Back to kitchen remodel contractors
Sage Building Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Mar 2026
- Last 24 months
- 3 permits filed
50 permits since 2000: 47 completed, 1 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 14 completed, 1 expired or cancelled. Typically 11 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 5, 2022 | Completed final sign-off Jan 2023 | 706 Douglass St | kitchen remodel. new layout, new windows to replace existing, new header for wider opening.Details
kitchen remodel. new layout, new windows to replace existing, new header for wider opening. | $35,000 |
| Jan 15, 2020 | Completed final sign-off Feb 2020 | 4354 17th St | repair in kind with sheetrock damaged by water at kitchen on 2nd floor. refinish hardwood floor.Details
repair in kind with sheetrock damaged by water at kitchen on 2nd floor. refinish hardwood floor. | $10,000 |
| Mar 4, 2019 | Completed final sign-off Sep 2020 | 4356 17th St | remodel 1 bathroom and kitchen at top unit in kind.Details
remodel 1 bathroom and kitchen at top unit in kind. | $100,000 |
| Mar 19, 2018 | Completed final sign-off Apr 2020 | 223 Molimo Dr | 1st flr- new bath, closet, wine cellar, 2nd flr- new laundry rm, bathroom, stairs 3rd flr- reconfigure (e) kitchen, new bathrooms and stairs. no exterior work.Details
1st flr- new bath, closet, wine cellar, 2nd flr- new laundry rm, bathroom, stairs 3rd flr- reconfigure (e) kitchen, new bathrooms and stairs. no exterior work. | $120,000 |
| Mar 12, 2018 | Expired or cancelled withdrawn Mar 2018 | 223 Molimo Dr | 1st floor: reconfigure to add bathroom, closet, wine cellar. 2nd floor: reconfigure to add laundry room, bathroom. 3rd floor: reconfigure extg kitchen, new en-suite bathrooms, powder room; sliding glass scenic doors.Details
1st floor: reconfigure to add bathroom, closet, wine cellar. 2nd floor: reconfigure to add laundry room, bathroom. 3rd floor: reconfigure extg kitchen, new en-suite bathrooms, powder room; sliding glass scenic doors. | $85,000 |
| Feb 28, 2018 | Completed final sign-off Sep 2021 | 776 Wisconsin St | construct a steel & glass bridge/catwalk & stairs to connect (e) kitchen deck to backyard (46 sq ft)Details
construct a steel & glass bridge/catwalk & stairs to connect (e) kitchen deck to backyard (46 sq ft) | $5,000 |
| Oct 27, 2017 | Completed final sign-off Jul 2018 | 4354 17th St | remodel kitchen and bath. add recessed lights at living rm. remove wall at kitchenDetails
remodel kitchen and bath. add recessed lights at living rm. remove wall at kitchen | $80,000 |
| Jul 28, 2016 | Completed final sign-off Apr 2017 | 156 Noe St | open kitchen to dining room, reconfigurate hall bath to master bath, renovate hall bath to full bath.Details
open kitchen to dining room, reconfigurate hall bath to master bath, renovate hall bath to full bath. | $100,000 |
| Jun 8, 2016 | Completed final sign-off Oct 2016 | 158 Noe St | remodel kitchen- some new cabinets, new counters & backsplash- revision to permit #201602028629.Details
remodel kitchen- some new cabinets, new counters & backsplash- revision to permit #201602028629. | $10,000 |
| Feb 2, 2016 | Completed final sign-off Oct 2016 | 158 Noe St | opening between dining room and kitchen, add window, create new hall bath, reconfigure extg bath.Details
opening between dining room and kitchen, add window, create new hall bath, reconfigure extg bath. | $45,000 |
| Sep 24, 2015 | Completed final sign-off Feb 2018 | 4068 17th St | interior remodel of bathroom & kitchen. exterior door at rear being added & 2 side windows removed. ceiling being replaced with sound proofing & front & side windows being replaced in kindDetails
interior remodel of bathroom & kitchen. exterior door at rear being added & 2 side windows removed. ceiling being replaced with sound proofing & front & side windows being replaced in kind | $30,000 |
| Jan 31, 2013 | Completed final sign-off Aug 2014 | 4064 17th St | infill (e) west lightwell at 1st level only. new skylight. raise roof of (e) laundry room. add new deck. reconstruct (e) front porch & stairs due to water damage. new master bathroom on 3rd floor. new powder room on 2nd floor, kitchen expansion on 2nd floor. new stairs, bathroom, storage & wineDetails
infill (e) west lightwell at 1st level only. new skylight. raise roof of (e) laundry room. add new deck. reconstruct (e) front porch & stairs due to water damage. new master bathroom on 3rd floor. new powder room on 2nd floor, kitchen expansion on 2nd floor. new stairs, bathroom, storage & wine | $200,000 |
| Jan 9, 2012 | Completed final sign-off Jul 2012 | 716 Sanchez St | remove & replace (e) kitchen cabinets, replace cabinets & tile in 2 baths, replace 2 pocket doors with glass pocket doors, replace hardwood floor in entire house.Details
remove & replace (e) kitchen cabinets, replace cabinets & tile in 2 baths, replace 2 pocket doors with glass pocket doors, replace hardwood floor in entire house. | $85,000 |
| Oct 20, 2010 | Completed final sign-off Jul 2011 | 49 Divisadero St | create new master bath at 2nd fl. new w/d closet at 3rd fl. remodel (e) kitchen and bathrm at 2nd fl. replacement and new windows and french door at 2nd fl, not visible from streetDetails
create new master bath at 2nd fl. new w/d closet at 3rd fl. remodel (e) kitchen and bathrm at 2nd fl. replacement and new windows and french door at 2nd fl, not visible from street | $62,000 |
| Aug 13, 2009 | Completed final sign-off Oct 2009 | 78 Barcelona Av | kitchen remodel. upgdate electrical and plumbing, new cabinets and fixtures. min 50 high lightingDetails
kitchen remodel. upgdate electrical and plumbing, new cabinets and fixtures. min 50 high lighting | $20,000 |