Back to bathroom remodel contractors
S T C Marin
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Feb 2010
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 12 days from filing to permit and 322 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2010 | Completed final sign-off Jun 2010 | 61 Fair Av | remove load bearing wall at first floor level and replace with steel beam and posts. add shear walls at first floor. new family room and legalize full bathroom at first floor.Details
remove load bearing wall at first floor level and replace with steel beam and posts. add shear walls at first floor. new family room and legalize full bathroom at first floor. | $12,000 |
| Jul 23, 2007 | Completed final sign-off Jan 2009 | 154 15th Av | rev to 200706285444.3/fl-remodel bathrm&walkin closet.2/fl-remodel bathroom&mstr bathrom.replace in-kind 22' of rear exterior wall.1/fl-remodel kitchen&1/2 bath.replace in kind 22' of rear exterior wall.bsmt/garage-remove post&strength beam,chg exercise&guest rm to family rm.remodel bathroom.Details
rev to 200706285444.3/fl-remodel bathrm&walkin closet.2/fl-remodel bathroom&mstr bathrom.replace in-kind 22' of rear exterior wall.1/fl-remodel kitchen&1/2 bath.replace in kind 22' of rear exterior wall.bsmt/garage-remove post&strength beam,chg exercise&guest rm to family rm.remodel bathroom. | $240,000 |