Safe Assurance Fire Protection
- Based in
- Daly City
- On San Francisco permits
- Aug 2015 to Jun 2026
- Last 24 months
- 28 permits filed
102 permits since 2000: 85 completed, 7 in progress, 10 never finaled.
Of the 10 never-finaled permits, 6 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 521 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2015 | Never finaled issued Feb 2017, no final | 2739 Mcallister St | convert (e) 2 units residential bldg into a 3 units residential with horiz. addition @ the rear. (e)bldg remodel 1/f to provide 3 car garage & utility rm @ 1/f addition. 3 story addition at rear yard w/6 feet 6 inches setback to (e) bldg. add new stair to connect (n)3/f between (e) & (n) addition.Details
convert (e) 2 units residential bldg into a 3 units residential with horiz. addition @ the rear. (e)bldg remodel 1/f to provide 3 car garage & utility rm @ 1/f addition. 3 story addition at rear yard w/6 feet 6 inches setback to (e) bldg. add new stair to connect (n)3/f between (e) & (n) addition. | $150,000 |