7 permits since 2000: 6 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2021 | Expired or cancelled withdrawn Apr 2021 | 222 Mason St | revision to pa 202007069618. updating structural attachments for slope ladder and cat walk assemblies at upper story and pool roof. not visible from the street.Details
revision to pa 202007069618. updating structural attachments for slope ladder and cat walk assemblies at upper story and pool roof. not visible from the street. | |
| Feb 10, 2021 | Completed final sign-off Aug 2021 | 222 Mason St | revision to pa 202007069618. roof hatches were replaced with sloped ladders. vertical ladders were replaced with sloped ladders. work not visible from street.Details
revision to pa 202007069618. roof hatches were replaced with sloped ladders. vertical ladders were replaced with sloped ladders. work not visible from street. | |
| Nov 25, 2020 | Completed final sign-off Aug 2021 | 222 Mason St | revision to pa #2020-0919-4505 & 2020-0302-5832: replace 9 concrete landings w/ 9 prefabricated landings. replace double plate guardrails with single plate guardrails at 25 & 27 floors. update details for plate detachment and stepped ladder attachments at roof.Details
revision to pa #2020-0919-4505 & 2020-0302-5832: replace 9 concrete landings w/ 9 prefabricated landings. replace double plate guardrails with single plate guardrails at 25 & 27 floors. update details for plate detachment and stepped ladder attachments at roof. | |
| Nov 17, 2020 | Completed final sign-off Aug 2021 | 222 Mason St | revision to pa# 202009194505. reinforcing structural steel framing for exterior facade access. incorporating pre-fab steps to stepped ladders at high level roofs in lieu of concrete steps. minor guardrail changes at p1 level.Details
revision to pa# 202009194505. reinforcing structural steel framing for exterior facade access. incorporating pre-fab steps to stepped ladders at high level roofs in lieu of concrete steps. minor guardrail changes at p1 level. | |
| Sep 19, 2020 | Completed final sign-off Aug 2021 | 222 Mason St | revision to pa 202003025832. reinforcing existing structural steel framing for installation of exterior building facade access.Details
revision to pa 202003025832. reinforcing existing structural steel framing for installation of exterior building facade access. | |
| Sep 3, 2020 | Completed final sign-off Aug 2021 | 222 Mason St | reinforce (e) structural steel framing at locations for installation of exterior bldg facade access improvements associated w/ 5th, 20th, 21st-26th floors, including penthouse & roof levels. install exterior bldg facade access improvements. repair/replace finishes adjacent. ref pa #202003025832.Details
reinforce (e) structural steel framing at locations for installation of exterior bldg facade access improvements associated w/ 5th, 20th, 21st-26th floors, including penthouse & roof levels. install exterior bldg facade access improvements. repair/replace finishes adjacent. ref pa #202003025832. | $327,580 |
| Jul 6, 2020 | Completed final sign-off Aug 2021 | 222 Mason St | hotel nikko is a 26-story hotel that includes scope of work: a new exterior building maintenance system and equipment to meet current osha regulations. maher naDetails
hotel nikko is a 26-story hotel that includes scope of work: a new exterior building maintenance system and equipment to meet current osha regulations. maher na | $85,000 |