S L Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jan 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 13 completed, 1 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2025 | Completed final sign-off Oct 2025 | 1738 46th Av | remodel kitchen in kindDetails
remodel kitchen in kind | $15,000 |
| Jun 10, 2016 | Completed final sign-off Mar 2017 | 175 Riverton Dr | 2nd floor - remodel (e) kitchen, 2 bathrooms and 2 bedrooms; additional bathroom on 1st floor. remodel utility room to office. led ceiling lights in renovated areasDetails
2nd floor - remodel (e) kitchen, 2 bathrooms and 2 bedrooms; additional bathroom on 1st floor. remodel utility room to office. led ceiling lights in renovated areas | $40,000 |
| Oct 15, 2008 | Completed final sign-off Jan 2009 | 1778 38th Av | remodel kitchen and bathroom, replace all new cabinets, relocate stove and replace all tiles in bathroom, layout does not change at 2nd floor. no removal or relocation of existing wall.Details
remodel kitchen and bathroom, replace all new cabinets, relocate stove and replace all tiles in bathroom, layout does not change at 2nd floor. no removal or relocation of existing wall. | $17,000 |
| Sep 3, 2008 | Completed final sign-off Oct 2008 | 702 Moultrie St | remodel kitchen & 1 1/2 bathrooms.Details
remodel kitchen & 1 1/2 bathrooms. | $20,000 |
| Jul 3, 2007 | Completed final sign-off Mar 2008 | 243 Noriega St | remodel (e) kitchen & 2 bathrooms on 2nd level. restructure ceiling joists over the kitchen, remove protion of walls for electrical work & insulations.Details
remodel (e) kitchen & 2 bathrooms on 2nd level. restructure ceiling joists over the kitchen, remove protion of walls for electrical work & insulations. | $20,000 |
| Nov 9, 2005 | Completed final sign-off Mar 2006 | 2329 Taraval St | remodel top unit at top floor, replace all sheetrock and install new insulation. electrical upgrade, remodel kitchen and bathroom (no structural work)Details
remodel top unit at top floor, replace all sheetrock and install new insulation. electrical upgrade, remodel kitchen and bathroom (no structural work) | $40,000 |
| Jan 14, 2000 | Completed final sign-off Jul 2000 | 417 Noriega St | remodel 2 bathrooms and 1 kitchenDetails
remodel 2 bathrooms and 1 kitchen | $8,000 |