Back to bathroom remodel contractors
S F Garage Company Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Apr 2026
- Last 24 months
- 6 permits filed
1,559 permits since 2000: 1,030 completed, 5 in progress, 177 never finaled, 347 expired or cancelled.
Of the 177 never-finaled permits, 3 are 3 to 5 years old, 18 are 5 to 10 years old, 156 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
221 bathroom remodel permits: 157 completed, 24 never finaled, 40 expired or cancelled. Typically 1 days from filing to permit and 358 days from permit to final inspection.
Showing the 100 most recent of 221.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2023 | Completed final sign-off Mar 2024 | 908 Post St | new bathroom in sleeping room 15 on 3rd floor. no kitchen to be added.ccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccDetails
new bathroom in sleeping room 15 on 3rd floor. no kitchen to be added.cccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc | $25,300 |
| Nov 27, 2023 | Completed final sign-off Mar 2024 | 908 Post St | new bathroom in 25 at 4th fl. no kitchen to be addedDetails
new bathroom in 25 at 4th fl. no kitchen to be added | $27,300 |
| Aug 11, 2023 | Completed final sign-off Jan 2024 | 908 Post St | remodel in-kind common bathroom 2/f, new bathroom added in room 6-2/f, new bathroom added in room 18-3/f. no residential unit will be connected or demolished.Details
remodel in-kind common bathroom 2/f, new bathroom added in room 6-2/f, new bathroom added in room 18-3/f. no residential unit will be connected or demolished. | $77,005 |
| Aug 3, 2023 | Completed final sign-off Mar 2024 | 1551 Franklin St | new bathroom for unit 1551 franklinDetails
new bathroom for unit 1551 franklin | $27,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 201 14th Av | comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit.Details
comply with nov# 202303713: remodel of (3) kitchens and (6) bathrooms in kind. call for start of work inspection upon issuance of permit. | $67,000 |
| Dec 28, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | 3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added.Details
3/f-unit 16: install (n) bathroom. there is no existing kitchen in room #16 and no kitchen to be added. | $10,833 |
| Aug 10, 2022 | Expired or cancelled expired Dec 2024 | 908 Post St | install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added.Details
install (n) bathroom for 24 on 4th floor. there is no existing kitchen in room #24 and no kitchen to be added. | $7,500 |
| Apr 14, 2022 | Completed final sign-off May 2023 | 524 Oak St | (n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window.Details
(n) floor plan for all 3 floors. 1st fl: (n) bedroom, windows at front for bedroom egress. excavate portion of front for (n) windows, kitchen, office, laundry. (n) door. remove encloser. 2nd fl: remodel kitchen. relocate laundry. (n) window. 3rd fl: remove int stairs, remodel bath. (n) window. | $75,000 |
| Jan 26, 2022 | Completed final sign-off May 2023 | 524 Oak St | remodel ground floor bar, kitchen, laundry room and replacement of tub in 2nd floor bathroom. all non structural. single family dwelling.Details
remodel ground floor bar, kitchen, laundry room and replacement of tub in 2nd floor bathroom. all non structural. single family dwelling. | $40,000 |
| Jan 26, 2022 | Completed final sign-off Feb 2023 | 264 Gold Mine Dr | revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade.Details
revision to bpa#202012211452 minor floor revisions basement-(n) bathroom / 1st fl: remodel(e)bathroom, (n) laundry closet. 2nd fl: kitchen remodel, remodel master bathroom & closet, relocate common bathroom (n) skylights/facade: replace facade window in kind. (n) garage door,(n) stucco facade. | $30,000 |
| Nov 17, 2021 | Completed final sign-off May 2022 | 908 Post St | new bathroom for room 12 2nd fl. no kitchenDetails
new bathroom for room 12 2nd fl. no kitchen | $7,500 |
| Jul 21, 2021 | Completed final sign-off Apr 2023 | 20 Nobles Al | remodel in kind 1 master bathroom 5x7; new electrical fixture, new light fixtures, new plumbnig - sink, faucet, shower head, new tileDetails
remodel in kind 1 master bathroom 5x7; new electrical fixture, new light fixtures, new plumbnig - sink, faucet, shower head, new tile | $28,000 |
| Jun 29, 2021 | Expired or cancelled expired Dec 2024 | 1337 Greenwich St | 1st flr: remodel (e) bathroom. 2nd flr: remodel of unit 1339. 3rd flr: remodel of unit 1337.Details
1st flr: remodel (e) bathroom. 2nd flr: remodel of unit 1339. 3rd flr: remodel of unit 1337. | $70,000 |
| Apr 23, 2021 | Never finaled filed Apr 2021, never issued | 960 Filbert St | raise bldg 18" (n)garage/seismic upgrade. (n)277 sqft garage.(n)586 sqft adu:#960a 2-bed,2-bath,1-living rm &1-kitchen. remodel 3rd/4th fl. infill east lightwell.square off rear bays on 3rd/4th fl. push back entry door to create req'd 3' landing. expand (e)roofdeck. (n)int'r stair access to roofdeckDetails
raise bldg 18" (n)garage/seismic upgrade. (n)277 sqft garage.(n)586 sqft adu:#960a 2-bed,2-bath,1-living rm &1-kitchen. remodel 3rd/4th fl. infill east lightwell.square off rear bays on 3rd/4th fl. push back entry door to create req'd 3' landing. expand (e)roofdeck. (n)int'r stair access to roofdeck | $600,000 |
