Back to bathroom remodel contractors
Safe Step Walk-In Tub Company Inc.
- Based in
- Huntington Beach
- On San Francisco permits
- Mar 2014 to Oct 2021
- Last 24 months
- 0 permits filed
107 permits since 2000: 69 completed, 30 never finaled, 8 expired or cancelled.
Of the 30 never-finaled permits, 26 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
54 bathroom remodel permits: 31 completed, 20 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 24 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 2950 21st Av | replace (e) tub w/ walk in model lp5116 in master bathroom. install (e0 20 amp circuit. drywall patch, shower head < 1.8 gpm.Details
replace (e) tub w/ walk in model lp5116 in master bathroom. install (e0 20 amp circuit. drywall patch, shower head < 1.8 gpm. | $9,500 |
| May 25, 2021 | Never finaled issued May 2021, no final | 236 Romain St | replace (e0 tub with walkin tub model lp5116. instlal 1 20amp ckt. drywall patch to match (e) in hallway bath 1/f.Details
replace (e0 tub with walkin tub model lp5116. instlal 1 20amp ckt. drywall patch to match (e) in hallway bath 1/f. | $9,500 |
| Apr 28, 2021 | Never finaled issued Apr 2021, no final | 2551 42nd Av | replace (e) bath tub w/ a walking tub, install 1 new 20-mp circut for the tub outlet, drywall patch. hallyway bath model:lp 511b. comly w/ cbc 150.0(k)5.Details
replace (e) bath tub w/ a walking tub, install 1 new 20-mp circut for the tub outlet, drywall patch. hallyway bath model:lp 511b. comly w/ cbc 150.0(k)5. | $9,500 |
| Feb 9, 2021 | Completed final sign-off Mar 2021 | 1143 Gilman Av | partial bathroom remodel. replace existing tub with walk in tub, minor drywall patchDetails
partial bathroom remodel. replace existing tub with walk in tub, minor drywall patch | $9,500 |
| Feb 3, 2021 | Completed final sign-off Mar 2021 | 1893 Diamond St | replace existing tub with new walk in tub. minor drywall patch. hall bathDetails
replace existing tub with new walk in tub. minor drywall patch. hall bath | $9,500 |
| Jan 12, 2021 | Completed final sign-off Feb 2021 | 1578 Shrader St | replacer (e) tub w/ (n) walk-in soaker tub, minor drywall patch in master bathDetails
replacer (e) tub w/ (n) walk-in soaker tub, minor drywall patch in master bath | $9,500 |
| Jan 12, 2021 | Never finaled issued Jan 2021, no final | 1050 North Point St | replacer (e) tub w/ (n) walk-in soaker tub, minor drywall patch in master bathDetails
replacer (e) tub w/ (n) walk-in soaker tub, minor drywall patch in master bath | $9,500 |
| Dec 2, 2020 | Never finaled issued Dec 2020, no final | 136 Broad St | replace existing tub with walk in tub, minor drywall patch in hall bath.Details
replace existing tub with walk in tub, minor drywall patch in hall bath. | $9,500 |
| Jul 24, 2020 | Completed final sign-off Aug 2020 | 260 Amber Dr | replace existing tub with a walk-in tub in same location. bathroom approx 40 sqft. install 1 new 20 amp circuit for the outlet, drywall patch as needed approx 2-4 sqft.Details
replace existing tub with a walk-in tub in same location. bathroom approx 40 sqft. install 1 new 20 amp circuit for the outlet, drywall patch as needed approx 2-4 sqft. | $7,500 |
| Jul 15, 2020 | Never finaled issued Jul 2020, no final | 541 Bright St | hallway bathroom, remove (e) tup, install (n) walk-in tub (one bathroom). install (n) 20amp circuit for outlet, dry wall patch. no (n) wall & no (e) wall relocation. no (n) lightingDetails
hallway bathroom, remove (e) tup, install (n) walk-in tub (one bathroom). install (n) 20amp circuit for outlet, dry wall patch. no (n) wall & no (e) wall relocation. no (n) lighting | $2,500 |
| Jul 14, 2020 | Never finaled issued Jul 2020, no final | 1209 Green St | remove (e) tub, replace with walk-in jet tub add (1) 20a ckt for outlet, minor dryawall patch, hallway bath.Details
remove (e) tub, replace with walk-in jet tub add (1) 20a ckt for outlet, minor dryawall patch, hallway bath. | $7,500 |
