no final | 510 Argonaut Av | replace kitchen cabinets. replace counter tops in kind. no structural changes.Details
replace kitchen cabinets. replace counter tops in kind. no structural changes. | $8,000 |