| Mar 26, 2021 | Completed final sign-off Dec 2025 | 324 Collingwood St | reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub.Details
reconfigure 3/f to add 2 (n) bedrooms, 1 (n) bathroom. reconfigure first floor to add 1 (n) half bathh, 1 (n) wet bar in theater room & 1 (n) store, 1 (n) bathroom, 1 (n) second kitchen in family room. add 1(n) wet bar & 1 (n) half bath at 2/f. (n) roof deck w/ new wet bar & 1 (n) hot tub. | $25,000 |
| Mar 11, 2021 | Completed final sign-off Apr 2022 | 18 Nobles Al | for 18b nobles alley: replace in kind shower, toilet, sink and tile (5' x 7'). new radiant heating system for 20 nobles alley, new plumbing for new bathroom for ground floor, replace all plumbing in garage, new drains, install new w/d hook up, and new gas for boiler.Details
for 18b nobles alley: replace in kind shower, toilet, sink and tile (5' x 7'). new radiant heating system for 20 nobles alley, new plumbing for new bathroom for ground floor, replace all plumbing in garage, new drains, install new w/d hook up, and new gas for boiler. | $10,000 |
| Mar 10, 2021 | Expired or cancelled cancelled Mar 2021 | 18 Nobles Al | for 18b nobles alley: replace in kind shower, toilet, sink and tile (5' x 7'). new radiant heating system for 20 nobles alley, new plumbing for new bathroom for ground floor, replace all plumbing in garage, new drains, install new w/d hook up, and new gas for boiler.Details
for 18b nobles alley: replace in kind shower, toilet, sink and tile (5' x 7'). new radiant heating system for 20 nobles alley, new plumbing for new bathroom for ground floor, replace all plumbing in garage, new drains, install new w/d hook up, and new gas for boiler. | $10,000 |
| Nov 21, 2020 | Completed final sign-off May 2021 | 908 Post St | to comply with nov# 202052031. 4th fl remodel bathrooms in room #29 & #30, addition of new bathrooms in #22, #27, #28, #31. remodel of 2 bathrooms on 4th fl.Details
to comply with nov# 202052031. 4th fl remodel bathrooms in room #29 & #30, addition of new bathrooms in #22, #27, #28, #31. remodel of 2 bathrooms on 4th fl. | $90,000 |
| Nov 7, 2020 | Completed final sign-off May 2023 | 908 Post St | 3 (n) bathrooms on 2nd flr & 1 (n) bathroom on 3rd flr (barhrooms added to guess rm #1, 2, & 3 on 2nd fl; and guess rm # 11 on 3rd fl). 1 remodel of common bathroom on 2nd & 3rd flrs. per sfbc da-0.1 add grab bar & phane jacksDetails
3 (n) bathrooms on 2nd flr & 1 (n) bathroom on 3rd flr (barhrooms added to guess rm #1, 2, & 3 on 2nd fl; and guess rm # 11 on 3rd fl). 1 remodel of common bathroom on 2nd & 3rd flrs. per sfbc da-0.1 add grab bar & phane jacks | $150,000 |
| Oct 24, 2020 | Expired or cancelled withdrawn Nov 2020 | 908 Post St | (n) bathrooms on 2nd, 3rd & 4th flrs. confirm as-built conditions on 4th flr - ref pa 202010015657 and pa 202010025733Details
(n) bathrooms on 2nd, 3rd & 4th flrs. confirm as-built conditions on 4th flr - ref pa 202010015657 and pa 202010025733 | $30,000 |
| Oct 2, 2020 | Completed final sign-off May 2023 | 908 Post St | remodel in-kind rooms (1, 2, 3, 11, 19) as well as 2 common bathrooms on 4th fl and 2 common bathroom on 3rd fl. protected guess rm will not be demolitshed or change of use under this permit.Details
remodel in-kind rooms (1, 2, 3, 11, 19) as well as 2 common bathrooms on 4th fl and 2 common bathroom on 3rd fl. protected guess rm will not be demolitshed or change of use under this permit. | $150,000 |
| Sep 18, 2020 | Expired or cancelled suspend Oct 2024 | 79 28th St | remodel in kind kitchen, 3 bathrooms, laundry, all rooms on 3 levels. remove laith and plaster, add 5/8 sheetrock throughout. add 5/8 type x on property line walls. walls to remain.Details
remodel in kind kitchen, 3 bathrooms, laundry, all rooms on 3 levels. remove laith and plaster, add 5/8 sheetrock throughout. add 5/8 type x on property line walls. walls to remain. | $400,000 |
| Sep 18, 2020 | Completed final sign-off Sep 2020 | 819 Lombard St | to comply with nov# 201807921 including: bathroom level of brick chimneys that extend to roof have been removed leaving chimneys unstable. they were braced with steel and inspected by eor. "new foundation without inspections". all foundations inspected and refer to job card.Details
to comply with nov# 201807921 including: bathroom level of brick chimneys that extend to roof have been removed leaving chimneys unstable. they were braced with steel and inspected by eor. "new foundation without inspections". all foundations inspected and refer to job card. | |
| Aug 27, 2020 | Completed final sign-off Feb 2022 | 249 14th Av | unit #247 & #249: remodel in-kind 2 kitchens, 8 bathrooms, & 2 laundry room. remove all 1/2 sheetrock and install 5/8 type x sheetrock on pl walls and ceiling separation. replace all windows and doors in-kind. all work in-kind. no removal or layout change of walls.Details
unit #247 & #249: remodel in-kind 2 kitchens, 8 bathrooms, & 2 laundry room. remove all 1/2 sheetrock and install 5/8 type x sheetrock on pl walls and ceiling separation. replace all windows and doors in-kind. all work in-kind. no removal or layout change of walls. | $400,000 |
| May 21, 2020 | Expired or cancelled revoked Oct 2020 | 3665 Clay St | remodel in kind all bathrooms, laundry, kitchen, and upgrade all utilties throughout. remove laith and plaster throughout, and 5/8 type x throughout. everything in kind only.Details
