Back to kitchen remodel contractors
Sage Construction Services
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Aug 2026
- Last 24 months
- 17 permits filed
67 permits since 2000: 61 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 12 completed, 4 in progress. Typically 15 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Sep 2026 | 1716 Broadway | building exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closetDetails
building exterior: replace some (e) windows, re roof and paint, add new guardrails. level 1: expand existing habitable space, remodel an existing bathroom and add a kitchenette (2-burner), laundry closet and deck. level 2/3: remodel existing kitchens and bathrooms, add laundry closet | $475,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 478 17th Av | 1st flr: covert storage to 625sf habitable (bedrm, family rm, bath). new vestibule for elect meter & entry to space. 2nd flr: kitchen, bath remodel new sliding dr to patio. 3rd flr: south lightwell infill. (20sf) adj. to neighbor blind wall. add skylight. add bath. remodel bath. renvate bedroomDetails
1st flr: covert storage to 625sf habitable (bedrm, family rm, bath). new vestibule for elect meter & entry to space. 2nd flr: kitchen, bath remodel new sliding dr to patio. 3rd flr: south lightwell infill. (20sf) adj. to neighbor blind wall. add skylight. add bath. remodel bath. renvate bedroom | $242,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 300 Valley St | unit #3: remodel of kitchen and bathroom in kind.Details
unit #3: remodel of kitchen and bathroom in kind. | $95,000 |
| Nov 7, 2025 | Completed final sign-off Jan 2026 | 171 Westmoorland Dr | replace e skylight in kind in kitchenDetails
replace e skylight in kind in kitchen | $1,000 |
| Jul 3, 2025 | Completed final sign-off Jan 2026 | 171 Westmoorland Dr | kitchen remodel down to the studs to include new plumbing, electrical and finishesDetails
kitchen remodel down to the studs to include new plumbing, electrical and finishes | $52,358 |
| Apr 11, 2025 | Completed final sign-off Sep 2025 | 373 Upper Tr | revision to pa # 2024-1126-5711: scope changes- furnace abandoned to heat pump/mini split system. kitchen layout adjustedDetails
revision to pa # 2024-1126-5711: scope changes- furnace abandoned to heat pump/mini split system. kitchen layout adjusted | |
| Mar 31, 2025 | In progress filed Mar 2025, not yet issued | 137 Beulah St | g/f:new bedrm,family rm,bath,laundry and closet.new foundation & slab.2/f:remodel/reconfig (e) kitchen, bath,media rm,dining rm, and new stairs.replace (e) deck & stairs at rear.3/f: remodel (e) bath and reconfig closets in bedrm.front:replace (e)wood sashes to match (e).Details
g/f:new bedrm,family rm,bath,laundry and closet.new foundation & slab.2/f:remodel/reconfig (e) kitchen, bath,media rm,dining rm, and new stairs.replace (e) deck & stairs at rear.3/f: remodel (e) bath and reconfig closets in bedrm.front:replace (e)wood sashes to match (e). | $625,000 |
| Feb 7, 2024 | Completed final sign-off Sep 2024 | 520 Noriega St | renovation of primary bathroom & closet, renovation of kitchen. refinishing of basement & window upgrade. add hvac unit at rear yard.Details
renovation of primary bathroom & closet, renovation of kitchen. refinishing of basement & window upgrade. add hvac unit at rear yard. | $90,000 |
| May 1, 2023 | Completed final sign-off Feb 2024 | 165 San Fernando Wy | remodel in-kind kitchen, (3) bathrooms and (1) powder room.no str. work, no floor plan layout change.Details
remodel in-kind kitchen, (3) bathrooms and (1) powder room.no str. work, no floor plan layout change. | $85,000 |
| Nov 16, 2022 | Completed final sign-off Oct 2023 | 1243 12th Av | 2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage roomDetails
2 front facade, repair (e) dry-rot @ the entry stairs & porch to match in-kind; 2nd fl - add gas fireplace & remodel (e) kitchen; 3rd f- add (n) bathroom & remodel (e) bathroom; 1st fl - add fire rated wall & door betweeen garage & storage room | $95,000 |
| Jul 28, 2022 | Completed final sign-off Jul 2024 | 309 Surrey St | 2nd fl kitchen, living, dining, entry, powder bath. work includes demo and new construction. relocate structural wall. new plumbing, lighting, new cabinetry. lighting and finishesDetails
2nd fl kitchen, living, dining, entry, powder bath. work includes demo and new construction. relocate structural wall. new plumbing, lighting, new cabinetry. lighting and finishes | $50,000 |
| Jun 10, 2022 | Completed final sign-off Nov 2022 | 3880 Jackson St | replace kitchen countertops with new stone and backsplash.Details
replace kitchen countertops with new stone and backsplash. | $3,000 |
| Nov 23, 2021 | Completed final sign-off Jan 2023 | 50 Taraval St | 1st floor kitchen:work to include demolition and new constuction new plumbing, cabinetry, lighting and finishes. relocate laundry room 1st floor to 2nd floor. add new bath on 2nd floor.Details
1st floor kitchen:work to include demolition and new constuction new plumbing, cabinetry, lighting and finishes. relocate laundry room 1st floor to 2nd floor. add new bath on 2nd floor. | $62,000 |
| May 20, 2021 | Completed final sign-off Aug 2022 | 165 Terrace Dr | interior remodel of (e) 3602.4 sq ft - 4 story bldg with (e) garage, kitchen rmeodel at 1st fl, (n) washer/dryer. 2nd fl work includes master bath and bath 1 remodels and demo of (e) ladder to attic. construction of (n) stairs from 2nd fl to attick and (n) skylight.Details
interior remodel of (e) 3602.4 sq ft - 4 story bldg with (e) garage, kitchen rmeodel at 1st fl, (n) washer/dryer. 2nd fl work includes master bath and bath 1 remodels and demo of (e) ladder to attic. construction of (n) stairs from 2nd fl to attick and (n) skylight. | $300,000 |
| Mar 12, 2021 | Completed final sign-off Aug 2021 | 823 Shrader St | unit #6: remodel 1 kitchen & 1 bathroom in kind. replace fixtures & finishes. no layout change. remodel bedroom, add lighting. new sheetrock. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
unit #6: remodel 1 kitchen & 1 bathroom in kind. replace fixtures & finishes. no layout change. remodel bedroom, add lighting. new sheetrock. new lighting shall comply with cec 150.0(k)3 & (k)5. | $62,000 |
| Feb 9, 2021 | Completed final sign-off Aug 2021 | 1375 Masonic Av | remodel kitchen in-kind replace fixtures, finishes, cabinets, no walls to be moved, remodel bathroom and powder rm in-kind, no walls moved, all work is non-structuralDetails
remodel kitchen in-kind replace fixtures, finishes, cabinets, no walls to be moved, remodel bathroom and powder rm in-kind, no walls moved, all work is non-structural | $95,000 |