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 3320 Baker St | remove (e) tub, replace with walk-in jet tub. add 1-20a ckt for outlet, minor drywall patch, hallway bathroom.Details
remove (e) tub, replace with walk-in jet tub. add 1-20a ckt for outlet, minor drywall patch, hallway bathroom. | $7,500 |
| Dec 23, 2019 | Completed final sign-off Jan 2020 | 420 28th Av | remove tub, install walk-in tub. intsall 2 (15 amps) citcuits for dry wall patch master bathroomDetails
remove tub, install walk-in tub. intsall 2 (15 amps) citcuits for dry wall patch master bathroom | $7,500 |
| Jun 11, 2019 | Never finaled issued Jun 2019, no final | 345 Arguello Bl | unit 204. remove (e) tub, replace w/ walk-in jet tub, add 1 -20 amp circuit for outlet, minor drywall patch in master bathDetails
unit 204. remove (e) tub, replace w/ walk-in jet tub, add 1 -20 amp circuit for outlet, minor drywall patch in master bath | $7,500 |
| Jun 5, 2019 | Never finaled issued Jun 2019, no final | 145 Lower Tr | replace (e) tub replace with working jet tub, add 1-20amp ckt and outlet drywall repair. no structural changes. same location, guest bathroom.Details
replace (e) tub replace with working jet tub, add 1-20amp ckt and outlet drywall repair. no structural changes. same location, guest bathroom. | $7,500 |
| Feb 20, 2019 | Completed final sign-off Apr 2019 | 625 Holloway Av | one bathroom remodel on first floor: replace existing tub with new walkin tub. new 20 amp gfci circuit in guest bathroom first floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5.Details
one bathroom remodel on first floor: replace existing tub with new walkin tub. new 20 amp gfci circuit in guest bathroom first floor. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5. | $20,980 |
| Dec 5, 2018 | Expired or cancelled expired Jun 2026 | 800 Girard St | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom first floorDetails
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom first floor | $16,900 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 1151 Ingerson Av | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom, 2nd floorDetails
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom, 2nd floor | $7,500 |
| Nov 6, 2018 | Never finaled issued Nov 2018, no final | 239 Brannan St | unit 16c: replace (e) tub w/new walk-in tub, new 20 amp gfci circuit in master bathroomDetails
unit 16c: replace (e) tub w/new walk-in tub, new 20 amp gfci circuit in master bathroom | $7,500 |
| Nov 6, 2018 | Completed final sign-off Nov 2018 | 9 Perego Tr | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroomDetails
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom | $7,500 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 21 Roanoke St | replace extg tub with new walkin tub, new 20 amp gfci circuit in hall bathroom on 2nd floor.Details
replace extg tub with new walkin tub, new 20 amp gfci circuit in hall bathroom on 2nd floor. | $7,500 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 875 Lombard St | replace extg tub with new walk in tub, new 20 amp gfci circuit in master bathroom 1st floor. no walls moved, removed added or infilled. all extg layouts to remain unchanged.Details
replace extg tub with new walk in tub, new 20 amp gfci circuit in master bathroom 1st floor. no walls moved, removed added or infilled. all extg layouts to remain unchanged. | $7,500 |
| Jul 16, 2018 | Completed final sign-off Sep 2018 | 371 25th Av | unit 202. replace (e) tub w/ (n) walk-in tub, (n) 20 amp gfci circuit at hall bathroom second floorDetails
unit 202. replace (e) tub w/ (n) walk-in tub, (n) 20 amp gfci circuit at hall bathroom second floor | $17,900 |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 2236 Washington St | replace (e) tub w/ (n) walk-in tub, (n) 20 amp gfci circuit at hall bathroom 2nd floorDetails