remodel in kind all bathrooms, laundry, kitchen, and upgrade all utilties throughout. remove laith and plaster throughout, and 5/8 type x throughout. everything in kind only. | $312,000 |
| Mar 16, 2020 | Completed final sign-off Jun 2021 | 660 De Haro St | excavation for two patios in rear yard. remove exterior steps & (n) entry door @ front facade. remove windows, exterior door @ north. (n) multi slider door at rear. remove (e) deck covering at rear. remove of (e) vinyl siding at side & rear. 2 kitchen remodels, bathroom remodel, bathroom relocation.Details
excavation for two patios in rear yard. remove exterior steps & (n) entry door @ front facade. remove windows, exterior door @ north. (n) multi slider door at rear. remove (e) deck covering at rear. remove of (e) vinyl siding at side & rear. 2 kitchen remodels, bathroom remodel, bathroom relocation. | $20,000 |
| Mar 16, 2020 | Completed final sign-off May 2023 | 20 Nobles Al | conversion of (e) garage/storage space to new habital space for unit #20, (n) family room, (n) bathroomDetails
conversion of (e) garage/storage space to new habital space for unit #20, (n) family room, (n) bathroom | $15,000 |
| Dec 13, 2019 | Completed final sign-off Dec 2020 | 1336 Green St | unit 6. remodel kitchen and bath in-kind. remove all lath and plaster and replace w/ 5/8 type x sheetrock in kitchen and bath. approx 150 sq ftDetails
unit 6. remodel kitchen and bath in-kind. remove all lath and plaster and replace w/ 5/8 type x sheetrock in kitchen and bath. approx 150 sq ft | $30,000 |
| Aug 14, 2019 | Completed final sign-off Oct 2020 | 1852 Mason St | excavation pf crawl space for structural addition of grade beams. (n) media room, bathroom and laundry in excavated area. ref pa# 2019-0723-6749.Details
excavation pf crawl space for structural addition of grade beams. (n) media room, bathroom and laundry in excavated area. ref pa# 2019-0723-6749. | $50,000 |
| Jul 25, 2019 | Completed final sign-off Jun 2020 | 341 Day St | add dwelling unit# 341a(872 sq ft) w/ one bathroom and one kitchen.Details
add dwelling unit# 341a(872 sq ft) w/ one bathroom and one kitchen. | $4,000 |
| May 16, 2019 | Completed final sign-off May 2019 | 170 Dolores St | remodel of bathroom on 2nd fl/convert (e) powder room to (n) closet. reconfiguration of stairs into garage.Details
remodel of bathroom on 2nd fl/convert (e) powder room to (n) closet. reconfiguration of stairs into garage. | $30,000 |
| Apr 25, 2019 | Completed final sign-off Jan 2020 | 1706 Grove St | revision to adu pa 201602099105. relocation of bathroom at 1st flr, add space for washer & dryer, rear double doors changed to single door, extend counter top.Details
revision to adu pa 201602099105. relocation of bathroom at 1st flr, add space for washer & dryer, rear double doors changed to single door, extend counter top. | |
| Apr 24, 2019 | Completed final sign-off Jan 2021 | 747 Waller St | relocation of bathroom (n) office nook and laundry room expansionDetails
relocation of bathroom (n) office nook and laundry room expansion | $15,000 |
| Feb 14, 2019 | Completed final sign-off Sep 2024 | 2008 Vallejo St | remodel of all fls: new elevator. 1/f: new bedroom, bath, powder room, laundry and 2 closets, wine celler. 2/f: new poweder room & 2 closets. 3/f: new master bath, bedroom, closet and bath. 4/f: new bath, new roof deck.Details
remodel of all fls: new elevator. 1/f: new bedroom, bath, powder room, laundry and 2 closets, wine celler. 2/f: new poweder room & 2 closets. 3/f: new master bath, bedroom, closet and bath. 4/f: new bath, new roof deck. | $100,000 |
| Jan 28, 2019 | Completed final sign-off Aug 2021 | 206 Edgewood Av | remodel of bedrooms and bathrooms on 3rd floor floor.Details
remodel of bedrooms and bathrooms on 3rd floor floor. | $15,000 |
| Jan 9, 2019 | Completed final sign-off Jul 2021 | 3810 18th St | expansion of garage and infill of light court on 1st flr 2nd/3rd/4th flr - each add w/d, add 1 full bath and double closets in bedroom//vif bedroom windows to be compliant with section 1030 cfc- emergency escape and rescue windowsDetails
expansion of garage and infill of light court on 1st flr 2nd/3rd/4th flr - each add w/d, add 1 full bath and double closets in bedroom//vif bedroom windows to be compliant with section 1030 cfc- emergency escape and rescue windows | $40,000 |
| Jan 4, 2019 | Completed final sign-off May 2019 | 170 Dolores St | revision to bpa# 2018-0823-8204. first floor: relocation of bathroom and closet. second floor: relocation of bathroom and stairs. third floor: new closet. fouth floor: relocate bathroom and new stairs. roof: relocation of stairs.Details
revision to bpa# 2018-0823-8204. first floor: relocation of bathroom and closet. second floor: relocation of bathroom and stairs. third floor: new closet. fouth floor: relocate bathroom and new stairs. roof: relocation of stairs. | |
| Dec 4, 2018 | Completed final sign-off Nov 2019 | 2667 Clay St | expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new officeDetails
expansion of existing garage and remodel of 1st & 2nd floor. 1st floor - garage expansion, relocation of bath and w/d. new storage, wind cellar and stairs;2nd fl - kitchen expansion and new office | $20,000 |
| Oct 25, 2018 | Expired or cancelled expired Dec 2024 | 3834 Geary Bl | addition of (1)(n) unit on 1st floor at rear storage building per ordinance #162-16. (n) unit #11: 300 sq ft studio with (1) kitchen and (1) bathroomDetails
