S C P Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2016 to Oct 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 54 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2016 | Never finaled issued Aug 2016, no final | 4244 25th St | unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skyliteDetails
unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skylite | $100,000 |