Sandquist Construction
- Based in
- Vallejo
- On San Francisco permits
- May 2008 to Mar 2018
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 220 days from filing to permit and 328 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2009 | Completed final sign-off Jul 2010 | 38 20th Av | revision to pa# 2008.05.27.2932. eliminate entry foundation and stairs, stairs from garage to main fl, skylights in bed 1 and 2, deck over family reoom; new stairs and landing at rear, change doors to windows at rear. all works shown on delta 2 on plans,Details
revision to pa# 2008.05.27.2932. eliminate entry foundation and stairs, stairs from garage to main fl, skylights in bed 1 and 2, deck over family reoom; new stairs and landing at rear, change doors to windows at rear. all works shown on delta 2 on plans, | |
| May 27, 2008 | Completed final sign-off Jul 2010 | 38 20th Av | 3 story horizontal addition at the rear of (e) bldg. minor additions at 2nd & 3rd floor. interior remodel. add entry & stair @ 2nd floor. remodeled street facade. move exterior wall to property line @ 3rd floor.Details
3 story horizontal addition at the rear of (e) bldg. minor additions at 2nd & 3rd floor. interior remodel. add entry & stair @ 2nd floor. remodeled street facade. move exterior wall to property line @ 3rd floor. | $200,000 |