addition of (1)(n) unit on 1st floor at rear storage building per ordinance #162-16. (n) unit #11: 300 sq ft studio with (1) kitchen and (1) bathroom | $30,000 |
| Sep 18, 2018 | Completed final sign-off Nov 2019 | 2667 Clay St | first floor new bedroom, new bathroom, new closet. change to front facade lower door & 2 new windows.Details
first floor new bedroom, new bathroom, new closet. change to front facade lower door & 2 new windows. | $10,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2021 | 747 Waller St | conversion of 707 sf existing crawl space to habitable space for unit 747. 1st fl - new family room, new bathroom, new utility closet and new laundry; 2nd fl - new stairs and new handrail and new water closetDetails
conversion of 707 sf existing crawl space to habitable space for unit 747. 1st fl - new family room, new bathroom, new utility closet and new laundry; 2nd fl - new stairs and new handrail and new water closet | $80,000 |
| Aug 23, 2018 | Completed final sign-off May 2019 | 170 Dolores St | new roof deck, complete infill of north lightwell on floors 2, 3 and 4. complete infill of north lightwell. 1st flr: convert 621 sq ft of storage to master bedrm & bathrm. 2nd flr: layout change. liv rm &office to bedrm 1 and 2. bedroom to liv rm. new bath & stairsDetails
new roof deck, complete infill of north lightwell on floors 2, 3 and 4. complete infill of north lightwell. 1st flr: convert 621 sq ft of storage to master bedrm & bathrm. 2nd flr: layout change. liv rm &office to bedrm 1 and 2. bedroom to liv rm. new bath & stairs | $120,000 |
| Jul 16, 2018 | Expired or cancelled expired Feb 2022 | 2799 Sacramento St | relocation of ada bathroom approves per bpa #201708043909.Details
relocation of ada bathroom approves per bpa #201708043909. | |
| Jul 5, 2018 | Completed final sign-off Mar 2019 | 2046 Filbert St | remodel & expanion of unit #2046, conversion of 561 sq ft on ground fl to habitalbe space for unit #2046. relocate kitchen & living room, to ground fl. addition of master bath on 2nd fl. with layout change per plans, remodel unit #2048 with new layout throughout 3rd fl. (n) roof deck for unit #2048Details
remodel & expanion of unit #2046, conversion of 561 sq ft on ground fl to habitalbe space for unit #2046. relocate kitchen & living room, to ground fl. addition of master bath on 2nd fl. with layout change per plans, remodel unit #2048 with new layout throughout 3rd fl. (n) roof deck for unit #2048 | $75,000 |
| Jul 2, 2018 | Completed final sign-off Mar 2019 | 2048 Filbert St | lath & plaster with new 5/8" type x sheetrock. throughout all floors as needed. remodel 2 kitchens, 4 bathrooms and 2 laundry rooms for both units in-kind. no structural or relocation of any wall / window under this permitDetails
lath & plaster with new 5/8" type x sheetrock. throughout all floors as needed. remodel 2 kitchens, 4 bathrooms and 2 laundry rooms for both units in-kind. no structural or relocation of any wall / window under this permit | $60,000 |
| Apr 4, 2018 | Completed final sign-off Jan 2019 | 109 Clement St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. revision to soft story permit bpa #201709137897. change to shearwall per plans. remodel first floor bathroom to fully comply with ada standards.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. revision to soft story permit bpa #201709137897. change to shearwall per plans. remodel first floor bathroom to fully comply with ada standards. | |
| Apr 4, 2018 | Completed final sign-off Sep 2019 | 558 Filbert St | remodel of unit 558 filbert #10 - (e - approved) 1 living toom, 2 bedrooms, 1 bath, 1 kitchen. (n - proposed change to existing) - 1 living room, 3 bedrooms, 1 dining, 2 bathrooms, 1 kitchen, bu expanding into garage space ref 201604074232. revision to soft story pa#: 201603293409.Details
remodel of unit 558 filbert #10 - (e - approved) 1 living toom, 2 bedrooms, 1 bath, 1 kitchen. (n - proposed change to existing) - 1 living room, 3 bedrooms, 1 dining, 2 bathrooms, 1 kitchen, bu expanding into garage space ref 201604074232. revision to soft story pa#: 201603293409. | $50,000 |
| Mar 2, 2018 | Completed final sign-off Sep 2018 | 2810 Washington St | unit #2: remodel bathroom, kitchen, & 2 bedrooms in kind. new cabinets, vanity, sinks, toilet, plumbing fixtures. no structural work under this permit. no change of any (e) walls or new openings.Details
unit #2: remodel bathroom, kitchen, & 2 bedrooms in kind. new cabinets, vanity, sinks, toilet, plumbing fixtures. no structural work under this permit. no change of any (e) walls or new openings. | $40,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2021 | 139 Baker St | addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu.Details
addition of (2)(n) dwelling units on 1st floor per ordinance 162-16. (2) kitchens, (2) bedrooms, (2) bathrooms. revision to soft-story seismic retrofit pa# 2017-0908-7339: relocate shearwall locations to accommadate (n) adu. | $100,000 |
| Nov 2, 2017 | Completed final sign-off Apr 2019 | 2810 Washington St | additional of (n) unit on 2nd fl per ordinance #162-16. studio w/ (1) kitchen, (1) bathroom.Details
additional of (n) unit on 2nd fl per ordinance #162-16. studio w/ (1) kitchen, (1) bathroom. | $60,000 |