replace (e) tub w/ (n) walk-in tub, (n) 20 amp gfci circuit at hall bathroom 2nd floor | $18,561 |
| Jul 16, 2018 | Completed final sign-off Aug 2018 | 506 Anderson St | replace (e) shower (n) walk-n tub, (n) 20 amp gfci circuit in hall bathroom, 2nd floorDetails
replace (e) shower (n) walk-n tub, (n) 20 amp gfci circuit in hall bathroom, 2nd floor | $19,076 |
| Jun 5, 2018 | Completed final sign-off Aug 2018 | 9 Jennings Ct | replace tub with new walkin-in tub, new 20 amp gfci circuit in master bathroom on 2/fDetails
replace tub with new walkin-in tub, new 20 amp gfci circuit in master bathroom on 2/f | $18,400 |
| Jun 5, 2018 | Completed final sign-off Jun 2018 | 71 Blake St | replace tub with new walkin tub, new 20 amp gfci circuit in hall bathroom on 2/fDetails
replace tub with new walkin tub, new 20 amp gfci circuit in hall bathroom on 2/f | $13,000 |
| Mar 21, 2018 | Never finaled issued Mar 2018, no final | 146 Ralston St | replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 2/fDetails
replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 2/f | $16,900 |
| Mar 21, 2018 | Completed final sign-off May 2018 | 1531 29th Av | replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 1/fDetails
replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 1/f | $12,900 |
| Mar 21, 2018 | Completed final sign-off Apr 2018 | 240 Stillings Av | replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 1/fDetails
replace (e) tub with walk in tub, 20 amp circuit, in hall bathroom on 1/f | $15,900 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 645 Haight St | unit #20: replace (e) tub with (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroomDetails
unit #20: replace (e) tub with (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroom | $14,900 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 4119 17th St | replace (e) tub with (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroom, replace water heater on site.Details
replace (e) tub with (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroom, replace water heater on site. | $12,000 |
| Jan 24, 2018 | Never finaled issued Jan 2018, no final | 565 Arkansas St | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom. replace water heater at same locationDetails
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit in hall bathroom. replace water heater at same location | $15,900 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 2116 18th Av | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit on second floor hall bathroom.Details
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit on second floor hall bathroom. | $16,000 |
| Jan 24, 2018 | Completed final sign-off Feb 2018 | 50 Grafton Av | replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit on first floor hall bathroom.Details
replace (e) tub with (n) walk-in tub, (n) 20amp gfci circuit on first floor hall bathroom. | $17,400 |
| Dec 13, 2017 | Completed final sign-off Jan 2018 | 10 Augusta St | replace (e) tub in hall bathroom with (n) walk-in tub on second floor. (n) 20 amp gfci circuitDetails
replace (e) tub in hall bathroom with (n) walk-in tub on second floor. (n) 20 amp gfci circuit | $17,400 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 461 Vermont St | rerplace (e) tub with (n) walkin-in tub, (n) 20amp gfci circuit in hall bathroom on first floor.Details
rerplace (e) tub with (n) walkin-in tub, (n) 20amp gfci circuit in hall bathroom on first floor. | $17,400 |
| Oct 10, 2017 | Completed final sign-off Oct 2017 | 1833 Newhall St | rerplace (e) tub in (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroom.Details
rerplace (e) tub in (n) walk-in tub, (n) 20 amp gfci circuit in hall bathroom. | $11,495 |
| Sep 12, 2017 | Completed final sign-off Sep 2017 | 21 Deming St | replace (e) tub with (n) walk-in tub, (n) 20amp circuit in hall bathroom on first floorDetails
