Back to kitchen remodel contractors
S M Sykes General Contractor
- Based in
- Alamo
- On San Francisco permits
- Oct 2020 to Nov 2025
- Last 24 months
- 3 permits filed
9 permits since 2000: 8 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 1 days from filing to permit and 48 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2022 | Completed final sign-off Mar 2022 | 666 Post St | install 10 sq ft of drywall to match existing wall and ceiling condition. prime and paint affected areas. this work will be on kitchen. this is a repair only.Details
install 10 sq ft of drywall to match existing wall and ceiling condition. prime and paint affected areas. this work will be on kitchen. this is a repair only. | $3,500 |
| Jan 26, 2022 | Completed final sign-off Mar 2022 | 666 Post St | all work in kitchen. install 8sq of 5/8 drywall to main existing wall and ceiling condition, prime and paint affected area. all work to be done on the ninth floor.Details
all work in kitchen. install 8sq of 5/8 drywall to main existing wall and ceiling condition, prime and paint affected area. all work to be done on the ninth floor. | $4,000 |