| Oct 11, 2017 | Completed final sign-off Apr 2019 | 2810 Washington St | remodel and expansion of existing unit 1 on 1st fl expand studio with 1 bath and kitchen to 1 living rm, 1 kitchen, 1 bedroom, 2 baths, office and media room.Details
remodel and expansion of existing unit 1 on 1st fl expand studio with 1 bath and kitchen to 1 living rm, 1 kitchen, 1 bedroom, 2 baths, office and media room. | $75,000 |
| Jun 21, 2017 | Completed final sign-off Jun 2021 | 248 Page St | add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath.Details
add 3 adu's per ordinance# 162-16 @ ground floor. unit"a": 2 bedroom & 2 baths. unit"b": 1 bedroom & 1 bath. unit "c": 1 bedroom & 1 bath. | $306,000 |
| Jun 12, 2017 | Completed final sign-off Mar 2022 | 1477 California St | add new unit on 1st floor per ord 162-16. 1 bedroom, 1 living room, 1 kitchen, 1 bathroom. ** maher: n/a **Details
add new unit on 1st floor per ord 162-16. 1 bedroom, 1 living room, 1 kitchen, 1 bathroom. ** maher: n/a ** | $65,000 |
| Apr 6, 2017 | Completed final sign-off May 2019 | 1240 Filbert St | rev to pa#201612296208: relocate laundry room from basement to 1/f. add (n) bathroom to 1/f. (n) storage closet on basement level. removal of hall way closet per plans.Details
rev to pa#201612296208: relocate laundry room from basement to 1/f. add (n) bathroom to 1/f. (n) storage closet on basement level. removal of hall way closet per plans. | |
| Mar 3, 2017 | Completed final sign-off Jul 2017 | 2068 Pine St | new elevator from garage to 3rd flr. relocation of laundry room on 3rd flr. new laundry room on 1st flr. remodel of bar on 2nd flr. reconfiguration of master bath on 3rd flr. repair front stairs, install new layer of waterproofing and new tileDetails
new elevator from garage to 3rd flr. relocation of laundry room on 3rd flr. new laundry room on 1st flr. remodel of bar on 2nd flr. reconfiguration of master bath on 3rd flr. repair front stairs, install new layer of waterproofing and new tile | $40,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 2684 Sacramento St | reconfigure main staircase; reconfigure 1st floor bath rm, closet & bedrm closet; reconfigure 2nd floor powder rm, relocate coat closet; reconfigure 3rd fl master bathrm, master closet, office, bedroom, closets and common bathrm. enlarge roof deck hatch. all walls being changed are not bearingDetails
reconfigure main staircase; reconfigure 1st floor bath rm, closet & bedrm closet; reconfigure 2nd floor powder rm, relocate coat closet; reconfigure 3rd fl master bathrm, master closet, office, bedroom, closets and common bathrm. enlarge roof deck hatch. all walls being changed are not bearing | $20,000 |
| Nov 10, 2016 | Completed final sign-off Mar 2019 | 331 Vicente St | rooms down. to add a bedroom bathroom & deck to the existing garage space to replace rear windows w/sliding door in-kind.Details
rooms down. to add a bedroom bathroom & deck to the existing garage space to replace rear windows w/sliding door in-kind. | $20,000 |
| Sep 27, 2016 | Completed final sign-off May 2018 | 2127 Taylor St | rear bldg. per unit legalization ordinance# 43-14. legalization of unit# 7 on 1st floor of 2131 taylor located in rear building. 1 bed, 1 bath, 1 kitchen.Details
rear bldg. per unit legalization ordinance# 43-14. legalization of unit# 7 on 1st floor of 2131 taylor located in rear building. 1 bed, 1 bath, 1 kitchen. | $20,000 |
| Sep 27, 2016 | Completed final sign-off Aug 2021 | 60 Sycamore St | addition of 2 new units (1 bed, 1 bath & 1 kitchen each) @ basement level per ordinance no# 30-15. soft story pa# 2015/07/14/1407. ** maher: n/a **Details
addition of 2 new units (1 bed, 1 bath & 1 kitchen each) @ basement level per ordinance no# 30-15. soft story pa# 2015/07/14/1407. ** maher: n/a ** | $100,000 |
| Sep 13, 2016 | Completed final sign-off Mar 2019 | 1125 Union St | add unit per ord 30-15. add 2 units on grd floor. unit 7:434.6 sq ft with 1 bedroom,1 bath,1 kitchen,1 living room. unit 8:770.8 sq ft, with 1 bath,1 office,1 kitchen, 1 bedroom, 1 living room ** maher: n/a **Details
add unit per ord 30-15. add 2 units on grd floor. unit 7:434.6 sq ft with 1 bedroom,1 bath,1 kitchen,1 living room. unit 8:770.8 sq ft, with 1 bath,1 office,1 kitchen, 1 bedroom, 1 living room ** maher: n/a ** | $150,000 |
| Sep 1, 2016 | Completed final sign-off Oct 2021 | 909 Page St | addition of 2 units in basement per ordinance no.30-15 (n) studio unit #19=511 sq. ft. one bed/living room, one kitchen, one bahroom(n) studio unit #20=653 sq. ft. one bed/living room, one kitchen, one bathroom. seismic application (bpa #2015-11-23-3349). sprinkler deferred.Details
addition of 2 units in basement per ordinance no.30-15 (n) studio unit #19=511 sq. ft. one bed/living room, one kitchen, one bahroom(n) studio unit #20=653 sq. ft. one bed/living room, one kitchen, one bathroom. seismic application (bpa #2015-11-23-3349). sprinkler deferred. | $100,000 |
| Aug 11, 2016 | Expired or cancelled expired Aug 2021 | 1470 Mcallister St | remove and infill exterior door on 1st floor. relocate bathroom on 1st floor, create storage spaceDetails
remove and infill exterior door on 1st floor. relocate bathroom on 1st floor, create storage space | $10,000 |
| May 26, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x.Details
