Back to kitchen remodel contractors
Sean Rattigan Construction
- Based in
- Benicia
- On San Francisco permits
- Jan 2009 to Jan 2026
- Last 24 months
- 2 permits filed
37 permits since 2000: 29 completed, 6 never finaled, 2 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 4 days from filing to permit and 336 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2023 | Completed final sign-off Aug 2025 | 526 Columbus Av | commercial tenant improvement full resturant build out new kitchen prep and dish areas dining and service counter revise (e) hvac, no exterior changesDetails
commercial tenant improvement full resturant build out new kitchen prep and dish areas dining and service counter revise (e) hvac, no exterior changes | $200,000 |
| Apr 1, 2019 | Completed final sign-off Sep 2026 | 1615 Mason St | foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living roomDetails
foundation work including retaining wall replacement at garage level and framing required to widen garage door. existing garage door to be widened from 8'-0" to 10'-0", foundation work includes new drilled piers, remodel (e) 3rd fl. unit 1615, including kitchen, bathrooms & living room | $350,000 |
| Aug 29, 2014 | Never finaled issued Apr 2016, no final | 492 Filbert St | remodel bedroom, add new bathroom, remodel kitchen & new roof deck.Details
remodel bedroom, add new bathroom, remodel kitchen & new roof deck. | $60,000 |
| Jan 13, 2012 | Completed final sign-off Dec 2012 | 4086 25th St | removal of interior wall at 1st floor. add new plywood stiffening to the (e) wall between kitchen & closetDetails
removal of interior wall at 1st floor. add new plywood stiffening to the (e) wall between kitchen & closet | $5,000 |
| Jan 28, 2011 | Completed final sign-off Mar 2011 | 1451 Montgomery St | unit#2: remove walls in kitchen area(noted on plans) add (n) beam & hangers. cut down wall between den & living to 42". move electrical switch from removed wall to (e) wall. replace sheetrock in-kind & paint (n) sheet rock.Details
unit#2: remove walls in kitchen area(noted on plans) add (n) beam & hangers. cut down wall between den & living to 42". move electrical switch from removed wall to (e) wall. replace sheetrock in-kind & paint (n) sheet rock. | $13,000 |
| Apr 21, 2009 | Completed final sign-off Dec 2009 | 1451 Montgomery St | revision to 200901150249. reframe ceiling/floor framing at 3rd floor over kitchen and living room.Details
revision to 200901150249. reframe ceiling/floor framing at 3rd floor over kitchen and living room. | $2,000 |
| Jan 15, 2009 | Completed final sign-off Dec 2009 | 1451 Montgomery St | interior renovation to an existing condominium type 5-1 hour rated construction. work includes,but is not limited to kitchen, master bathroom & bathroom # 2 remodel. new ceiling & floor finishes & new lighting.Details
interior renovation to an existing condominium type 5-1 hour rated construction. work includes,but is not limited to kitchen, master bathroom & bathroom # 2 remodel. new ceiling & floor finishes & new lighting. | $75,000 |