Back to bathroom remodel contractors
Sean Kelly Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2003 to Feb 2026
- Last 24 months
- 3 permits filed
98 permits since 2000: 78 completed, 3 in progress, 9 never finaled, 8 expired or cancelled.
Of the 9 never-finaled permits, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off Jul 2026 | 250 Mullen Av | interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac.Details
interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac. | $10,000 |
| Feb 28, 2019 | Completed final sign-off Mar 2021 | 252 Richland Av | interior renovation: upper two floors: (n) bathrooms, (n) kitchen. basement: conversion of basement to (n) habitable space. (n) mechanical room. excavation of 42.5 c/y.Details
interior renovation: upper two floors: (n) bathrooms, (n) kitchen. basement: conversion of basement to (n) habitable space. (n) mechanical room. excavation of 42.5 c/y. | $225,000 |
| Jun 24, 2016 | Completed final sign-off Mar 2018 | 431 Prentiss St | ground floor conversion of 578 sq. (e)garage storage to (n)living,bathroom and bedroom. renovation of (e) kitchen living room.Details
ground floor conversion of 578 sq. (e)garage storage to (n)living,bathroom and bedroom. renovation of (e) kitchen living room. | $70,000 |
| Nov 3, 2015 | Completed final sign-off Feb 2016 | 176 Corona St | install new 20amp electrical circuit to new on demand water heater, new tile on existing bathroom shower and floor. re-install existing vanity and toilet. cut down fence to 6' from above grade per correction notice. fence, north and east, approx. 30', not visible from street.Details
install new 20amp electrical circuit to new on demand water heater, new tile on existing bathroom shower and floor. re-install existing vanity and toilet. cut down fence to 6' from above grade per correction notice. fence, north and east, approx. 30', not visible from street. | $8,000 |
| Jan 2, 2013 | Completed final sign-off Apr 2014 | 2035 Greenwich St | remodel extg master bathroom and 2nd bathroom. change entrance to unit 2035 and build closet in entry and master bedroom.Details
remodel extg master bathroom and 2nd bathroom. change entrance to unit 2035 and build closet in entry and master bedroom. | $42,200 |
| May 20, 2011 | Completed final sign-off Aug 2012 | 2619 Laguna St | partial foundation replacement at ground level,lower floor to new 9'-6" ceiling height. remodel family room, new guest room, bath and powder room.excavate for storage/utility room at rear. add one bar sink.Details
partial foundation replacement at ground level,lower floor to new 9'-6" ceiling height. remodel family room, new guest room, bath and powder room.excavate for storage/utility room at rear. add one bar sink. | $265,000 |
| Dec 16, 2010 | Completed final sign-off May 2011 | 1674 34th Av | repair fire damaged building, patch roof, new bathroom, new kitchen, remove drywall from all living area on main level. install insulation, electrical, drywall & restore to original condition. no plans required as per correction notice issued on 10/18/2010.Details
repair fire damaged building, patch roof, new bathroom, new kitchen, remove drywall from all living area on main level. install insulation, electrical, drywall & restore to original condition. no plans required as per correction notice issued on 10/18/2010. | $110,000 |
| Nov 9, 2010 | Completed final sign-off Sep 2011 | 209 Dellbrook Av | interior renovation at main level, add family, exercise room, and new full bathroom at ground level, replace all (e) windows.Details
interior renovation at main level, add family, exercise room, and new full bathroom at ground level, replace all (e) windows. | $100,000 |
| Aug 11, 2008 | Completed final sign-off Dec 2008 | 1 Capp St | revision to 200807096300: 1st fl no wall removal for corridor, no new partition wall, remove 2-20 min doors. 2nd fl unit 1: wall to remain at kitchen, no kitchen/bath remodel. unit 7: wall to be removed at kitchen area,remodel kitchen,no bath.3rd fl unit 3: kitchen wall to remain, no kitchen/bathDetails
