Back to kitchen remodel contractors
San's Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Jan 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 42 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 15 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2026 | Completed final sign-off Aug 2026 | 457 Sanchez St | unit 457 1/2: remodel bathroom and kitchen. install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac.Details
unit 457 1/2: remodel bathroom and kitchen. install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac. | $40,000 |
| May 17, 2022 | Completed final sign-off Nov 2023 | 737 Shrader St | proposed interior remodeling of (e) 3 units: 3rd fl & 4th fl interior remodel kitchen & bathroom layout modification.Details
proposed interior remodeling of (e) 3 units: 3rd fl & 4th fl interior remodel kitchen & bathroom layout modification. | $10,000 |
| May 10, 2022 | Completed final sign-off May 2024 | 455 Sanchez St | remodel bathroom & kitchen. install insulation & drywall. (n) electrical & plumbing. replace gas line. replace (e) hvac no wall or laout changes. bath tiles: fixtures: replace tub/ shower. kitchen cabinets appliances sink countertopDetails
remodel bathroom & kitchen. install insulation & drywall. (n) electrical & plumbing. replace gas line. replace (e) hvac no wall or laout changes. bath tiles: fixtures: replace tub/ shower. kitchen cabinets appliances sink countertop | $40,000 |
| Oct 20, 2020 | Completed final sign-off Jun 2021 | 455 Sanchez St | remodel bathroom and kitchen install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac.Details
remodel bathroom and kitchen install insulation and new drywall. new electrical and plumbing. replace gas line. replace existing hvac. | $40,000 |
| Jun 24, 2020 | Completed final sign-off Jun 2022 | 90 Santa Paula Av | kitchen remodel: replace (e) window in breakfast nook with (n) sliding glass door, install (n) landing and stairway to the (e) exterior patio, replace (e) window in butler's pantry with (n) window, exterior to be patched and repaired with same stucco finish and colores to match (e) structure,Details
kitchen remodel: replace (e) window in breakfast nook with (n) sliding glass door, install (n) landing and stairway to the (e) exterior patio, replace (e) window in butler's pantry with (n) window, exterior to be patched and repaired with same stucco finish and colores to match (e) structure, | $50,000 |
| May 18, 2017 | Completed final sign-off May 2018 | 1160 Clay St | apt 3: remodel bathroom & kitchen: rewiring & install subpanel. remodel in-kind with same area. replace dry wall.Details
apt 3: remodel bathroom & kitchen: rewiring & install subpanel. remodel in-kind with same area. replace dry wall. | $38,000 |
| Jan 20, 2012 | Completed final sign-off May 2012 | 16 Gladys St | remodel kitchen, bath, new closets, new furnace to replace extgDetails
remodel kitchen, bath, new closets, new furnace to replace extg | $23,000 |
| Nov 16, 2011 | Completed final sign-off Dec 2011 | 814 Irving St | relocate e prep sink and hand sink. install new kitchen equipment, deli showcase, grille, fryer, ovens, proofer, under counter refrigerator, stainless steel table. new tenant - sheng kee bakeryDetails
relocate e prep sink and hand sink. install new kitchen equipment, deli showcase, grille, fryer, ovens, proofer, under counter refrigerator, stainless steel table. new tenant - sheng kee bakery | $8,000 |
| Dec 4, 2008 | Never finaled issued Dec 2008, no final | 909 Central Av | work @ unit# 909-b only. remodel kitchen & bathroom. rewire electrical. outlet & light. replace insulation & dry wall. no structural work.Details
work @ unit# 909-b only. remodel kitchen & bathroom. rewire electrical. outlet & light. replace insulation & dry wall. no structural work. | $26,700 |
| Sep 28, 2007 | Completed final sign-off Jun 2008 | 792 Junipero Serra Bl | legalize bedroom bath and laundry area at rear portion of ex. garage level, remodel ex. kitchen at 1st floor,remodel ex. bathroom at 2nd floor.Details
legalize bedroom bath and laundry area at rear portion of ex. garage level, remodel ex. kitchen at 1st floor,remodel ex. bathroom at 2nd floor. | $20,000 |
| Jun 25, 2007 | Completed final sign-off Nov 2007 | 1160 Clay St | work on unit#6a only.remodel (1) kitchen and (1)bath room. rewire electrical in kitchen, in kitchen, bath, dining, drywall in one unit. non structural . new lighting. removation to comply w/title 24 energy codes.Details
work on unit#6a only.remodel (1) kitchen and (1)bath room. rewire electrical in kitchen, in kitchen, bath, dining, drywall in one unit. non structural . new lighting. removation to comply w/title 24 energy codes. | $15,000 |
| Apr 19, 2007 | Completed final sign-off Nov 2007 | 1160 Clay St | work on unit#9 only. remodeling bathroom, kitchen, wall heat, replace drywall, rewiring. no windows + no door work #4738Details
work on unit#9 only. remodeling bathroom, kitchen, wall heat, replace drywall, rewiring. no windows + no door work #4738 | $28,000 |
| Oct 20, 2006 | Completed final sign-off Dec 2006 | 909 Central Av | kitchen remodel, bathroom remodel at existing (kitchen & bath). work in unit # 909 & 911, no changes to partitions or windows.Details
kitchen remodel, bathroom remodel at existing (kitchen & bath). work in unit # 909 & 911, no changes to partitions or windows. | $30,000 |
| Jun 26, 2002 | Completed final sign-off Aug 2002 | 1160 Clay St | #4- rmodel & remove plaster at bedroom/living room/kitchen/hallway. replace new elec. wiring insulatDetails
#4- rmodel & remove plaster at bedroom/living room/kitchen/hallway. replace new elec. wiring insulat | $15,000 |
| Jul 12, 2001 | Completed final sign-off Jan 2002 | 1511 33rd Av | remodel:kitchen, bath &1/2, replace wiring, drywall. cabinet, tile, bath tubDetails
remodel:kitchen, bath &1/2, replace wiring, drywall. cabinet, tile, bath tub | $17,500 |
| Apr 19, 2001 | Completed final sign-off Jul 2001 | 303 19th Av | #303-replace all white vinyl windows in kind., #305-remodel kitchen, bathrm, replace central heater,Details
#303-replace all white vinyl windows in kind., #305-remodel kitchen, bathrm, replace central heater, | $22,000 |
| Nov 3, 2000 | Expired or cancelled expired Feb 2002 | 1148 Broadway | remodel kitchen,bathroom, replace central heat, drain pipe window, elect. sheetrockDetails
remodel kitchen,bathroom, replace central heat, drain pipe window, elect. sheetrock | $23,000 |