S K Building Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2016 to Mar 2026
- Last 24 months
- 5 permits filed
20 permits since 2000: 18 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 15 days from filing to permit and 483 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2024 | Expired or cancelled expired Jan 2026 | 825 Cabrillo St | 1/f: remodel bedroom office. add 2 bathroom and wet bar. 2/f: add interior stairs connect to 1/f. replace all front windows with aluminum clad hung wood windows. no removal of any dwelling units. (2) units to remain. replace interior finishes.Details
1/f: remodel bedroom office. add 2 bathroom and wet bar. 2/f: add interior stairs connect to 1/f. replace all front windows with aluminum clad hung wood windows. no removal of any dwelling units. (2) units to remain. replace interior finishes. | $76,000 |
| Sep 30, 2021 | Completed final sign-off May 2022 | 216 Montana St | repair front stair 50 %, remodel kitchen & bathroom. replace 8 windiws - aluminum clad wood double hung on front and side elevations, vinyl windows on rear elevation. new 200a e. panel. no other work. u factor <.30 max.Details
repair front stair 50 %, remodel kitchen & bathroom. replace 8 windiws - aluminum clad wood double hung on front and side elevations, vinyl windows on rear elevation. new 200a e. panel. no other work. u factor <.30 max. | $48,000 |
| Jul 27, 2017 | Completed final sign-off Sep 2019 | 4712 25th St | 2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per planDetails
2nd fl - remodel kitchen, bathroom & bedrooms, relocated interior stair and add 1 full bath; 1st fl - add 2 bedrooms, 2 full bath, laundry room & non- bearing partition wall per plan | $96,000 |