revision to 200807096300: 1st fl no wall removal for corridor, no new partition wall, remove 2-20 min doors. 2nd fl unit 1: wall to remain at kitchen, no kitchen/bath remodel. unit 7: wall to be removed at kitchen area,remodel kitchen,no bath.3rd fl unit 3: kitchen wall to remain, no kitchen/bath | |
| Mar 12, 2008 | Completed final sign-off Apr 2009 | 569 Capp St | partial remodel to 3 level single family residence. ground floor- remodel of (e) in law suite. relocate (e) bathroom, redo access to rear yard. 2nd level-remodel (e) kitchen provide new access to new roof deck above in law unit. new electrical, plumbing, high efficacy lighting where required.Details
partial remodel to 3 level single family residence. ground floor- remodel of (e) in law suite. relocate (e) bathroom, redo access to rear yard. 2nd level-remodel (e) kitchen provide new access to new roof deck above in law unit. new electrical, plumbing, high efficacy lighting where required. | $115,000 |
| Apr 25, 2007 | Expired or cancelled expired Feb 2009 | 26 Pleasant St | unit 26- kitchen & bathroom remodel. sinks, toilets, bathtub, shower, sheetrock, tile,stone. install refrigerator,sink,garbage disposal,cabinetry,tile & stone, slate floor,wood floating floors. unit#28- same, repalce windows, relcoate water heater. please see existing permit sets approved.Details
unit 26- kitchen & bathroom remodel. sinks, toilets, bathtub, shower, sheetrock, tile,stone. install refrigerator,sink,garbage disposal,cabinetry,tile & stone, slate floor,wood floating floors. unit#28- same, repalce windows, relcoate water heater. please see existing permit sets approved. | $175,000 |
| Feb 13, 2007 | Completed final sign-off Apr 2007 | 850 Powell St | reduce scope of work of application #2006/03/08/6265 from two bathrooms to one.Details
reduce scope of work of application #2006/03/08/6265 from two bathrooms to one. | |
| Oct 11, 2006 | Expired or cancelled expired Jun 2007 | 2730 Vallejo St | replace (e) 1 bathroom fixtures with new. new tile & new lights @ garage rear rooms.Details
replace (e) 1 bathroom fixtures with new. new tile & new lights @ garage rear rooms. | $10,000 |
| Apr 12, 2006 | Completed final sign-off Sep 2006 | 1552 Polk St | install furringstrips & install drywall to cover exposed brick wall 40'x11'. install new lights plugs & switches in retail area. install new mop sink outside existing bathroom. all proposed work in g/f retail area. no exterior work.Details
install furringstrips & install drywall to cover exposed brick wall 40'x11'. install new lights plugs & switches in retail area. install new mop sink outside existing bathroom. all proposed work in g/f retail area. no exterior work. | $10,500 |
| Mar 8, 2006 | Completed final sign-off Apr 2007 | 850 Powell St | remodel two bathrooms & replace (e) fixtures, vannities, tile & mirrors lite fixtures with new. toilets sinks & tubs to remain in (e) locations. interior work onlyDetails
remodel two bathrooms & replace (e) fixtures, vannities, tile & mirrors lite fixtures with new. toilets sinks & tubs to remain in (e) locations. interior work only | $30,000 |
| Mar 25, 2005 | Completed final sign-off Jun 2005 | 150 El Camino Del Mar | remodel existing bathroom, upgrade fixtures, install new tileDetails
remodel existing bathroom, upgrade fixtures, install new tile | $5,150 |
| Mar 25, 2005 | Completed final sign-off Sep 2005 | 623 Broderick St | upgrade existing 3 kitchens, 3 baths, replace ex cabints, cntrtps, plumbing fixtures, appliances.Details
upgrade existing 3 kitchens, 3 baths, replace ex cabints, cntrtps, plumbing fixtures, appliances. | $35,000 |
| Oct 5, 2004 | Expired or cancelled expired Dec 2005 | 1652 Fell St | replace interior stair, relonfigure 1 bathroom. revision to appl# 2003/06/30/8340Details
replace interior stair, relonfigure 1 bathroom. revision to appl# 2003/06/30/8340 | $40,000 |
| Jun 20, 2003 | Completed final sign-off Jan 2004 | 850 Powell St | replace existing bathroom tile, toiler, sink + shower rm in bathroom (1) no structural work. raplaceDetails
replace existing bathroom tile, toiler, sink + shower rm in bathroom (1) no structural work. raplace | $15,000 |