replace (e) tub with (n) walk-in tub, (n) 20amp circuit in hall bathroom on first floor | $16,900 |
| Aug 9, 2017 | Completed final sign-off Sep 2017 | 74 Gould St | replace (e) tub with (n) walk-in tub in hall bathroom @ 2nd floor , (n) 20 ampgfci circuit.Details
replace (e) tub with (n) walk-in tub in hall bathroom @ 2nd floor , (n) 20 ampgfci circuit. | $21,880 |
| Aug 9, 2017 | Completed final sign-off Sep 2017 | 2610 36th Av | replace (e) tub with (n) walk-in tub in master bathroom on 2nd floor. (n) 20 amp 6 fci circuit.Details
replace (e) tub with (n) walk-in tub in master bathroom on 2nd floor. (n) 20 amp 6 fci circuit. | $18,900 |
| Jun 27, 2017 | Expired or cancelled cancelled Oct 2019 | 711 Central Av | replace (e) tub with (n) walk-in tub in hall bathroom, (n) 20 amp gfci circuit.Details
replace (e) tub with (n) walk-in tub in hall bathroom, (n) 20 amp gfci circuit. | $16,900 |
| May 18, 2017 | Completed final sign-off Jun 2017 | 2379 29th Av | replace (e) jacuzzi tub with (n) walk in tub in master bathroom (n) 20 amp gfci circuit, no other workDetails
replace (e) jacuzzi tub with (n) walk in tub in master bathroom (n) 20 amp gfci circuit, no other work | $17,400 |
| May 18, 2017 | Completed final sign-off Jun 2017 | 631 02nd Av | replace (e) jacuzzi tub with (n) walk in tub in master bath, (n) 20 amp gfci circuit , no other workDetails
replace (e) jacuzzi tub with (n) walk in tub in master bath, (n) 20 amp gfci circuit , no other work | $16,900 |
| Apr 18, 2017 | Never finaled issued Apr 2017, no final | 743 Brussels St | replace (e) tub w/ (n) walk-in tub in hall bath on 1st fl (n) 20 amp gfci circuit.Details
replace (e) tub w/ (n) walk-in tub in hall bath on 1st fl (n) 20 amp gfci circuit. | $12,900 |
| Apr 18, 2017 | Completed final sign-off May 2017 | 1634 Grove St | replace (e) tub with (n) walk-in tub in hall bath on 2nd floor. (n) 20 amp gfci circuit.Details
replace (e) tub with (n) walk-in tub in hall bath on 2nd floor. (n) 20 amp gfci circuit. | $18,980 |
| Jan 17, 2017 | Expired or cancelled cancelled Feb 2017 | 750 El Camino Del Mar | replace (e) tub with new walk-in tub in hall bathroom, 20 amp gfci circuitDetails
replace (e) tub with new walk-in tub in hall bathroom, 20 amp gfci circuit | $14,900 |
| Jul 11, 2016 | Completed final sign-off Jul 2016 | 58 Colby St | replace (e) tub with walk-in tub in hall bathroom 21 a circuite, gfci outletDetails
replace (e) tub with walk-in tub in hall bathroom 21 a circuite, gfci outlet | $15,900 |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 3825 Quintara St | replace (e)tub with walk-in tub in hall bathroom; 20amp circuit, gfci outletDetails
replace (e)tub with walk-in tub in hall bathroom; 20amp circuit, gfci outlet | $16,900 |
| Feb 22, 2016 | Completed final sign-off Mar 2016 | 1723 Geneva Av | replace tub with walk-in tub w/ electrical in (e) upper level bathroom.Details
replace tub with walk-in tub w/ electrical in (e) upper level bathroom. | $16,400 |
| Aug 5, 2015 | Completed final sign-off Aug 2015 | 10 Castillo St | replace tub with walk-in tube in master bathroom.Details
replace tub with walk-in tube in master bathroom. | $17,900 |
| May 28, 2015 | Completed final sign-off Jun 2015 | 1275 40th Av | replace walk-in shower with walk-in tub, guest bathroom at 1/f, one 20 amp breaker, 1 gfi, 2 outlets.Details
replace walk-in shower with walk-in tub, guest bathroom at 1/f, one 20 amp breaker, 1 gfi, 2 outlets. | $10,900 |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 235 Lansdale Av | bathroom remodel, replace (e) tube with install waink-in tub.Details
bathroom remodel, replace (e) tube with install waink-in tub. | $14,000 |
| Jul 23, 2014 | Completed final sign-off Jul 2014 | 1557 Thomas Av | bathroom remodel, replace existing tub with walk-in tub, 15 amps breaker, 2 gfi outletsDetails
bathroom remodel, replace existing tub with walk-in tub, 15 amps breaker, 2 gfi outlets | $16,150 |