Back to kitchen remodel contractors
Sarris Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jul 2026
- Last 24 months
- 6 permits filed
182 permits since 2000: 147 completed, 1 in progress, 25 never finaled, 9 expired or cancelled.
Of the 25 never-finaled permits, 7 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 229 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | Completed final sign-off Jun 2026 | 1570 12th Av | all work is interior - revision to pa 202506209070 structural modifications based on (e) conditions; reconstruct stair to basement; replace windows, doors and skylights in (e) openings @ rear in-kind; remove (e) brick flue and install (n) cabinetry @ dining room & kitchenDetails
all work is interior - revision to pa 202506209070 structural modifications based on (e) conditions; reconstruct stair to basement; replace windows, doors and skylights in (e) openings @ rear in-kind; remove (e) brick flue and install (n) cabinetry @ dining room & kitchen | $40,000 |
| Sep 26, 2023 | Completed final sign-off Nov 2025 | 250 Detroit St | remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closetDetails
remove (e) wall between kitchen & bedrm; convert (e) bedrm to kitchen; convert (e) kitchen dining rm; convert (e) dining room bedrm/office; convert (e) family rm to primary bedrm; add (n) primary bathrm; convert portion of laundry rm to closet | $200,000 |
| Aug 30, 2018 | Completed final sign-off Dec 2018 | 3235 Webster St | kitchen remodel: replace cabinets, appliances, flooring and one skylight. led lightfixtures. insulate exterior kitchen wall and ceiling. 110sf.Details
kitchen remodel: replace cabinets, appliances, flooring and one skylight. led lightfixtures. insulate exterior kitchen wall and ceiling. 110sf. | $30,000 |
| Dec 15, 2014 | Completed final sign-off Dec 2015 | 319 Frederick St | at second level, remodel (e) kitchen & (e) bath and add (n) master bath & closet. replace two (e) windows at lightwell. at (e) garage, relocate water heater & furnance & replace (1) (e) furnace.Details
at second level, remodel (e) kitchen & (e) bath and add (n) master bath & closet. replace two (e) windows at lightwell. at (e) garage, relocate water heater & furnance & replace (1) (e) furnace. | $53,000 |
| Mar 2, 2011 | Completed final sign-off Aug 2012 | 371 Diamond St | add new conc floor slab and footing to (e0 kitychen. upgrade (e) electrical and plbg. add sky light. kitchen and bathroom remodelDetails
add new conc floor slab and footing to (e0 kitychen. upgrade (e) electrical and plbg. add sky light. kitchen and bathroom remodel | $12,000 |
| Oct 6, 2010 | Completed final sign-off Jan 2011 | 418 44th Av | remodel kitchen & bath including cabients, countertops, fixtures, tile floors, elect & plumbing fixtures.Details
remodel kitchen & bath including cabients, countertops, fixtures, tile floors, elect & plumbing fixtures. | $33,000 |
| Apr 28, 2008 | Completed final sign-off Jun 2008 | 2957 Pacific Av | add cabinets to kitchen approx 12' living room 3 seperate cabinets.Details
add cabinets to kitchen approx 12' living room 3 seperate cabinets. | $20,000 |
| Sep 22, 2000 | Completed final sign-off May 2001 | 2210 Broderick St | repair stairs minor alt to 1/f guest bath multiple alt remove (e) wall @ (e) kitchenDetails
repair stairs minor alt to 1/f guest bath multiple alt remove (e) wall @ (e) kitchen | $100,000 |
| Aug 8, 2000 | Completed final sign-off Apr 2001 | 1446 Church St | remodel kitchenDetails
remodel kitchen | $10,000 |