front building: remodel 1 kitchen and 1 bath, replace all interior finishes. new drywall and insulaton. new plumbing fixtures and lighting & casework. no changes to location of, removal of, or addition of walls. no changes to existing layout. all new drywall to be 5/8" type x. | $20,000 |
| May 18, 2016 | Completed final sign-off Oct 2016 | 2068 Pine St | revision to bpa #2015-0929-8309. new framing plans. new seismic design. change to: bathrooms all floors, kitchen 1st & 2nd floor, living room 1st floor.Details
revision to bpa #2015-0929-8309. new framing plans. new seismic design. change to: bathrooms all floors, kitchen 1st & 2nd floor, living room 1st floor. | $25,000 |
| Mar 23, 2016 | Completed final sign-off Jul 2019 | 1236 Haight St | addition of a new unit (772.75 sq.st) per ordinance no.30-15 seismic retrofit app# 201601006808 new unit: one bedroom, one bathroom, one kitchen.Details
addition of a new unit (772.75 sq.st) per ordinance no.30-15 seismic retrofit app# 201601006808 new unit: one bedroom, one bathroom, one kitchen. | $30,000 |
| Feb 9, 2016 | Completed final sign-off Jan 2020 | 1706 Grove St | addition of 1 new unit (653.6 sq.ft.) in 1st floor per ordinance# 30-15. seismic application pa# 201502188573. new unit has 2 bedrooms, 1 bath & 1 kitchen.Details
addition of 1 new unit (653.6 sq.ft.) in 1st floor per ordinance# 30-15. seismic application pa# 201502188573. new unit has 2 bedrooms, 1 bath & 1 kitchen. | $50,000 |
| Feb 9, 2016 | Expired or cancelled expired Dec 2024 | 376 Union St | addition of 1 new unit (484.5 sq.ft.) studio unit per ordinance# 30-15. seismic application pa# 201601116806. new unit has 1 bath & 1 kitchen.Details
addition of 1 new unit (484.5 sq.ft.) studio unit per ordinance# 30-15. seismic application pa# 201601116806. new unit has 1 bath & 1 kitchen. | $20,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2021 | 650 De Haro St | rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150kDetails
rear building: remodel 2 kitchens & 2 bathrooms in kind , install new insulation & drywall at affected areas install new plumbing fixtures, lighting, casework & flooring, work located at rear building, no structural work or removal/ or relocate wall. in kitchen lighting & control per cec 150k | $35,000 |
| Jan 20, 2016 | Expired or cancelled expired Dec 2024 | 570 Ofarrell St | new sheetrock as needed & hardwood floors replacement for rooms 100-121. no room #113 & 200-221. no room #213. retile 6 common bathroom, replace all interior doors in kind. replace with 5/8" type x sheetrock. no structural work under this permitDetails
new sheetrock as needed & hardwood floors replacement for rooms 100-121. no room #113 & 200-221. no room #213. retile 6 common bathroom, replace all interior doors in kind. replace with 5/8" type x sheetrock. no structural work under this permit | $70,000 |
| Dec 11, 2015 | Completed final sign-off Oct 2016 | 1050 Lake St | add (n) unit per ord. 30-15 seismic application #201504012578. (2) bedrooms & (1) bathroom & (1) kitchen.Details
add (n) unit per ord. 30-15 seismic application #201504012578. (2) bedrooms & (1) bathroom & (1) kitchen. | $10,000 |
| Nov 6, 2015 | Expired or cancelled expired Dec 2024 | 423 Green St | unit #423: remodel kitchen & bathroom in kind. no structural work. kitchen: min 50% of kitchen light watts by h.e. fixture. bathroom: h.e. or t-24 vacany sensor.Details
unit #423: remodel kitchen & bathroom in kind. no structural work. kitchen: min 50% of kitchen light watts by h.e. fixture. bathroom: h.e. or t-24 vacany sensor. | $25,000 |
| Oct 16, 2015 | Expired or cancelled expired Dec 2024 | 610 Fillmore St | remodel of (e) bathrooms for units 101, 201 & 301 in kind. comply cec 150 (k). no structural work. no relocation of doorsDetails
remodel of (e) bathrooms for units 101, 201 & 301 in kind. comply cec 150 (k). no structural work. no relocation of doors | $39,000 |
| Sep 23, 2015 | Completed final sign-off Sep 2016 | 1690 Grove St | remodel kitchen and 1 bathroom in kind. new cabinets, sink, vanity, toilet, bathtub, tiles & light fixture. comply w/ cec 150(k) no structural workDetails
remodel kitchen and 1 bathroom in kind. new cabinets, sink, vanity, toilet, bathtub, tiles & light fixture. comply w/ cec 150(k) no structural work | $25,000 |
| Jun 17, 2015 | Expired or cancelled expired Dec 2024 | 2941 Mission St | unit #3 - remodel kitchen (8x8) & bathroom (5x8) in kind, new cabinets, sinks, countertop, toilets, bathtub & vanity. no structural work, no change to opening & wall layouts. 50% lighting wattage shall be high efficacy. comply with cec 150(k).Details
unit #3 - remodel kitchen (8x8) & bathroom (5x8) in kind, new cabinets, sinks, countertop, toilets, bathtub & vanity. no structural work, no change to opening & wall layouts. 50% lighting wattage shall be high efficacy. comply with cec 150(k). | $20,000 |
| Jun 3, 2015 | Expired or cancelled expired Jan 2026 | 3751 20th St | new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath.Details
new 3-story horizontal addition at rear. new living level below (e) structure. new below-grade garage at street level. new retaining walls at rear yard. replace existing gable window(alum) w/ new wood window. repair/replace existing wood window sashes where indicated.new living room,bedrooms,bath. | $1,500,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | unit #9: remodel kitchen & bathroom in kind, no structural work, complyy with cec 150(k) all work in unit #9, no wall moved or removed, or added.all existing layouts to remain unchanged.Details
