Block 3553, lot 048
1 Capp St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 1 Capp St | Blue Heron Builder | comply w/ physical inspection report #cc8272Details
comply w/ physical inspection report #cc8272 | $20,000 |
| Jan 25, 2019 | Completed final sign-off Jul 2019 | 1 Capp St | to obtain final inspection for work approved under pa# 201408042939. all work is complete.Details
to obtain final inspection for work approved under pa# 201408042939. all work is complete. | ||
| Oct 29, 2018 | Completed final sign-off Sep 2019 | 1 Capp St | Blue Heron Builder | to obtain final inspection for work approved under pa# 200807096300 all work is complete. [provide properly install carbon monoxide detectors. identify each elec service panel board as appliacble. washing machine requieres an approved waste].Details
to obtain final inspection for work approved under pa# 200807096300 all work is complete. [provide properly install carbon monoxide detectors. identify each elec service panel board as appliacble. washing machine requieres an approved waste]. | |
| May 3, 2016 | Completed final sign-off Jun 2016 | 1 Capp St | Blue Heron Builder | back stairs replace in kind.Details
back stairs replace in kind. | $20,000 |
| Mar 16, 2016 | Expired or cancelled cancelled Jun 2016 | 1 Capp St | Blue Heron Builder | repair back stair in -kind less than 50%.Details
repair back stair in -kind less than 50%. | $20,000 |
| Aug 4, 2014 | Never finaled issued Aug 2014, no final | 1 Capp St | Armstrong Installation Service | remove and replace 12 windows. all street-facing windows will be replaced with fiberglass. no change to rough openings.Details
remove and replace 12 windows. all street-facing windows will be replaced with fiberglass. no change to rough openings. | $22,000 |
| Jul 16, 2014 | Completed final sign-off Oct 2014 | 1 Capp St | Eco Smart Builder | replace kitchen cabinets, replace kitchen & bathroom flooring, replace ceiling with 1 hr rated eyp. bd., refinish wood flooring, paint interior, new partition (non bearing) in garage for storage room.Details
replace kitchen cabinets, replace kitchen & bathroom flooring, replace ceiling with 1 hr rated eyp. bd., refinish wood flooring, paint interior, new partition (non bearing) in garage for storage room. | $80,000 |
| Mar 13, 2009 | Completed final sign-off Apr 2009 | 1 Capp St | Qse Construction | provide perimeter concrete foundation, cap w/ interior footing cap & complete anchor bolting and 1/2" plywood sheathing to walls of ground fl garage, all existing concrete deterioration ftg. top is replaced.Details
provide perimeter concrete foundation, cap w/ interior footing cap & complete anchor bolting and 1/2" plywood sheathing to walls of ground fl garage, all existing concrete deterioration ftg. top is replaced. | $31,855 |
| Jan 20, 2009 | Completed final sign-off Feb 2009 | 1 Capp St | J G Construction Partnership | replace 3 rotten posts in courtyard with 7' section of 1 hour wall. (for existing wall) approx 7' post.Details
replace 3 rotten posts in courtyard with 7' section of 1 hour wall. (for existing wall) approx 7' post. | $3,000 |
| Dec 11, 2008 | Completed final sign-off Feb 2009 | 1 Capp St | J G Construction Partnership | substructure area: remove damaged wood members and replace with new material, chemically treat the entire structure for control of subterranean termite infestation, remove damaged portions of foundation mudsills & replace with new pressure treated material, remove damaged wood siding (10 ft) &Details
substructure area: remove damaged wood members and replace with new material, chemically treat the entire structure for control of subterranean termite infestation, remove damaged portions of foundation mudsills & replace with new pressure treated material, remove damaged wood siding (10 ft) & | $5,000 |
| Aug 11, 2008 | Completed final sign-off Dec 2008 | 1 Capp St | Sean Kelly Construction | revision to 200807096300: 1st fl no wall removal for corridor, no new partition wall, remove 2-20 min doors. 2nd fl unit 1: wall to remain at kitchen, no kitchen/bath remodel. unit 7: wall to be removed at kitchen area,remodel kitchen,no bath.3rd fl unit 3: kitchen wall to remain, no kitchen/bathDetails
revision to 200807096300: 1st fl no wall removal for corridor, no new partition wall, remove 2-20 min doors. 2nd fl unit 1: wall to remain at kitchen, no kitchen/bath remodel. unit 7: wall to be removed at kitchen area,remodel kitchen,no bath.3rd fl unit 3: kitchen wall to remain, no kitchen/bath | |
| Jul 14, 2008 | Expired or cancelled withdrawn Jul 2008 | 1 Capp St | 28 front windows, 8 rear windows, 12 right side window, 12 left side bldg. replace (e) wood windows w/ new wood windows match in kind.Details
28 front windows, 8 rear windows, 12 right side window, 12 left side bldg. replace (e) wood windows w/ new wood windows match in kind. | $4,500 | |
| Jul 9, 2008 | Expired or cancelled expired Sep 2019 | 1 Capp St | 1st fl, remove wall for corridor, add new partition, add two 20-min rated doors, 2nd fl, unit 1 & 7, remove wall @ kitchen, remodel kitchen & bath, 3rd fl, unit 3 & 5, add two new bath and add two flat skylights.Details
1st fl, remove wall for corridor, add new partition, add two 20-min rated doors, 2nd fl, unit 1 & 7, remove wall @ kitchen, remodel kitchen & bath, 3rd fl, unit 3 & 5, add two new bath and add two flat skylights. | $80,000 | |
| Nov 25, 2003 | Expired or cancelled expired Oct 2005 | 1 Capp St | Crown General Roofing | reroofingDetails
reroofing | $8,300 |
| Aug 25, 2003 | Completed final sign-off Dec 2003 | 1 Capp St | repair to comply w/n.o.v200342488. less than 50% patch holes in garage ceilingsDetails
repair to comply w/n.o.v200342488. less than 50% patch holes in garage ceilings | $1,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blue Heron Builder (4), J G Construction Partnership (2), Armstrong Installation Service, Crown General Roofing, Eco Smart Builder, Qse Construction, Sean Kelly Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.