Santilli & Forster Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2000 to Oct 2010
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 expired or cancelled. Typically 25 days from filing to permit and 319 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2010 | Expired or cancelled expired Jul 2013 | 985 Sanchez St | replace extg exterior wood stair as required by notice of violation. install new handrail at front entry as required by nov. to comply w/ his nov@201056834 dated 7-13-2010, items 2&3.Details
replace extg exterior wood stair as required by notice of violation. install new handrail at front entry as required by nov. to comply w/ his nov@201056834 dated 7-13-2010, items 2&3. | $25,000 |
| Jul 2, 2009 | Completed final sign-off May 2010 | 3770 21st St | revision to appl #200905138322 - front stair & porch repair, w/structural detail. new siding & replace aluminum porch windows & replace wooden gate with wooden door on front of house.Details
revision to appl #200905138322 - front stair & porch repair, w/structural detail. new siding & replace aluminum porch windows & replace wooden gate with wooden door on front of house. | $15,000 |