Back to bathroom remodel contractors
S J L Construction*** Pls See 959755****
- Based in
- Mill Valley
- On San Francisco permits
- Feb 2005 to Feb 2011
- Last 24 months
- 0 permits filed
24 permits since 2000: 19 completed, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 220 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2011 | Completed final sign-off Jun 2011 | 74 Langton St | office ti on the 1st and 2nd floor. new accessible entry, new accessible bathroom and shower, relocation of partition walls and lighting changesDetails
office ti on the 1st and 2nd floor. new accessible entry, new accessible bathroom and shower, relocation of partition walls and lighting changes | $120,000 |
| May 11, 2010 | Expired or cancelled expired Dec 2012 | 1 Dalewood Wy | remove and replace fixtures and sheetrock and tile in two bathrooms at 2nd fl. new electric and plbg. no wall removal. 5/8 sheet rock tupe. no structural work.Details
remove and replace fixtures and sheetrock and tile in two bathrooms at 2nd fl. new electric and plbg. no wall removal. 5/8 sheet rock tupe. no structural work. | $14,000 |
| Nov 10, 2009 | Completed final sign-off Apr 2010 | 1 Dalewood Wy | remvoe & replace toilet, vanity, shower, tile, sheetrock and replace in swing door with pocket door in top floor bathroom. no add or moving walls. lighting to comply with title 24 energy codes.Details
remvoe & replace toilet, vanity, shower, tile, sheetrock and replace in swing door with pocket door in top floor bathroom. no add or moving walls. lighting to comply with title 24 energy codes. | $13,000 |
| Apr 4, 2008 | Completed final sign-off Oct 2008 | 601 04th St | remove + replace bath tile, vanity & sinks, shower fixtrues remove + replace kitchen cabinets, counter top, appliances.Details
remove + replace bath tile, vanity & sinks, shower fixtrues remove + replace kitchen cabinets, counter top, appliances. | $65,000 |
| Apr 4, 2008 | Completed final sign-off Feb 2009 | 2136 Pierce St | remove & replace fixtures and tile in 1st floor powder room. 2nd floor bathroom, 3rd fl bathroom, remove and replace counter and sink in 2nd flr bath #2.Details
remove & replace fixtures and tile in 1st floor powder room. 2nd floor bathroom, 3rd fl bathroom, remove and replace counter and sink in 2nd flr bath #2. | $75,000 |
| May 24, 2007 | Completed final sign-off Jan 2008 | 2898 Broadway | 2/fl bath - remove and replace tile. remove and cap plumbing vanity #1. remove and replace vanity #2. remove tub and tile replace with shower. provide fluorescent lights or occupancy sensor in bathroom.Details
2/fl bath - remove and replace tile. remove and cap plumbing vanity #1. remove and replace vanity #2. remove tub and tile replace with shower. provide fluorescent lights or occupancy sensor in bathroom. | $23,000 |
| May 17, 2005 | Completed final sign-off Jan 2006 | 157 Commonwealth Av | remove & replace tub, shower valve & tile in 2nd flr small bath; remove & replace tub, shower valve,Details
remove & replace tub, shower valve & tile in 2nd flr small bath; remove & replace tub, shower valve, | $30,000 |