unit #9: remodel kitchen & bathroom in kind, no structural work, complyy with cec 150(k) all work in unit #9, no wall moved or removed, or added.all existing layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | remodel kitchen and bathroom in kind. no structural work. comply with cec 150(k). all work in unit 38. no walls moved, removed or added. all (e) layouts to remain unchanged.Details
remodel kitchen and bathroom in kind. no structural work. comply with cec 150(k). all work in unit 38. no walls moved, removed or added. all (e) layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Jun 2018 | 2395 26th Av | remodel kitchen and bath. no structural. comply with cec 150 k. all work in unit 1. no walls moved, removed or added. all existing layouts remain unchanged.Details
remodel kitchen and bath. no structural. comply with cec 150 k. all work in unit 1. no walls moved, removed or added. all existing layouts remain unchanged. | $25,000 |
| Mar 27, 2015 | Expired or cancelled expired Apr 2018 | 2395 26th Av | unit #11: remodel kitchen & bathroom in kind, no structural work, comply with cec 150(k) all work in unit #11, no wall moved or removed or added, all (e) layouts to remain unchanged.Details
unit #11: remodel kitchen & bathroom in kind, no structural work, comply with cec 150(k) all work in unit #11, no wall moved or removed or added, all (e) layouts to remain unchanged. | $15,000 |
| Mar 27, 2015 | Expired or cancelled expired Jun 2018 | 2395 26th Av | unit #5 remodel kitchen & bathroom in kind. no structural work. to comply with iso(k). no walls moved or added. all (e) layout to remain the sameDetails
unit #5 remodel kitchen & bathroom in kind. no structural work. to comply with iso(k). no walls moved or added. all (e) layout to remain the same | $15,000 |
| Mar 11, 2015 | Expired or cancelled expired Dec 2024 | 2697 Mission St | unit 104 - remodel master bathroom in kind; (n) tub, toilet, sinks, vanity& tiles ; no structural work; to comply with cec150.0(k)5Details
unit 104 - remodel master bathroom in kind; (n) tub, toilet, sinks, vanity& tiles ; no structural work; to comply with cec150.0(k)5 | $10,000 |
| Jan 16, 2015 | Expired or cancelled expired Dec 2024 | 45 Mccoppin St | remodel (1) kitchen, (10) kitchenette, & (8-1/2) bathrooms in kind. remodel two ada bathrooms in kind. new 5/8" type x gyp throughout second & third floor as needed.Details
remodel (1) kitchen, (10) kitchenette, & (8-1/2) bathrooms in kind. remodel two ada bathrooms in kind. new 5/8" type x gyp throughout second & third floor as needed. | $90,000 |
| Jan 8, 2015 | Completed final sign-off Mar 2016 | 120 10th St | remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/aDetails
remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/a | $70,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck.Details
rear bldg: basement: convert storage to habitable space including study, bedroom and bath. remodel kitchen and relocate stair to upper floor. at top floor remodel bedrooms and bathroom. new wood siding at front. new window and new roof deck. | $250,000 |
| Nov 19, 2014 | Completed final sign-off Nov 2021 | 456 Vallejo St | front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks.Details
front bldg: unit #1: remodel unit including kitchen & bathroom. unit# 2: remodel unit including kitchen & bathroom. unit# 3: remodel unit including kitchen & bath. convert storage area at 1st floor into habitalbe space. provide connecting stair. new private roof decks. | $300,000 |
| Oct 27, 2014 | Completed final sign-off May 2015 | 1480 Mcallister St | replace e foudation in crawl space and add new steel beam. remodel 8 full bathrooms, 3 kitchens, 3 half bathrooms, new lath and plaster, 3 laundry rooms, all remodels in kind.Details
replace e foudation in crawl space and add new steel beam. remodel 8 full bathrooms, 3 kitchens, 3 half bathrooms, new lath and plaster, 3 laundry rooms, all remodels in kind. | $20,000 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 235 Eddy St | replace (e) exhaust fan & shower door(s) for community bathroom. (n) paint repair/replace bathroom door in kind.Details
replace (e) exhaust fan & shower door(s) for community bathroom. (n) paint repair/replace bathroom door in kind. | $500 |
| Sep 12, 2014 | Completed final sign-off Dec 2018 | 590 Lombard St | expand building within footprint. change 2 garage doors to similar looking windows. excavate garage for expansion. new plumbing, elec, hydronic heat, venting. sprinklers sep permit. new 1hr fire rated construction. replace kitchens and baths, new insulation, new interior finishes and roof decksDetails
expand building within footprint. change 2 garage doors to similar looking windows. excavate garage for expansion. new plumbing, elec, hydronic heat, venting. sprinklers sep permit. new 1hr fire rated construction. replace kitchens and baths, new insulation, new interior finishes and roof decks | $900,000 |
| Aug 11, 2014 | Completed final sign-off Aug 2016 | 2400 Vallejo St | revision to issued pa #2012.1106.3591 - changes proposed for new walls & new 1/2 bath; structural revisions to accommodate new wall locations. n/a maher ordinanceDetails
