Back to kitchen remodel contractors
S A S Construction
- Based in
- Pacifica
- On San Francisco permits
- Jun 2011 to Aug 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2024 | Completed final sign-off Nov 2024 | 1811 28th Av | remove (e) rotten siding t trim and replace with new remove and intalll new marvin kitchen window prime and paint repaint siding on south side of building (side) 1 window 5 litesDetails
remove (e) rotten siding t trim and replace with new remove and intalll new marvin kitchen window prime and paint repaint siding on south side of building (side) 1 window 5 lites | $18,000 |
| Jul 3, 2012 | Completed final sign-off Oct 2012 | 101 Lombard St | update kitchen with new cabinets, sink, faucet and appliances. new counter top in kithcen and bathroom vanity. replace old ceiling lights with new ones. new floor cover through out. redesign flurorencet ceiling light. paint entire unit. raise toilet shet off valve above baseboard.Details
update kitchen with new cabinets, sink, faucet and appliances. new counter top in kithcen and bathroom vanity. replace old ceiling lights with new ones. new floor cover through out. redesign flurorencet ceiling light. paint entire unit. raise toilet shet off valve above baseboard. | $16,000 |
| Aug 30, 2011 | Completed final sign-off May 2012 | 86 Naples St | kitchen remodel - new counter tops, new flooring, lighting, new circuits with receptacles, new cabinet, painting and finishing.Details
kitchen remodel - new counter tops, new flooring, lighting, new circuits with receptacles, new cabinet, painting and finishing. | $15,000 |