Back to kitchen remodel contractors
S M I Construction Inc.
- Based in
- San Leandro
- On San Francisco permits
- Sep 2005 to Aug 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 22 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 7 days from filing to permit and 230 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2015 | Completed final sign-off May 2016 | 1368 09th Av | change of use from retail to limit restaurant. modify (e) entrance to comply with ada requirement. remodle kitchen & new ada bathroom.Details
change of use from retail to limit restaurant. modify (e) entrance to comply with ada requirement. remodle kitchen & new ada bathroom. | $130,000 |
| Apr 3, 2015 | Never finaled issued Jan 2016, no final | 1366 09th Av | legalize (e) unit & kitchen per ord-43-14. add two layers of type "x" gypsum board to ceiling below unit.Details
legalize (e) unit & kitchen per ord-43-14. add two layers of type "x" gypsum board to ceiling below unit. | $2,000 |
| Nov 8, 2013 | Completed final sign-off Aug 2014 | 401 Mason St | tenant improvement of (e) restaurant (new ownership) - frame for new bar counters, update for accessiblity, construct (n) accessible restrooms, replace or refurbish (e) kitchen equipment.Details
tenant improvement of (e) restaurant (new ownership) - frame for new bar counters, update for accessiblity, construct (n) accessible restrooms, replace or refurbish (e) kitchen equipment. | $200,000 |
| Oct 22, 2009 | Completed final sign-off Jun 2010 | 143 Naples St | rearrange & remdoel 2nd floor, kitchen & bathroom, bedrooms. ground floor 1 new bathroom, 1 new family room and 2 (n) bedrooms.Details
rearrange & remdoel 2nd floor, kitchen & bathroom, bedrooms. ground floor 1 new bathroom, 1 new family room and 2 (n) bedrooms. | $35,000 |
| Feb 3, 2009 | Completed final sign-off Nov 2009 | 319 Vicente St | infill e lightwell and remodel e kitchen on 2nd floor. 2 new bedrooms, new tv room, 1 full bath at ground floorDetails
infill e lightwell and remodel e kitchen on 2nd floor. 2 new bedrooms, new tv room, 1 full bath at ground floor | $35,000 |
| Oct 3, 2005 | Completed final sign-off May 2006 | 301 03rd St | demolition on (e) restaurant, remove furniture, kitchen equipment. ground floor interior soft demo.Details
demolition on (e) restaurant, remove furniture, kitchen equipment. ground floor interior soft demo. | $7,000 |
| Sep 30, 2005 | Completed final sign-off May 2006 | 699 Folsom St | remodel of (e)restaurant.repair,reuse & replace (e)kitchen equipment as shown on kitchen drawings. enclose (e)'open' kitchen. add walls to separate dining room from service areas. upgrade to current accessiblility codes in the public & service restrooms & @the bar. new paint,furniture,floor finishesDetails
remodel of (e)restaurant.repair,reuse & replace (e)kitchen equipment as shown on kitchen drawings. enclose (e)'open' kitchen. add walls to separate dining room from service areas. upgrade to current accessiblility codes in the public & service restrooms & @the bar. new paint,furniture,floor finishes | $95,000 |