revision to issued pa #2012.1106.3591 - changes proposed for new walls & new 1/2 bath; structural revisions to accommodate new wall locations. n/a maher ordinance | $65,000 |
| Jul 22, 2014 | Completed final sign-off Dec 2014 | 1754 Mission St | unit 1: remodel kitchen & bathroom in kind, remove all lath & plaster du to bed bug infestation, replace with 5/8" type x sheetrock. kitchen: min 50% kitchen lighting by h.e watt fixture, bathroom t-24 or occupancy sensor.Details
unit 1: remodel kitchen & bathroom in kind, remove all lath & plaster du to bed bug infestation, replace with 5/8" type x sheetrock. kitchen: min 50% kitchen lighting by h.e watt fixture, bathroom t-24 or occupancy sensor. | $20,000 |
| Jul 16, 2014 | Completed final sign-off Dec 2014 | 1882 Mcallister St | remodel 4 bathrooms & two kithchen in kind. new fixtures & lighting througout both unit. (n) 5/8" sheetrock throughout both units. kitchen: min 50% kitchen lighting by h.e watt fixture. bathroom: t-24 or occupancy sensor.Details
remodel 4 bathrooms & two kithchen in kind. new fixtures & lighting througout both unit. (n) 5/8" sheetrock throughout both units. kitchen: min 50% kitchen lighting by h.e watt fixture. bathroom: t-24 or occupancy sensor. | $40,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 179 Shawnee Av | remodel kitchen, bathroom and laundry room in kind. sheetrock garage level. no structural work. comply with cec 150 (k); kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen, bathroom and laundry room in kind. sheetrock garage level. no structural work. comply with cec 150 (k); kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor. | $20,000 |
| Jun 13, 2014 | Completed final sign-off Jun 2015 | 3045 Mission St | remodel kitchen and bathroom in kind. new lighting and plumbing as needed. no structural work. comply with cec 150(k). all work in apt. #3. kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen and bathroom in kind. new lighting and plumbing as needed. no structural work. comply with cec 150(k). all work in apt. #3. kitchen: min 50% kitchen lighting watt by h.e. fixture; bathroom: h.e. or t-24 occupancy sensor. | $25,000 |
| May 12, 2014 | Completed final sign-off May 2015 | 421 Green St | remodel kitchen & bathroom in kind. no structural work, comply with cec 150(k). no change on walls. kitchen: min 50% of kitchen lighting h.e fixture. bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen & bathroom in kind. no structural work, comply with cec 150(k). no change on walls. kitchen: min 50% of kitchen lighting h.e fixture. bathroom: h.e. or t-24 occupancy sensor. | $18,000 |
| May 12, 2014 | Completed final sign-off May 2015 | 425 Green St | remodel kitchen & bathroom in kind. new lighting in hallway. no structural work. comply with cec 150(k). kitchen: min 50% kitchen light watt by he. fixture. bathroom: h.e. or t-24 occupancy sensor.Details
remodel kitchen & bathroom in kind. new lighting in hallway. no structural work. comply with cec 150(k). kitchen: min 50% kitchen light watt by he. fixture. bathroom: h.e. or t-24 occupancy sensor. | $18,000 |
| Apr 2, 2014 | Completed final sign-off Feb 2015 | 1308 Masonic Av | unit #3: remove non bearing wall around kitchen. remodel one kitchen and 2 bathrooms. all work in unit #3. kitchen:min 50% of kitchen light watts by h.e. fixture. bath: h.e or t-24 occupancy sensor. no windows and no doors on this permit.Details
unit #3: remove non bearing wall around kitchen. remodel one kitchen and 2 bathrooms. all work in unit #3. kitchen:min 50% of kitchen light watts by h.e. fixture. bath: h.e or t-24 occupancy sensor. no windows and no doors on this permit. | $24,000 |
| Feb 25, 2014 | Completed final sign-off May 2014 | 614 Central Av | construct new half bath adjacent to extg full bathroom. all work in unit 614 only. bath:t-24 or occupancy sensor. comply with cec 150 (k)Details
construct new half bath adjacent to extg full bathroom. all work in unit 614 only. bath:t-24 or occupancy sensor. comply with cec 150 (k) | $6,000 |
| Feb 5, 2014 | Completed final sign-off Nov 2023 | 586 Clipper St | (n) 3rd story addition. extend building 7' at the rear. convert (e) crawl space & storage to (n) habitable area. remodel per plans. 1 master bedroom, 3 bedroom, 1 master bathroom, 3 bathrooms, 2 laundry rms, 2 kitchens, & 2 living rooms.Details
(n) 3rd story addition. extend building 7' at the rear. convert (e) crawl space & storage to (n) habitable area. remodel per plans. 1 master bedroom, 3 bedroom, 1 master bathroom, 3 bathrooms, 2 laundry rms, 2 kitchens, & 2 living rooms. | $90,000 |
| Jan 8, 2014 | Never finaled issued Jan 2014, no final | 610 Fillmore St | work in rooms #110,111,210,211,310 & 311 - remodel (6) bathrooms in kind, no structural work, comply with cec 150(k), total 6 bathrooms.Details
work in rooms #110,111,210,211,310 & 311 - remodel (6) bathrooms in kind, no structural work, comply with cec 150(k), total 6 bathrooms. | $50,000 |
| Dec 13, 2013 | Completed final sign-off May 2014 | 614 Central Av | remodel (1) kitchen & (1-1/2) bathrooms in-kind. no structural work. complyl with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor.Details
remodel (1) kitchen & (1-1/2) bathrooms in-kind. no structural work. complyl with ced 150(k). kitchen: min 50% of kitchen lighting, h.e. by watt fixture. bath: m.e. or t-24 occupancy sensor. | $15,000 |