Block 7509, lot 032
260 Amber Dr
- City’s use
- Single Family Residential
- Built
- 1964
- Stories
- 2
- Units
- 1
- Rooms
- 5 bedrooms, 3 bathrooms
- Building
- 2,285 sq ft
- Lot
- 2,640 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2026 | Completed final sign-off Aug 2026 | 260 Amber Dr | Seismic Retrofitters Inc. | voluntary structural strenghening @ cripple walls below floors 5/8" tr bolts @ 48" spacing 7" min embedment epoxy & or simp vfrps, install struc 1 ply over (e) cripple walls.Details
voluntary structural strenghening @ cripple walls below floors 5/8" tr bolts @ 48" spacing 7" min embedment epoxy & or simp vfrps, install struc 1 ply over (e) cripple walls. | $22,152 |
| Jul 24, 2026 | In progress issued Aug 2026 | 260 Amber Dr | Golden State Builders Group Inc | replace 200 sqft deckboards and 60 lf handrails w/ 200 sqft trex enhance deckboards and 60 lf trex composite handrails.Details
replace 200 sqft deckboards and 60 lf handrails w/ 200 sqft trex enhance deckboards and 60 lf trex composite handrails. | $20,000 |
| Oct 15, 2025 | Completed final sign-off Dec 2025 | 260 Amber Dr | Ribas Services | remodel 2x bathrooms and kitchen in kind no wall removal or layout change to abate nov #202539912.Details
remodel 2x bathrooms and kitchen in kind no wall removal or layout change to abate nov #202539912. | $50,000 |
| Jul 24, 2020 | Completed final sign-off Aug 2020 | 260 Amber Dr | Safe Step Walk-In Tub Company Inc. | replace existing tub with a walk-in tub in same location. bathroom approx 40 sqft. install 1 new 20 amp circuit for the outlet, drywall patch as needed approx 2-4 sqft.Details
replace existing tub with a walk-in tub in same location. bathroom approx 40 sqft. install 1 new 20 amp circuit for the outlet, drywall patch as needed approx 2-4 sqft. | $7,500 |
| Jan 7, 2019 | Expired or cancelled cancelled Nov 2022 | 260 Amber Dr | Tesla Energy Operations | install 27 kwh energy storage systemDetails
install 27 kwh energy storage system | |
| Nov 5, 2014 | Completed final sign-off Mar 2015 | 260 Amber Dr | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $24,200 |
| Dec 20, 2005 | Expired or cancelled expired May 2007 | 260 Amber Dr | Lindstrom And Son Builders | construct new full bathroom at ground floor by modification of extg bdrm #1 and adjacent hallDetails
construct new full bathroom at ground floor by modification of extg bdrm #1 and adjacent hall | $15,000 |
| Jun 26, 2003 | Completed final sign-off Sep 2003 | 260 Amber Dr | Lindstrom And Son Builders | interior remodel to kitchen, r & r cabinets counters appliances plumbing lighting floors drywall andDetails
interior remodel to kitchen, r & r cabinets counters appliances plumbing lighting floors drywall and | $30,000 |
| Mar 16, 2001 | Completed final sign-off May 2001 | 260 Amber Dr | Jjj & K Inc./Dba: Alexander Company | 7 windows to be replaced size for sizeDetails
7 windows to be replaced size for size | $16,047 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.